{"title":"Florida State Residential Contractor","description":"","products":[{"product_id":"placing-reinforcing-bars-10th-edition","title":"Placing Reinforcing Bars, 10th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003ePLACING REINFORCING BARS, 10TH EDITION\u003c\/h1\u003e\n\u003cp style=\"text-align:center;\"\u003ePlacing Reinforcing Bars, 10th Edition, published by the Concrete Reinforcing Steel Institute (CRSI), is a reference manual widely used in contractor licensing and trade certification exams supported by 1 Exam Prep. This edition covers current reinforcing bar standards, concrete placement practices, splice and lap details, and field installation procedures for structural reinforcement. The book aligns with building codes and specifications relevant to construction professionals preparing for contractor, structural, and general engineering license exams. 1 Exam Prep provides this publication as part of its approved exam book set for Florida and national contractor testing requirements.\u003c\/p\u003e\u003cbr\u003e\n\u003cp class=\"resource-info\"\u003e\u003cspan\u003eThis unique and popular publication presents the best accepted current practices in placing reinforcing bars in structures and pavement. It is written for apprentices, journeymen ironworkers, and inspectors. A definitive resource for preparing provisions in project specifications. Eighteen heavily illustrated chapters cover topics including types of materials, handling of bars at the jobsite, general principles for bar placing, splicing, and tying, bar placement in footings, walls, columns, floors, roofs, pavement and transportation structures. Also includes a chapter on epoxy and other coated reinforcement.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eNotable Updates and Revisions:\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003eBar marking coverage was updated.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eTypical reinforcing bar bend shapes greatly expanded.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eUpdates made to standard and stirrup\/tie hooks data.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eReinforcing bar fabrication tolerances updated.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eHoisting equipment and hand signal illustrations updated.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eExpanded coverage on placing drawings and bar lists.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eCoverage of bar supports updated.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eExpanded field placing tolerances with addition of vertical bar placement.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eGreatly expanded coverage of recommended first\/last bar placement.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eTo emphasize the importance of field safety, the safety chapter was moved to Chapter 1.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eNew bar size #20 added.\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003cspan\u003e\u003cstrong\u003eTable of Contents:\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan\u003eSafety Precautions\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eIntroduction\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eConcrete and Reinforced Concrete – Definitions\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eReinforced Concrete Building Construction\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eBridge Construction\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eReinforcing Steel – Purpose and Location in Concrete\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFabricated Reinforcing Bars\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eUnloading, Storing and Handling Reinforcing Bars at the Jobsite\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePlacing Drawings and Bar Lists\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eBar Supports\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eGeneral Principles for Placing, Splicing and Tying Reinforcing Bars\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePlacing Reinforcing Bars in Footings, Walls and Columns\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePlacing Reinforcing Bars in Floors and Roofs\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePlacing Reinforcing Bars in Post-Tensioned Floor Systems\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eTransportation Structures\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eHighway and Airport Pavements\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eInspection of Reinforcing Steel\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eCoated Reinforcing Steel\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eAppendix A: Metric Reinforcing Bars\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eGlossary\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eIndex\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cspan\u003eISBN: 9781943961474\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv id=\"productDescription\" class=\"a-section a-spacing-small prodDescWidth\"\u003e\n\u003cdiv aria-live=\"polite\" data-a-expander-collapsed-height=\"300\" class=\"a-expander-collapsed-height a-row a-expander-container a-expander-partial-collapse-container\"\u003e\n\u003cdiv aria-expanded=\"false\" class=\"a-expander-content a-expander-partial-collapse-content\"\u003e\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cscript src=\"https:\/\/cdn.inspectlet.com\/inspectifr\/1199436174.js\" type=\"text\/javascript\"\u003e\u003c\/script\u003e","brand":"Concrete Reinforcing Steel Institute (CRSI)","offers":[{"title":"Default Title","offer_id":32232535053,"sku":"9781943961474","price":84.94,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/Placing_Reinforcing_Bars.png?v=1569615656"},{"product_id":"complete-book-set-for-florida-state-residential-contractor-exam-valid","title":"Florida Residential Contractor Exam Complete Book Set","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida Residential Contractor Exam Complete Book Set\u003c\/h1\u003e\n\u003cp\u003ePrepare for the Florida Residential Contractor examination with a complete collection of reference books selected for residential contractor exam study and professional construction reference. The Florida Residential Contractor Exam Complete Book Set brings together the contract documents, Florida building codes, construction manuals, safety regulations, estimating resources, and technical publications used to develop knowledge across the major areas of residential contracting.\u003c\/p\u003e\n\u003cp\u003eThis comprehensive set is designed for candidates working toward Florida residential contractor certification and for construction professionals who want an organized technical library for day-to-day reference. The collection covers contract administration, project management, business and finance, building codes, accessibility, energy conservation, workplace safety, estimating, accounting, concrete, reinforcing steel, gypsum installation, truss handling, and general construction practices.\u003c\/p\u003e\n\u003cp\u003eFlorida contractor exam preparation requires more than memorizing isolated facts. Candidates must learn how to locate information efficiently, understand the purpose of each publication, recognize the types of questions associated with different references, and apply construction principles to practical situations. Working with the actual books helps build the reference-navigation skills needed for an open-book examination.\u003c\/p\u003e\n\u003cp\u003eThe included Florida Building Code volumes support study of residential construction requirements, existing structures, accessibility provisions, energy-efficiency standards, and broader building regulations. Industry manuals add detailed guidance on concrete, reinforcement, gypsum products, truss safety, estimating, accounting, and commercial construction practices that may also apply to residential project administration and field operations.\u003c\/p\u003e\n\u003cp\u003eContract documents and bidding references help candidates study agreements, responsibilities, project communication, contractor-subcontractor relationships, and bidding procedures. The OSHA construction regulations provide an essential source for reviewing federal workplace safety requirements that affect construction sites. Together, these resources create a well-rounded library for exam preparation and continued professional use.\u003c\/p\u003e\n\u003cp\u003eThis product is a book set. Exam-preparation courses, application services, tutoring, and guaranteed examination results are not included unless they are identified separately on the order page.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor Exam Complete Book Set includes the following publications:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eGeneral Conditions of the Contract for Construction, 2017\u003c\/li\u003e\n\u003cli\u003eStandard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/li\u003e\n\u003cli\u003eInstructions to Bidders, 2018\u003c\/li\u003e\n\u003cli\u003eCode of Federal Regulations, 29 CFR Part 1926\u003c\/li\u003e\n\u003cli\u003eContractors Manual, 2021\u003c\/li\u003e\n\u003cli\u003ePrinciples and Practices of Commercial Construction, 11th Edition\u003c\/li\u003e\n\u003cli\u003eEnergy Efficient Building Construction in Florida, 2024\u003c\/li\u003e\n\u003cli\u003eBuilding Component Safety Information: BCSI-ED2-D, 2020\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Accessibility, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Residential, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Existing Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/li\u003e\n\u003cli\u003eBuilder’s Guide to Accounting – Revised Edition\u003c\/li\u003e\n\u003cli\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition, 2024\u003c\/li\u003e\n\u003cli\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/li\u003e\n\u003cli\u003ePlacing Reinforcing Bars\u003c\/li\u003e\n\u003cli\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor certification examination is associated with the Florida Department of Business and Professional Regulation and the Construction Industry Licensing Board. Residential contracting is a Division I category.\u003c\/p\u003e\n\u003cp\u003eThe Division I examination structure includes Business and Finance, Contract Administration, and Project Management. These examination areas evaluate different parts of contractor knowledge. Business and Finance addresses the financial, administrative, and business responsibilities involved in operating a contracting business. Contract Administration focuses on agreements, bidding, project documentation, responsibilities, and contractual relationships. Project Management addresses construction methods, planning, code application, safety, estimating, materials, and the coordination of construction work.\u003c\/p\u003e\n\u003cp\u003eFlorida construction examinations in this category are administered in a computer-based format. Candidates register through the state’s contracted examination registration organization and schedule an approved examination appointment with the designated computer-based testing vendor.\u003c\/p\u003e\n\u003cp\u003ePassing the required examination is an important part of the certification process, but an examination score by itself does not create a contractor license. Applicants must also complete the applicable licensure process and satisfy the requirements established for the certified residential contractor category.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe Florida contractor examinations are open book. Candidates may use approved references in accordance with the current examination rules and reference list. Open-book testing still requires substantial preparation because candidates must identify the correct publication, locate the relevant section, interpret the information, and select an answer within the examination period.\u003c\/p\u003e\n\u003cp\u003eA productive study plan should include repeated practice with the physical references. Learn the arrangement of each book, including its table of contents, index, chapters, code sections, appendices, definitions, and major subject divisions. Become familiar with which book is most likely to address contracts, safety, accounting, estimating, energy requirements, residential code provisions, accessibility, concrete, reinforcement, gypsum, and truss installation.\u003c\/p\u003e\n\u003cp\u003eBooks taken into the testing room must comply with the examination administrator’s current rules. Candidates should review the official candidate information and reference instructions before their appointment because rules concerning permitted references, binding, tabs, notes, attachments, and book condition may change.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eThe general path toward Florida certified residential contractor licensure begins with reviewing the state’s current eligibility and experience requirements. Candidates should evaluate those requirements before registering for the examination so they understand the complete licensing process.\u003c\/p\u003e\n\u003cp\u003eApplicants seeking certification normally complete the state examination registration process, obtain approval to test, schedule the required examination parts, and prepare using the applicable references. After completing the required examinations, the applicant submits the appropriate initial licensure application and supporting documentation to the Florida Department of Business and Professional Regulation.\u003c\/p\u003e\n\u003cp\u003eThe licensing review may include examination records, experience or education documentation, financial responsibility information, background-related documentation, and other items required by the applicable application. Candidates seeking to qualify a business entity may need to use a different application path from candidates applying only as individuals.\u003c\/p\u003e\n\u003cp\u003eBecause passing the examination does not automatically issue a license, applicants should carefully follow the application instructions for their intended status. The correct process may differ depending on whether the person is applying as an individual, qualifying a business, qualifying an additional business, or pursuing another available licensing pathway.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe Florida Construction Industry Licensing Board regulates construction contractors and contractor businesses within its authority. A certified contractor holds a state-issued certificate of competency and may operate within the permitted scope of the license throughout Florida without having to demonstrate competency separately in each local jurisdiction.\u003c\/p\u003e\n\u003cp\u003eApplicants for certified residential contractor licensure must satisfy the examination and application requirements established for the category. Florida generally requires four years of qualifying experience or an accepted combination of college education and experience. The complete experience rules, documentation standards, and available substitutions are determined by the current application and board requirements.\u003c\/p\u003e\n\u003cp\u003eFlorida also provides a trade-knowledge examination exemption for certain candidates who have earned a qualifying bachelor’s degree in building construction from an accredited four-year college with the required grade-point average. Candidates using an exemption must still follow the state’s application and documentation procedures, and the exemption does not remove other licensing requirements.\u003c\/p\u003e\n\u003cp\u003eThe residential contractor license has a defined legal scope. Candidates should understand the work authorized by the credential and avoid assuming that passing a residential examination grants authority to perform work reserved for another contractor category or regulated trade.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eGeneral Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA widely used contract document addressing the rights, responsibilities, and relationships of the owner, contractor, and architect during a construction project.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract reference covering the working relationship between a contractor and subcontractor, including performance responsibilities, payment, coordination, and project obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInstructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA bidding reference that addresses procedures, bidder responsibilities, submission requirements, and the administration of the construction bidding process.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations – 29 CFR Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe federal OSHA construction safety regulations covering workplace hazards, employee protection, jobsite practices, equipment, fall protection, excavations, scaffolding, and other construction-safety subjects.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractors Manual, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor business and administration reference used to study subjects connected with financial management, contracts, employment responsibilities, insurance, taxation, business operations, and regulatory compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA broad construction reference addressing materials, methods, building systems, project practices, structural components, and construction-management concepts.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEnergy Efficient Building Construction in Florida, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida-focused resource covering energy-conscious construction practices, building-envelope considerations, efficient systems, and methods for improving building energy performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilding Component Safety Information: BCSI-ED2-D “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses,” 2020\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA specialized safety guide for the handling, installation, restraint, and bracing of metal-plate-connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA core Florida code volume addressing building construction, occupancy, structural provisions, fire and life safety, materials, means of egress, and other regulated building requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe Florida code resource for accessibility requirements affecting building elements, accessible routes, entrances, spaces, fixtures, and facilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe principal Florida code reference for regulated one- and two-family dwellings and townhouses within the code’s scope, including structural, life-safety, energy-related, and building-system provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA code reference covering repairs, alterations, additions, changes of occupancy, and other work involving existing buildings.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe Florida code volume addressing energy-efficiency requirements for building envelopes, mechanical systems, lighting, service water heating, and related construction components.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilder’s Guide to Accounting – Revised Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-accounting resource covering financial records, job costs, statements, payroll, overhead, cash flow, and accounting practices relevant to contractors.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn estimating reference containing construction cost information, labor and material data, calculation guidance, and practical information for developing project estimates.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical concrete reference covering ingredients, proportioning, mixing, placement, curing, testing, durability, and performance considerations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn industry reference covering reinforcing-bar placement, supports, splices, clearances, detailing, handling, and field practices for reinforced concrete construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical standard addressing the application, attachment, joint treatment, and finishing of gypsum panel products in building construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eA complete reference set gives candidates the resources needed to build a structured exam-preparation routine. Begin by separating the books according to the three primary examination areas: Business and Finance, Contract Administration, and Project Management. Some books may support more than one area, so develop a personal reference map showing the strongest subject coverage of each publication.\u003c\/p\u003e\n\u003cp\u003eFor Business and Finance preparation, concentrate on accounting, estimating, contracts, business administration, job costing, financial records, and contractor responsibilities. Practice identifying which formulas, tables, definitions, or procedures apply to common construction-business scenarios.\u003c\/p\u003e\n\u003cp\u003eFor Contract Administration, study the relationships among owners, contractors, subcontractors, architects, and bidders. Review contract formation, bidding procedures, project documentation, changes, payment responsibilities, claims, and the allocation of duties among project participants.\u003c\/p\u003e\n\u003cp\u003eFor Project Management, devote time to the Florida code books, OSHA regulations, construction methods, energy efficiency, concrete, reinforcing steel, gypsum products, truss safety, materials, and estimating. Practice moving between code provisions and technical manuals so that selecting the appropriate reference becomes automatic.\u003c\/p\u003e\n\u003cp\u003eUse timed practice sessions to strengthen speed and accuracy. Rather than reading every publication from beginning to end, combine subject review with lookup exercises. Search for a topic, locate the governing provision, read the surrounding language, and explain why the information answers the question. This method develops familiarity with both the content and the organization of the books.\u003c\/p\u003e\n\u003cp\u003eReview the condition and edition of every publication before the examination. Match your books to the current official reference requirements and follow all testing-center rules for permitted materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep supports contractor candidates with organized study guidance built around the subjects encountered in licensing examinations. A structured approach helps reduce the confusion that can come from working with multiple code books, contract documents, technical manuals, and business references.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps candidates connect exam topics with real construction responsibilities. Practice-oriented preparation reinforces the ability to recognize question types, select the appropriate reference, interpret technical language, and work through realistic contractor scenarios.\u003c\/p\u003e\n\u003cp\u003eReference-navigation practice is especially important for an open-book exam. Learning where information is located can save valuable time and help candidates approach the test with a more consistent method. Organized study schedules, repeated lookup exercises, and focused review sessions can build confidence without relying on unrealistic promises or shortcuts.\u003c\/p\u003e\n\u003cp\u003eThe goal is to help each student develop stronger knowledge, better reference skills, and a practical preparation routine for the Florida Residential Contractor examination and the professional responsibilities that follow licensure.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Florida Residential Contractor examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Florida contractor examinations are open book, subject to the current rules governing approved references and permitted materials. Candidates should review the official examination instructions before testing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich examination parts apply to a Florida Residential Contractor?\u003c\/h2\u003e\n\u003cp\u003eResidential contracting is a Division I category. The examination structure includes Business and Finance, Contract Administration, and Project Management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this set include Florida Building Code books?\u003c\/h2\u003e\n\u003cp\u003eYes. The set includes the 2023 Florida Building Code volumes for Building, Accessibility, Residential, Existing Building, and Energy Conservation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the book set include business and estimating references?\u003c\/h2\u003e\n\u003cp\u003eYes. The collection includes the Contractors Manual, Builder’s Guide to Accounting, and Walker’s Building Estimator’s Reference Book, along with contract and bidding publications.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I become licensed by passing the examination alone?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the required examination is only one part of the Florida certification process. Applicants must also submit the appropriate licensure application and satisfy the applicable experience, financial, documentation, and regulatory requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eShould I study with the physical books before the exam?\u003c\/h2\u003e\n\u003cp\u003eYes. Regular practice with the books helps candidates learn each publication’s organization and improve the speed of locating information during an open-book examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre courses or application services included with this book set?\u003c\/h2\u003e\n\u003cp\u003eThis product is the Florida Residential Contractor Exam Complete Book Set. Courses, tutoring, and application services are not included unless they are expressly listed as part of the product offer.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan the books be useful after the examination?\u003c\/h2\u003e\n\u003cp\u003eYes. Many of the included publications provide practical reference information for contracts, construction methods, safety, codes, estimating, accounting, concrete work, reinforcement, gypsum installation, energy efficiency, and project administration.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Florida Residential Contractor Book Set","offer_id":45922661695545,"sku":"1EXAM-SETFLIRC-1","price":1695.0,"currency_code":"USD","in_stock":true},{"title":"Florida Residential Highlighted \u0026 Tabbed Book Set [+$800]","offer_id":45922661728313,"sku":"1EXAM-SETFLIRC-2","price":2495.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/FLORIDA_RESIDENTIAL-CONTRACTOR_BOOK.png?v=1622672523"},{"product_id":"design-and-control-of-concrete-mixtures-17th-edition","title":"Design and Control of Concrete Mixtures, 17th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThis reference manual, published by the Portland Cement Association and now in its 17th edition, provides comprehensive engineering-level coverage of concrete technology—including material selection (cement, aggregates, admixtures), mix design, batching, mixing, placing, finishing, curing, and performance issues such as durability, volume changes, and sustainability. It incorporates the latest standards and test methods from ASTM International, American Association of State Highway and Transportation Officials (AASHTO), and American Concrete Institute (ACI), and includes expanded content on innovations in concrete and common imperfections in concrete construction. It is especially useful for construction professionals, materials engineers, and certification candidates who require an up-to-date technical resource on concrete mixture design and application.\u003c\/p\u003e\u003cbr\u003e\n","brand":"Portland Cement Association","offers":[{"title":"Default Title","offer_id":14416979230777,"sku":"978-0-89312-280-5","price":149.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/dc171.png?v=1623096309"},{"product_id":"pre-printed-tabs-and-highlights-for-florida-state-residential-contract","title":"Florida Residential Contractor Exam; Pre-Printed Tabs and Highlights","description":"\u003ch1 style=\"text-align: center; color: #000;\"\u003eFlorida Residential Contractor Exam – Pre-Printed Tabs and Highlights\u003c\/h1\u003e\n\u003cp style=\"text-align: center;\"\u003eThe Florida Residential Contractor Exam pre-printed tabs and highlights set provides organized navigation aids for the trade and code books required during the state’s residential contractor licensing examination. The set includes pre-applied index tabs and highlighted key passages covering structural components, concrete and masonry standards, carpentry and framing, roofing requirements, energy and mechanical provisions, sitework, safety rules, and project-management topics. Aligned with One Exam Prep’s exam-readiness format, these tools help candidates quickly locate essential sections during open-book testing and reinforce mastery of Florida’s residential-construction standards.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eWith this purchase you will receive: \u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003e1.\u003c\/strong\u003e A complete set of pre-printed tabs (sent to you in the mail) for all of the books required for the Florida State Certified Residential Contractor Exam. These permanent, quick reference tabs will help you navigate quickly and easily through the books during your exam. \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eOnline access for one (1) year to:\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cdiv\u003e\u003cspan\u003e\u003cstrong\u003e2.\u003c\/strong\u003e Printable pdf's that will indicate key areas to highlight in the books and where to place your pre-printed tabs. \u003c\/span\u003e\u003c\/div\u003e\n\u003cdiv\u003e\u003cspan\u003e\u003cstrong\u003e3\u003c\/strong\u003e. Instructional video on how to tab and highlight your book\u003c\/span\u003e\u003c\/div\u003e\n\u003cdiv\u003e\n\u003cspan\u003e\u003c\/span\u003e\u003cbr\u003e\n\u003c\/div\u003e\n\u003cdiv\u003e\u003cspan\u003e \u003c\/span\u003e\u003c\/div\u003e\n\u003cp\u003e\u003cspan\u003eThe pre-printed tabs and highlighting locations are for the following Florida Residential Contractor's Exam books:  \u003c\/span\u003e\u003c\/p\u003e\n\u003col\u003e\n\u003cli\u003e\u003cspan\u003eA201 General Conditions of the Contract for Construction, 2017 \u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eA401 Standard Form of Agreement between Contractor-Subcontractor, 2017 \u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eA701 Instructions to Bidders, 2018 \u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eBuilder's Guide to Accounting, Michael C. Thomsett, Copyright 2001 \u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFlorida Statues Chapter 455\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eWalker's Building Estimator’s Reference Book, Walker’s, 33rd Edition\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eCode of Federal Regulations, (OSHA) 29 Part 1926, (OSHA1926)\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eContractors Manual, 2025\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eDesign and Control of Concrete Mixtures, Steven H. Kosmatka, Beatrix Kerkhoff and William C. Panarese, 17th Ed. \u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePlacing Reinforcing Bars, 10th ed\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003ePrinciples and Practices of Commercial Construction, 11th ed\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition. \u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eEnergy Efficient Building Construction in Florida, 11th Ed., 2024\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eBuilding Component Safety Information: BCSI “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses”, 2025\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFlorida Building Code - Building, 2023\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFlorida Building Code - Accessibility, 2023\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFlorida Building Code - Residential, 2023\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFlorida Building Code – Existing Building, 2023\u003cbr\u003e\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ol\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":32607297485,"sku":"32607297485","price":175.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/2017_Contractors_Manual_Tabs_for_electrical_contractors_large_f3d566bb-0022-4358-88c7-b892aa8ed811.jpg?v=1583514908"},{"product_id":"blank-redi-tabs-375-per-pack","title":"Blank Redi Tabs 375 per pack","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eBlank Redi Tabs – 375 per Pack\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eBlank Redi Tabs, supplied in packs of 375, provide customizable indexing tabs used for organizing contractor trade books, code references, and exam materials. These unlabeled tabs allow candidates to create their own section markers for topics such as building codes, mechanical systems, plumbing standards, electrical requirements, estimating, safety regulations, and business-and-law content. Used alongside One Exam Prep study resources, Blank Redi Tabs support efficient navigation during open-book contractor licensing exams by enabling precise, user-defined organization of reference materials.\u003c\/p\u003e\u003cbr\u003e\nUse these blank tabs for your contractor books.","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":32607320589,"sku":"BLANK-TABS","price":44.95,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/redi-tabs_256e9b4b-a51d-4ecd-962c-d14617f003b3.jpg?v=1529959485"},{"product_id":"builders-guide-to-accounting-revised-10th-printing-book","title":"Builder's Guide to Accounting Revised - 10th Printing Book","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eBuilder’s Guide to Accounting Revised – 10th Printing\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe \u003ci\u003eBuilder’s Guide to Accounting Revised – 10th Printing\u003c\/i\u003e presents the core financial-management practices required for contractor business operations, including job-cost accounting, payroll, overhead allocation, financial statements, budgeting, taxation, and audit preparation. Structured for construction-industry use, it explains accounting methods tied to project scheduling, contract administration, and cost-control systems. Referenced within One Exam Prep study materials, this guide supports contractor-licensing exam candidates by outlining standardized bookkeeping and financial-tracking procedures essential for compliant construction-business management.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eBuilder's Guide to Accounting, Revised Edition\u003c\/strong\u003e\u003cspan\u003e is a step-by-step, easy-to-follow guideline for setting up and maintaining records for a building or construction business. This practical guide to all accounting methods shows how to meet state and federal accounting requirements, explains the new depreciation rules and describes how the Tax Reform Act can affect the way you keep records. Full of charts, diagrams, simple directions and examples to help you keep track of where your money is going. Recommended reading for many state contractor's exams. Includes a CD-ROM that contains answers to all end-of-chapter questions in the book\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eStep-by-step, easy-to-follow guidelines for setting up and maintaining records for your building business. This practical guide to all accounting methods shows how to meet state and federal accounting requirements, explains the new depreciation rules, and describes how the Tax Reform Act can affect the way you keep records. Full of charts, diagrams, simple directions and examples, to help you keep track of where your money is going.\u003cbr\u003e\u003cbr\u003eWeight 1.8600\u003cbr\u003eISBN 1572181052\u003cbr\u003ePage Count 360\u003cbr\u003eAuthor Michael C. Thomsett\u003cbr\u003ePublisher Craftsman Book Company\u003cbr\u003eDimensions 8-1\/2 x 11\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e9781572181052\u003c\/span\u003e\u003c\/p\u003e","brand":"Craftsman Book Co","offers":[{"title":"Default Title","offer_id":3105718894618,"sku":"9781572181053","price":69.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/builders_guide_to_accounting.jpg?v=1680390127"},{"product_id":"application-fee-division-one","title":"Florida State Contractor License Application Service - Division One","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida State Contractor License Application Service - Division One\u003c\/h1\u003e\n\u003cp\u003eThe \u003cstrong\u003eFlorida State Contractor License Application Service - Division One\u003c\/strong\u003e is designed for contractors who want organized support preparing a Florida Division I contractor license application through the Florida Department of Business and Professional Regulation and the Construction Industry Licensing Board. Division I licensing is the Florida state contractor license path used for major building categories such as certified general contractor, certified building contractor, and certified residential contractor. These licenses are issued and regulated through Florida’s construction licensing structure and are used by applicants seeking state-level construction credentials.\u003c\/p\u003e\n\u003cp\u003eFlorida contractor licensing can be detailed, document-heavy, and easy to mismanage without a clear application plan. Applicants may need to organize experience records, exam history, business entity information, qualifying agent details, financial responsibility documents, credit information, fingerprints, insurance planning, workers’ compensation information, and the correct DBPR application form. For contractors who are also trying to run projects, manage crews, estimate work, schedule inspections, or prepare for exams, the application side can become confusing quickly.\u003c\/p\u003e\n\u003cp\u003eThis service helps customers approach the Florida Division I contractor license application with a more organized workflow. It is built for applicants who want help understanding which application path applies, what information needs to be gathered, and how the license application should be prepared before submission. 1 Exam Prep supports the preparation process by helping customers organize the application package, review document categories, identify common missing items, and prepare a cleaner licensing file for the appropriate Florida licensing process.\u003c\/p\u003e\n\u003cp\u003eFlorida Division I contractor license categories are separate from Division II specialty contractor categories. Division I generally includes the major building categories of general, building, and residential contracting. A certified license is a statewide Florida license, while a registered license is connected to a local jurisdiction. The correct license type depends on the applicant’s work scope, experience, exam path, business structure, and whether the applicant is seeking state certification or local registration. Selecting the correct path matters because the application form, documentation, and license result may be different.\u003c\/p\u003e\n\u003cp\u003eThe Florida Construction Industry Licensing Board reviews contractor licensing matters under the Department of Business and Professional Regulation. Florida’s licensing process includes both exam and application components. Division I applicants commonly deal with the Business and Finance exam, Contract Administration exam, and Project Management exam as part of the certification process. The Department’s construction examination process uses Professional Testing, Inc. for examination registration and development, and approved candidates schedule exams through the Department’s examination vendor. The application process and examination process are connected, but they are not the same thing.\u003c\/p\u003e\n\u003cp\u003eThis product is for application service support. It does not replace exam preparation, does not include exam registration unless a separate service states otherwise, does not include state fees, does not include fingerprinting fees, does not include credit report fees, does not include insurance, does not include bonds, does not include workers’ compensation coverage, does not include business formation, and does not guarantee approval by DBPR, the Construction Industry Licensing Board, or any Florida agency. It helps customers organize and prepare the application materials needed for the selected Florida Division I license path.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Division I Application Support:\u003c\/strong\u003e Guidance preparing the application package for a Florida Division I contractor license category.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLicense Category Review:\u003c\/strong\u003e Help organizing whether the customer is pursuing a Division I path such as general, building, or residential contractor licensing.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication Path Guidance:\u003c\/strong\u003e Support identifying whether the applicant is applying as an individual, qualifying a business, changing status, qualifying an additional business, or using another applicable DBPR application path.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDBPR Form Organization:\u003c\/strong\u003e Help reviewing the correct application form category and organizing the information needed before submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExperience Documentation Review:\u003c\/strong\u003e Support organizing work history, supervisory experience, project records, employer information, and supporting documents used in the application package.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Entity Review:\u003c\/strong\u003e Guidance organizing business entity names, Florida Division of Corporations records, ownership information, qualifying agent details, and consistency across licensing documents.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFinancial Responsibility Planning:\u003c\/strong\u003e Help identifying the financial responsibility documents, credit information, and supporting items that may be needed for the application.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFingerprinting and Background Step Guidance:\u003c\/strong\u003e Direction on organizing required background-related steps and keeping proof of completion with the application file.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInsurance and Workers’ Compensation Document Review:\u003c\/strong\u003e Guidance organizing insurance certificates, workers’ compensation information, exemption records when applicable, and related compliance documents.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExam Status Organization:\u003c\/strong\u003e Support organizing passed exam records or planning the application workflow around the required Division I examination process.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSubmission Readiness Review:\u003c\/strong\u003e Help reviewing the application package for missing items, mismatched names, incomplete fields, or document gaps before submission.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePractical Licensing Guidance:\u003c\/strong\u003e Support understanding the order of steps involved in moving from exam preparation and documentation gathering toward a complete Florida contractor license application.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eFlorida Division I contractor licensing generally applies to the major building contractor categories, including certified general contractor, certified building contractor, and certified residential contractor. These license categories are regulated through the Florida Department of Business and Professional Regulation and the Construction Industry Licensing Board.\u003c\/p\u003e\n\u003cp\u003eFlorida’s certified construction examination process is separate from the license application review process, but both are part of the overall licensing journey. Division I applicants commonly deal with three examination areas: Business and Finance, Contract Administration, and Project Management. These exam parts are connected to the Florida construction licensing process for Division I categories.\u003c\/p\u003e\n\u003cp\u003eThe Department of Business and Professional Regulation works with Professional Testing, Inc. for construction examination registration, development, and scoring. After approval through the examination process, candidates schedule approved examinations through the Department’s examination vendor. Applicants should follow the current DBPR and testing-vendor instructions for registration deadlines, scheduling, identification requirements, exam authorization, and score reporting.\u003c\/p\u003e\n\u003cp\u003eThis application service is not an exam-prep course and does not replace study materials, reference books, tabbing, highlighting, practice questions, or trade review. However, application organization and exam organization are closely related. Applicants should keep exam approvals, score reports, candidate information, and licensing documents in a consistent file so the license application can be prepared more efficiently after the required exam steps are completed.\u003c\/p\u003e\n\u003cp\u003eFlorida contractor licensing also includes experience and financial responsibility review. Passing an exam alone does not automatically issue a license. Applicants must still satisfy the applicable application requirements, submit the correct form, provide required documentation, complete required background and fingerprinting steps, address financial responsibility items, and meet DBPR and Construction Industry Licensing Board requirements for the license category requested.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eFlorida Division I contractor examinations are commonly prepared for as open-book construction exams using approved reference materials. Open-book does not mean easy. These exams require applicants to know how to navigate code books, statutes, administrative rules, estimating references, contract documents, project management materials, safety information, lien law resources, and business references under timed conditions.\u003c\/p\u003e\n\u003cp\u003eFor Division I applicants, open-book preparation usually focuses on speed, accuracy, reference navigation, and recognizing where information is located. A candidate may understand construction work in the field but still struggle on the exam if the books are not organized, tabbed, highlighted, and practiced with before test day. Application service support does not include exam-room book preparation unless a separate product includes that service.\u003c\/p\u003e\n\u003cp\u003eApplicants should always follow the current testing-vendor and DBPR instructions for permitted references, book editions, permanent tabs, highlighting, handwritten notes, calculator rules, identification requirements, scheduling procedures, and testing-day requirements. Approved references can change, and candidates are responsible for using the materials allowed for the exam they are taking.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eThe first step is identifying the correct Florida Division I license category. The applicant should determine whether the work scope fits certified general contractor, certified building contractor, certified residential contractor, or another Florida construction category. Division I categories are not interchangeable. The selected license should match the type of work the applicant intends to perform and the experience the applicant can document.\u003c\/p\u003e\n\u003cp\u003eThe next step is reviewing whether the applicant is pursuing a certified license or a registered license. A certified contractor license is a statewide Florida license. A registered contractor license is connected to a local jurisdiction. The correct route depends on the applicant’s goals, work location, local credential status, and DBPR application path.\u003c\/p\u003e\n\u003cp\u003eAfter the license type is identified, the applicant should organize experience documentation. Florida contractor licensing requires the applicant to show qualifying construction experience for the selected category. Experience documents should be clear, consistent, and tied to the license scope being requested. Work history, employer information, supervisory roles, project types, dates, and supporting records should be organized before the application is submitted.\u003c\/p\u003e\n\u003cp\u003eThe applicant should then organize the exam process. Division I applicants commonly need Business and Finance, Contract Administration, and Project Management exam components. Exam registration, approval, scheduling, study preparation, and score tracking should be handled carefully. Passing exam results should be kept with the licensing file.\u003c\/p\u003e\n\u003cp\u003eBusiness structure should be reviewed early. Many applicants intend to qualify a business entity rather than operate only as an individual. The business name used on the application should match the entity record, insurance documents, tax records, and any qualifying-agent paperwork. If the applicant is qualifying a Florida LLC or corporation, the entity record should be active and consistent with the license application.\u003c\/p\u003e\n\u003cp\u003eFinancial responsibility documents must also be addressed. Florida contractor licensing includes financial responsibility review, which may involve credit reporting, financial information, bonds, or related documents depending on the applicant’s situation and the specific application path. Applicants should organize these items before submission so the application package does not stall due to missing financial documentation.\u003c\/p\u003e\n\u003cp\u003eFingerprinting and background-related requirements should be completed according to DBPR instructions. Applicants should keep confirmation records and ensure that personal information is entered consistently across fingerprinting, exam, and licensing documents.\u003c\/p\u003e\n\u003cp\u003eInsurance and workers’ compensation information should be organized before licensure. Contractors may need general liability insurance and workers’ compensation coverage or exemption documentation depending on the business structure and circumstances. Insurance names, business names, and license names should match the application record as closely as possible.\u003c\/p\u003e\n\u003cp\u003eOnce the major documents are organized, the license application is prepared and reviewed. A strong application package should use the correct form, consistent names, complete personal and business information, required signatures, required supporting documents, and correct fee handling. Missing signatures, inconsistent business names, incomplete experience records, or missing supporting documents can delay review.\u003c\/p\u003e\n\u003cp\u003eAfter submission, DBPR and the Construction Industry Licensing Board control the review process. The board or department may request additional documents, clarification, corrections, or updated information. Applicants should respond promptly and keep copies of all submitted materials, notices, approvals, and follow-up correspondence.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eFlorida contractor licensing is regulated by the Department of Business and Professional Regulation through the Construction Industry Licensing Board. Division I contractor licensing includes the major building categories, such as general, building, and residential contractor licensing. Applicants must use the application path that matches the license type and business relationship requested.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eLicense Category Selection\u003c\/strong\u003e is required because Florida contractor categories have different scopes. A general contractor, building contractor, and residential contractor are not the same credential. The applicant should pursue the category that matches documented experience and intended work.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eCertified or Registered Status\u003c\/strong\u003e must be considered. Certified contractors are licensed for statewide practice within the license scope. Registered contractors are tied to a local jurisdiction. The application path differs depending on whether the applicant is seeking certification, registration, endorsement, reciprocity, qualification of a business, or a change of status.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eExamination Requirements\u003c\/strong\u003e apply to many Division I applicants. Division I applicants commonly deal with Business and Finance, Contract Administration, and Project Management examination parts. Exam registration and license application submission are separate steps, and applicants should follow current DBPR and testing-vendor instructions.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eExperience Requirements\u003c\/strong\u003e apply to contractor licensing. Applicants must organize work history and supporting documentation that show qualifying experience for the requested license category. Experience should be complete, truthful, and consistent with the application.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFinancial Responsibility\u003c\/strong\u003e is part of the licensing review. Applicants may need credit reports, financial documents, bonds, or other supporting items depending on their situation. Financial responsibility requirements should be reviewed before submission.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFingerprinting and Background Steps\u003c\/strong\u003e may be required as part of the application process. Applicants should complete fingerprinting through the required process and keep related confirmation information with the application file.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBusiness Entity Information\u003c\/strong\u003e is important when the license will qualify a company. A qualifying agent should ensure the business entity record, ownership information, officer or manager information, insurance documents, and application details are consistent.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eInsurance and Workers’ Compensation\u003c\/strong\u003e information may be required before a license is issued or activated. Contractors should organize general liability insurance and workers’ compensation coverage or exemption documentation as applicable.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eApplication Fees and Third-Party Costs\u003c\/strong\u003e are separate from this service. DBPR fees, testing fees, fingerprinting fees, credit report fees, bond premiums, insurance premiums, workers’ compensation costs, local fees, business-entity fees, and other government or third-party costs are not included unless a product listing clearly states otherwise.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBoard Review and Final Approval\u003c\/strong\u003e are controlled by DBPR and the Construction Industry Licensing Board. 1 Exam Prep helps customers organize and prepare the application package, but the state makes all licensing decisions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eFlorida Division I applicants should treat the exam and application process as connected parts of the same licensing goal. The exam confirms knowledge, while the application demonstrates that the applicant meets licensing requirements. A candidate who passes the exam still needs a complete licensing application before the license can be issued. An applicant who organizes the application early can often move through the post-exam licensing process with fewer document problems.\u003c\/p\u003e\n\u003cp\u003eDivision I exam preparation often includes study around business and finance, project administration, contract administration, construction project management, Florida lien law concepts, safety, estimating, plan reading, permitting, code references, and jobsite supervision. The exact references and allowed materials depend on the current exam bulletin and testing instructions.\u003c\/p\u003e\n\u003cp\u003eBecause Florida Division I exams are open-book, reference navigation is a major part of preparation. Candidates should know how to locate information quickly, use permanent tabs when allowed, recognize key sections, and practice under timed conditions. A strong study plan should include both content review and book-navigation practice.\u003c\/p\u003e\n\u003cp\u003eApplicants should keep exam-related records in the same organized licensing file used for the application. This may include examination approvals, registration confirmations, scheduling confirmations, score reports, identification records, and correspondence from the testing provider or DBPR. Keeping these records together helps reduce confusion when the licensing application is prepared or updated.\u003c\/p\u003e\n\u003cp\u003eThis application service does not include study books, tabbing, highlighting, exam coaching, practice exams, or online course access unless those items are purchased separately. Customers preparing for the Florida Division I exam should use the correct current exam-prep materials for their license category and testing cycle.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep helps Florida Division I contractor applicants approach the license application process with structure and confidence. Contractor licensing is not just one form. It is a combination of exam planning, application preparation, experience documentation, business setup, financial responsibility review, fingerprinting, insurance planning, workers’ compensation organization, and follow-up communication. This service helps customers bring those pieces together in a more organized way.\u003c\/p\u003e\n\u003cp\u003eOur team helps applicants understand the application path, gather the right categories of documents, organize experience records, review business entity consistency, prepare the licensing file, and identify common issues before submission. For contractors who are qualifying a business, this support can be especially helpful because the license application must connect the qualifying individual, business entity, insurance documents, and state records correctly.\u003c\/p\u003e\n\u003cp\u003e1 Exam Prep also supports students through trade-focused review, organized study guidance, practice-oriented preparation, reference navigation when applicable, and confidence-building study structure through separate exam-preparation services. For application service customers, the goal is to help the applicant move from scattered paperwork to a cleaner, more complete application package.\u003c\/p\u003e\n\u003cp\u003eThis service is promotional but practical. It does not guarantee passing an exam, receiving a license, obtaining state approval, getting insurance, qualifying financially, or receiving any specific outcome. DBPR, the Construction Industry Licensing Board, testing vendors, insurers, credit reporting agencies, and other agencies control their own requirements and decisions. 1 Exam Prep’s role is to help customers prepare with better organization and a clearer licensing workflow.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the Florida State Contractor License Application Service - Division One?\u003c\/h2\u003e\n\u003cp\u003eThis service helps applicants prepare and organize a Florida Division I contractor license application package. It focuses on application path guidance, document organization, experience records, business entity consistency, financial responsibility planning, fingerprinting steps, insurance information, and submission readiness.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat contractor categories are considered Florida Division I?\u003c\/h2\u003e\n\u003cp\u003eFlorida Division I generally includes the major building contractor categories, such as general contractor, building contractor, and residential contractor. The correct category depends on the applicant’s work scope and qualifying experience.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho regulates Florida Division I contractor licensing?\u003c\/h2\u003e\n\u003cp\u003eFlorida contractor licensing is regulated by the Department of Business and Professional Regulation through the Construction Industry Licensing Board.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this service include the Florida contractor exam?\u003c\/h2\u003e\n\u003cp\u003eNo. This is an application service. Exam registration, exam fees, exam-prep courses, reference books, tabbing, highlighting, and study materials are separate unless a product listing specifically includes them.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDo Division I applicants need to pass exams?\u003c\/h2\u003e\n\u003cp\u003eMany Florida Division I applicants must complete the required examination process, which commonly includes Business and Finance, Contract Administration, and Project Management exam parts. Applicants should follow the current DBPR and testing-vendor instructions for their specific license path.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre Florida Division I contractor exams open book?\u003c\/h2\u003e\n\u003cp\u003eFlorida Division I contractor exams are commonly treated as open-book exams using approved references. Candidates must follow the current exam bulletin and testing instructions for the specific books, editions, tabs, notes, and materials allowed on test day.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically give me a Florida contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing required exams does not automatically issue the license. The applicant must also satisfy the license application requirements, submit the correct application, provide supporting documentation, complete required background steps, address financial responsibility, and receive approval from the proper Florida licensing authority.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan this service help if I am qualifying a business?\u003c\/h2\u003e\n\u003cp\u003eYes. This service can help organize the application package when the applicant is qualifying a business entity. Business name consistency, entity records, ownership information, qualifying agent details, insurance documents, and application information should be reviewed carefully.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this service include business formation?\u003c\/h2\u003e\n\u003cp\u003eNo. Florida LLC or corporation formation is separate unless a product listing specifically includes business formation. This application service focuses on the contractor license application process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this service include state fees or third-party costs?\u003c\/h2\u003e\n\u003cp\u003eNo. DBPR fees, exam fees, fingerprinting fees, credit report fees, insurance costs, bond costs, workers’ compensation costs, business filing fees, and other government or third-party charges are separate unless clearly stated in the product listing.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this service guarantee my Florida contractor license will be approved?\u003c\/h2\u003e\n\u003cp\u003eNo. DBPR and the Construction Industry Licensing Board control application review and approval. This service helps prepare and organize the application package, but it does not guarantee approval, processing time, exam results, financial qualification, or licensing outcome.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan this service help reduce application delays?\u003c\/h2\u003e\n\u003cp\u003eThis service can help reduce avoidable problems by organizing documents, reviewing common application categories, checking consistency, and helping customers prepare a more complete package. The state still controls review time, deficiency notices, and final decisions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this service useful for applicants who already passed the exam?\u003c\/h2\u003e\n\u003cp\u003eYes. Applicants who have already passed the required exam parts may still need help organizing the license application, financial responsibility documents, business information, fingerprints, insurance records, and supporting materials before submission.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this service useful for applicants who have not taken the exam yet?\u003c\/h2\u003e\n\u003cp\u003eYes. Applicants who are still preparing for exams can use this service to understand the application path and begin organizing the documents needed for licensure. Exam preparation and application preparation often work best when planned together.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy should I use 1 Exam Prep for application support?\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep works with contractor licensing customers and understands the importance of organized paperwork, consistent business records, exam planning, reference navigation, and clear application preparation. This service helps applicants approach the Florida Division I contractor license process with a more structured plan.\u003c\/p\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003cp\u003e\u003cem\u003e\u003cspan color=\"#000000\" face=\"arial, sans-serif\" style=\"font-family: arial, sans-serif;\"\u003e\u003ci\u003e*Our Application Assistance Fee does NOT include required \u003cspan style=\"color: #0b7dfc;\"\u003e\u003ca href=\"https:\/\/1examprep.com\/products\/personal-and-business-credit-reports\" style=\"color: #0b7dfc;\"\u003ecredit reports\u003c\/a\u003e\u003c\/span\u003e or the application processing fee required by the Department of Business and Professional Regulations (DBPR). Separate check(s) or money order(s) made payable to the DBPR will be required to submit your application(s).\u003c\/i\u003e\u003c\/span\u003e\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cem\u003e\u003cspan color=\"#000000\" face=\"arial, sans-serif\" style=\"font-family: arial, sans-serif;\"\u003e\u003ci\u003e**The Florida Department of Business and Professional Regulations (DBPR) requires any contractor who does not have final approval in business matters to appoint a Financially Responsible Officer (FRO). Should you require the designation of a FRO, a separate \u003cspan style=\"color: #0c7ffd;\"\u003e\u003ca href=\"https:\/\/1examprep.com\/collections\/applications\/products\/financially-responsible-officer-application\" style=\"color: #0c7ffd;\"\u003eFinancially Responsible Officer Application\u003c\/a\u003e\u003c\/span\u003e must be filed with the state.  \u003c\/i\u003e\u003c\/span\u003e\u003c\/em\u003e\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"General Contractor","offer_id":36974804959289,"sku":"1EXAM-APPFEE1","price":799.99,"currency_code":"USD","in_stock":true},{"title":"Building Contractor","offer_id":36974804992057,"sku":"1EXAM-APPFEE2","price":799.99,"currency_code":"USD","in_stock":true},{"title":"Residential Contractor","offer_id":36974805024825,"sku":"1EXAM-APPFEE3","price":799.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/1examprep-4-APPLICATION-FL-DIVISION1.png?v=1734440044"},{"product_id":"florida-contractors-manual-2025-edition","title":"Florida Contractors Manual 2025 Edition","description":"\u003ch1 style=\"text-align: center; color: #000;\"\u003eFlorida Contractors Manual 2025 Edition\u003c\/h1\u003e\n\u003cp style=\"text-align: center;\"\u003eThe Florida Contractors Manual 2025 Edition is the official reference manual approved by the Construction Industry Licensing Board of Florida for contractors taking the Business \u0026amp; Finance portion of the Florida licensure examination, covering state statutes, business management, financials, safety regulations, lien laws, and the Florida Building Code and related rules.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eAlone or as part of the \u003ca title=\"COMPLETE BOOK SET FOR FLORIDA STATE BUSINESS \u0026amp; FINANCE EXAM\" href=\"https:\/\/1examprep.com\/products\/complete-book-set-for-florida-state-business-finance-exam-valid-jan\" target=\"_blank\"\u003eComplete Florida Business and Finance Examination Prep Course Book Package\u003c\/a\u003e, the Florida Contractor’s Manual is a vital instrument in exam preparation for Florida general contractors.\u003c\/p\u003e\n\u003cp\u003eApproved by the Construction Industry Licensing Board for preparation for the Business and Finance Exam, this manual provides many of the answers you’ll need during the exam. The Florida Contractors Manual is often referred to as the Florida Contractor’s Reference Manual, because of its utility during and after your Business and Finance Exam.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eCovers many aspects of business operation in the construction industry\u003c\/li\u003e\n\u003cli\u003eCovers tax filing, insurance, daily accounts, and liens\u003c\/li\u003e\n\u003cli\u003eIncludes excerpts from Federal Codes, State Statutes, local ordinances, and related administrative rules\u003c\/li\u003e\n\u003cli\u003eAvailable alone or as part of the \u003ca title=\"COMPLETE BOOK SET FOR FLORIDA STATE BUSINESS \u0026amp; FINANCE EXAM\" href=\"https:\/\/1examprep.com\/products\/complete-book-set-for-florida-state-business-finance-exam-valid-jan\" target=\"_blank\"\u003ecomplete book set\u003c\/a\u003e\n\u003c\/li\u003e\n\u003cli\u003eAlso available in an \u003ca title=\"FLORIDA BUSINESS \u0026amp; FINANCE COMPUTER BASED EXAMINATION (CBT) - ONLINE EXAM PREP COURSE - PEARSON VUE\" href=\"https:\/\/1examprep.com\/products\/florida-business-finance-computer-based-examination-cbt-online-exam-prep-course-pearson-vue\" target=\"_blank\"\u003eonline course\u003c\/a\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cem\u003e*Effective for Florida Business and Finance Exam, February 1, 2026\u003c\/em\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"Associated Builders and Contractors (ABC)","offers":[{"title":"Default Title","offer_id":3106127609882,"sku":"9789781232015","price":199.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/2025FloridaContractorsManual.png?v=1768321759"},{"product_id":"walkers-building-estimators-reference-book-33rd-edition-2024","title":"Walker's Building Estimator's Reference Book, 33rd Edition, 2024","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition (2024)\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe 33rd Edition of Walker’s Building Estimator’s Reference Book (2024) by the Frank R. Walker Company is a comprehensive construction cost-estimation manual offering full-p inage 8½″×11″ format and 975 pages. Key updates in this edition include **fully updated wage-rates**, **expanded fundamentals of estimating**, and **QR-codes linking to supplemental information**.It is widely used for contractor licensing examinations (for example the Construction Industry Licensing Board in Florida) and professional estimating practice.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cem\u003eWalker’s Building Estimator’s Reference Book\u003c\/em\u003e is the single most important resource you can own. It gives you the tools you need to work up your own costs per job. With Walker’s, you get material quantities and labor productivity for your job based on your job conditions – that’s the kind of flexibility and reliability no computer program or unit price catalog can provide. For accurate building costs, turn to the source that construction professionals have relied on since 1915.\u003c\/p\u003e\n\u003cp\u003eThis edition is used for the following Florida Contractor's exams \u003cem\u003eeffective July 1, 2024\u003c\/em\u003e:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFlorida Commercial Pool Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida General Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Building Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Residential Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Gypsum Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Marine Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Residential Pool Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Specialty Structure Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Solar Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Underground Utility Contractor\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Frank R Walker Company","offers":[{"title":"Default Title","offer_id":2805159723034,"sku":"1110000001039","price":139.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/Walkers33rdedition.jpg?v=1718028270"},{"product_id":"energy-efficient-building-construction-in-florida","title":"Energy Efficient Building Construction in Florida, 11th Edition (2024)","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eEnergy Efficient Building Construction in Florida, 11th Edition (2024)\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe book \u003ci\u003eEnergy Efficient Building Construction in Florida, 11th Edition (2024)\u003c\/i\u003e from 1 Exam Prep is an official reference for DBPR and CILB contractor licensing exams emphasizing compliance with the Florida Building Code – Energy Conservation. Published by the University of Florida’s Program for Resource Efficient Communities, this edition details construction methods, HVAC system performance, insulation standards, solar heat gain coefficients, and air infiltration control specific to Florida’s climate zones. It is used in PSI-administered Building, Residential, and Air Conditioning Contractor exams to evaluate understanding of building envelope design, energy calculations, and sustainable construction practices required by Chapter 553, Florida Statutes. The text supports preparation for state contractor testing on energy efficiency, code updates, and performance verification in Florida structures.\u003c\/p\u003e\u003cbr\u003e","brand":"University of Florida","offers":[{"title":"Default Title","offer_id":3599165587482,"sku":"9780985248758","price":79.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/energy-efficient-11th-Ed-768x1024.webp?v=1713540474"},{"product_id":"florida-residential-contractor-contract-administration-project-management-online-course","title":"Florida Residential Contractor Contract Administration \u0026 Project Management - Online Exam Prep Course","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida Residential Contractor Contract Administration \u0026amp; Project Management - Online Exam Prep Course\u003c\/h1\u003e\n\u003cp\u003ePrepare for the Florida Residential Contractor Contract Administration and Project Management examinations with an online exam prep course designed around the official subject areas and reference materials used for Florida Division I contractor testing. This course provides an organized path through contracts, bidding, project documentation, construction methods, Florida building codes, workplace safety, estimating, energy conservation, concrete, reinforcing steel, gypsum products, and wood-truss installation.\u003c\/p\u003e\n\u003cp\u003eThe Florida Residential Contractor examination requires candidates to work with a large library of contracts, code books, construction manuals, safety regulations, estimating resources, and technical publications. Simply owning the references is not enough. Candidates must learn what each book covers, how its information is arranged, and which reference is most likely to contain the answer to a particular question.\u003c\/p\u003e\n\u003cp\u003eThis Florida Residential Contractor online exam prep course focuses on the Contract Administration and Project Management portions of the Division I examination. Lessons help candidates connect important examination subjects to the appropriate books while developing practical reference-navigation and test-taking skills. The course is structured to make a demanding study process more manageable and help students use their preparation time with greater purpose.\u003c\/p\u003e\n\u003cp\u003eContract Administration preparation addresses construction agreements, bidding procedures, contractor and subcontractor relationships, project responsibilities, documentation, payments, changes, claims, and other administrative issues that may arise during a construction project. Project Management preparation covers Florida building requirements, construction safety, estimating, materials, methods, energy efficiency, accessibility, concrete construction, reinforcement, gypsum installation, truss handling, and field coordination.\u003c\/p\u003e\n\u003cp\u003eRather than relying only on passive reading, students can use simulated practice questions to apply information, identify the correct reference, and practice locating supporting material. Book overviews explain how the references relate to the examination. Highlighting and tabbing instruction helps students organize their books, while test-taking techniques support a more disciplined approach to open-book testing.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eSimulated Practice Questions:\u003c\/strong\u003e Practice-oriented questions designed to reinforce important Contract Administration and Project Management concepts and build familiarity with reference-based problem solving.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Overviews:\u003c\/strong\u003e Guided introductions to the listed examination references, including the primary subjects covered by each publication and how the books support exam preparation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHow to Highlight and Tab Your Books:\u003c\/strong\u003e Instruction for organizing references with useful highlighting and tabs so important chapters, tables, definitions, and subject areas are easier to locate.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTest-Taking Techniques:\u003c\/strong\u003e Strategies for managing open-book questions, selecting the appropriate reference, locating information efficiently, eliminating weak answer choices, and pacing yourself during the examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContract Administration Review:\u003c\/strong\u003e Organized study guidance for contracts, bidding, project relationships, documentation, payment procedures, changes, and administrative responsibilities.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProject Management Review:\u003c\/strong\u003e Trade-focused preparation covering codes, safety, estimating, construction methods, materials, energy requirements, concrete, reinforcement, gypsum, trusses, and project coordination.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/div\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eFlorida Residential Contractor candidates are classified as Division I contractor candidates. Division I applicants must pass three examination parts: Business and Finance, Contract Administration, and Project Management. This online exam prep course focuses specifically on Contract Administration and Project Management. Business and Finance preparation is a separate area of study.\u003c\/p\u003e\n\u003cp\u003eThe Contract Administration examination measures knowledge related to the administrative and contractual responsibilities involved in construction projects. Candidates should be prepared to work with construction agreements, general conditions, bidding documents, contractor-subcontractor relationships, project records, payment procedures, changes in the work, responsibilities of project participants, and other contract-related subjects.\u003c\/p\u003e\n\u003cp\u003eThe Project Management examination addresses the planning, coordination, supervision, and technical administration of construction work. The reference library covers Florida building codes, residential construction requirements, accessibility, energy conservation, existing buildings, federal OSHA construction regulations, estimating, concrete mixtures, reinforcing-bar placement, gypsum panel installation, wood-truss handling and bracing, and broader construction principles.\u003c\/p\u003e\n\u003cp\u003eThe Florida Department of Business and Professional Regulation contracts with Professional Testing, Inc. for candidate registration, examination development, and scoring. Approved candidates schedule their computer-based examinations through Pearson VUE, the state’s examination administration provider.\u003c\/p\u003e\n\u003cp\u003eCandidates should complete the appropriate examination application, receive authorization, and schedule the required examination parts according to the current state process. Examination reservations, identification rules, permitted materials, testing-center procedures, and other requirements are explained in the current Florida construction examination candidate information.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor Contract Administration and Project Management examinations are open book. Candidates may bring permitted references for the examination part being taken, provided the materials comply with the current testing rules.\u003c\/p\u003e\n\u003cp\u003eAn open-book examination tests more than a candidate’s ability to recognize facts. Students must analyze the question, determine the subject, select the appropriate book, locate the controlling section, interpret the information, and apply it to the available answer choices. Effective preparation combines construction knowledge with repeated reference-navigation practice.\u003c\/p\u003e\n\u003cp\u003eThe highlighting and tabbing portion of the course helps candidates create a more organized book system. Useful tabs may identify major chapters, contract articles, code divisions, safety topics, estimating sections, tables, definitions, and technical subjects. Highlighting can draw attention to important provisions while preserving enough surrounding context to understand how the information applies.\u003c\/p\u003e\n\u003cp\u003eStudents should not rely on a tab or highlighted sentence as a substitute for reading. The correct response may depend on a definition, exception, note, table, related section, or qualifying statement located near the marked material. Practice should include reading the full applicable passage and confirming that it addresses the facts presented in the question.\u003c\/p\u003e\n\u003cp\u003eTesting rules may address permanent tabs, book binding, handwritten notes, loose materials, attachments, and the condition of permitted references. Candidates must review the current official candidate information and reference list before taking books to the testing center.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eBegin by reviewing the qualifications for Florida certified residential contractor licensure. Candidates should understand the experience, education, examination, financial, background, insurance, and application requirements before investing in the licensing process.\u003c\/p\u003e\n\u003cp\u003eApply for the required state certification examinations through the current Florida construction examination process. Division I Residential Contractor candidates complete Business and Finance, Contract Administration, and Project Management. After approval, schedule the examination appointments through Pearson VUE.\u003c\/p\u003e\n\u003cp\u003eUse the official reference list to obtain the correct books and editions for each examination part. Study the content, organize permitted references, practice locating information, and complete simulated questions under timed conditions.\u003c\/p\u003e\n\u003cp\u003eAfter passing the required examination parts, submit the appropriate initial licensure application to the Florida Department of Business and Professional Regulation. The correct form depends on whether the applicant is seeking licensure as an individual, qualifying a business entity, qualifying an additional business, or applying through another authorized path.\u003c\/p\u003e\n\u003cp\u003eApplicants must provide the documentation required by the selected application. Passing the examinations does not automatically issue a contractor license or authorize regulated contracting work. The license must be approved and issued before an individual performs work that requires Florida contractor certification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe Florida Construction Industry Licensing Board regulates certified construction contractors within the authority of the Florida Department of Business and Professional Regulation. A certified contractor holds a state-issued certificate of competency and may operate within the legal scope of the license throughout Florida, subject to applicable permitting, building-code, and local administrative requirements.\u003c\/p\u003e\n\u003cp\u003eApplicants for certified contractor licensure are generally required to document four years of qualifying experience or an accepted combination of college education and construction experience. Experience must relate to the category of license being requested and must be documented according to the current application instructions.\u003c\/p\u003e\n\u003cp\u003eCertified contractor applicants must also meet applicable financial responsibility, background, insurance, and application requirements. The documents needed may vary based on the applicant’s status, experience, business structure, and selected licensing path.\u003c\/p\u003e\n\u003cp\u003eThe residential contractor category has a defined statutory scope. Candidates should understand the type and size of residential structures covered by the license and should not assume that passing the residential examination authorizes work assigned to another contractor category or separately regulated trade.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cp\u003eThe course is organized around the following Contract Administration and Project Management references. Books are not identified as included with the online course unless the selected product offer specifically states that physical books are included.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eGeneral Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract-administration document addressing the relationships, rights, and responsibilities of the owner, contractor, and architect throughout a construction project.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction agreement covering contractor-subcontractor responsibilities, performance, coordination, payment, and other project obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInstructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA bidding reference covering proposal procedures, bidder responsibilities, submission requirements, interpretations, substitutions, and bidding administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations – 29 CFR Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe federal OSHA construction regulations covering workplace hazards, fall protection, scaffolds, excavations, electrical safety, equipment, personal protection, and other jobsite requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractors Manual, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor reference covering business administration, contracts, financial practices, employment responsibilities, insurance, taxes, and regulatory topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA broad construction resource addressing materials, methods, building systems, structural components, field practices, and project-management principles.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEnergy Efficient Building Construction in Florida, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida-focused resource covering energy-conscious construction practices, building-envelope performance, efficient systems, and climate-related building considerations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilding Component Safety Information: BCSI-ED2-D “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses,” 2020\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA specialized guide to the handling, installation, restraint, and temporary bracing of metal-plate-connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA major Florida code reference addressing construction, structural provisions, occupancy, fire and life safety, means of egress, materials, and building systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe Florida code resource for accessible routes, entrances, spaces, facilities, fixtures, clearances, and related accessibility provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary Florida code reference for regulated one- and two-family dwellings and townhouses within its scope.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA code volume covering repairs, alterations, additions, changes of occupancy, and other regulated work involving existing buildings.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe Florida code reference addressing energy-efficiency requirements for building envelopes, mechanical systems, lighting, service water heating, and related components.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilder’s Guide to Accounting – Revised Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-accounting resource covering job costs, financial statements, overhead, payroll, cash flow, and contractor recordkeeping.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn estimating resource containing labor and material information, construction data, calculation guidance, and practical estimating references.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical concrete publication covering materials, mixture proportioning, production, placement, curing, testing, durability, and performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn industry reference covering reinforcing-bar placement, supports, clearances, splices, detailing, handling, and reinforced-concrete field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical standard addressing the application, fastening, joint treatment, and finishing of gypsum panel products.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eUse the book overviews to create a subject-to-reference map. Contract questions may direct you toward the agreement documents or general conditions. Safety questions may require 29 CFR Part 1926. Residential code questions may require the Florida Building Code – Residential, while accessibility, energy, existing-building, or broader building questions may require another Florida code volume.\u003c\/p\u003e\n\u003cp\u003eSimulated practice questions help turn reading into active preparation. For each question, identify the subject before opening a book. Select the most likely reference, locate the relevant section, and confirm the answer from the text. Review incorrect responses to determine whether the problem involved subject knowledge, book selection, navigation, interpretation, calculation, or time management.\u003c\/p\u003e\n\u003cp\u003eDevelop a tabbing system that remains easy to understand. Too many tabs can make a book harder to use, so prioritize major divisions and frequently reviewed subjects. Use clear labels and maintain a consistent style across the entire reference library.\u003c\/p\u003e\n\u003cp\u003eDuring timed practice, avoid spending too long on one difficult lookup. Answer questions you know, mark questions requiring additional research, and return to them after completing more manageable items. Read every question carefully and identify words that affect the required answer, such as minimum, maximum, except, required, prohibited, first, or most appropriate.\u003c\/p\u003e\n\u003cp\u003eStudy in focused sessions rather than attempting to review every book at once. A practical schedule may rotate among contract administration, codes, safety, estimating, and construction methods. Regular repetition strengthens recall and makes the reference system more familiar.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep helps candidates organize the Florida Residential Contractor Contract Administration and Project Management material into a practical study structure. Guided book overviews help students understand the purpose of each reference and recognize which publication is likely to address a particular examination subject.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages candidates to apply information instead of relying only on passive reading. Simulated questions support reference selection, book navigation, technical interpretation, and the review of important construction concepts.\u003c\/p\u003e\n\u003cp\u003eInstruction on highlighting and tabbing helps students build an organized system for their permitted books. Test-taking techniques reinforce pacing, careful question analysis, answer elimination, and effective open-book lookup methods.\u003c\/p\u003e\n\u003cp\u003eThe course supports confidence through preparation, repetition, and familiarity with the reference library. It does not guarantee a passing score, licensing approval, or a particular examination outcome. Each candidate remains responsible for meeting state requirements, using the correct references, and following current examination rules.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich examination parts does this course cover?\u003c\/h2\u003e\n\u003cp\u003eThis course focuses on the Florida Residential Contractor Contract Administration and Project Management examination parts. Business and Finance is a separate Division I examination area.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the course include simulated practice questions?\u003c\/h2\u003e\n\u003cp\u003eYes. The course includes simulated practice questions designed to reinforce important subjects and help candidates practice reference-based problem solving. The questions are study tools and are not actual state examination questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWill the course show me how to highlight and tab my books?\u003c\/h2\u003e\n\u003cp\u003eYes. The course includes guidance for highlighting important information and tabbing major sections so candidates can create a more organized reference-navigation system.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre book overviews included?\u003c\/h2\u003e\n\u003cp\u003eYes. Book overviews explain the primary purpose and subject coverage of the listed Contract Administration and Project Management references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the course teach test-taking techniques?\u003c\/h2\u003e\n\u003cp\u003eYes. Test-taking instruction addresses question analysis, reference selection, lookup methods, pacing, answer elimination, and strategies for working through an open-book examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the Florida Residential Contractor examinations open book?\u003c\/h2\u003e\n\u003cp\u003eYes. Contract Administration and Project Management are open-book examinations, subject to the current rules for permitted references, tabs, highlighting, notes, binding, and other materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre physical books included with the online course?\u003c\/h2\u003e\n\u003cp\u003ePhysical books are included only when they are expressly identified as part of the selected product offer. The references listed on this page identify the books used to support course study and examination preparation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes completing the course automatically qualify me for a license?\u003c\/h2\u003e\n\u003cp\u003eNo. Course completion does not issue a license or replace state examination and application requirements. Candidates must pass the required examinations and satisfy the applicable Florida licensing requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the course guarantee that I will pass the examinations?\u003c\/h2\u003e\n\u003cp\u003eNo. The course provides structured preparation, simulated questions, reference guidance, and study techniques, but examination results depend on individual preparation, performance, and compliance with testing requirements.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Online Self-Study Exam Prep Only","offer_id":39253906980921,"sku":"39253906980921","price":395.0,"currency_code":"USD","in_stock":true},{"title":"Add Instructor-Led Virtual Classes [+$300]","offer_id":39253907013689,"sku":"39253907013689","price":695.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/2r8col1.jpg?v=1627586114"},{"product_id":"florida-residential-contractor-license-exam-book-set-trade-books-highlighted-tabbed","title":"Florida Residential Contractor Exam Complete Book Set - Highlighted \u0026 Tabbed","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida Residential Contractor Exam Complete Book Set - Highlighted \u0026amp; Tabbed\u003c\/h1\u003e\n\u003cp\u003ePrepare for the Florida Residential Contractor examination with a complete collection of construction references that has been highlighted and tabbed to support faster, more organized studying. The Florida Residential Contractor Exam Complete Book Set - Highlighted \u0026amp; Tabbed combines contract documents, Florida building codes, construction manuals, federal safety regulations, estimating resources, accounting materials, and technical publications used for residential contractor exam preparation.\u003c\/p\u003e\n\u003cp\u003eEach book is prepared with highlighting and tabs that help candidates identify important subject areas and move through the references more efficiently. This preparation can reduce the time spent searching through unfamiliar chapters during study sessions and help candidates develop a consistent reference-navigation routine for the open-book examination.\u003c\/p\u003e\n\u003cp\u003eHighlighted and tabbed books do not replace the need to understand the material. They provide an organized starting point for reviewing major concepts, locating frequently studied subjects, and becoming familiar with the arrangement of each reference. Candidates should practice using the books repeatedly so they know which publication to select and where to begin searching when presented with a contract, business, code, safety, estimating, or construction-method question.\u003c\/p\u003e\n\u003cp\u003eThe set covers the three examination areas required for Florida Division I contractor candidates: Business and Finance, Contract Administration, and Project Management. The references address contractor accounting, estimating, bidding, agreements, project responsibilities, workplace safety, building codes, energy conservation, accessibility, residential construction, existing buildings, concrete, reinforcing steel, gypsum products, wood trusses, and general construction practices.\u003c\/p\u003e\n\u003cp\u003eThis collection is suitable for candidates pursuing Florida certified residential contractor licensure and for construction professionals who want a broad residential contracting reference library. Many of the books can continue to serve as useful professional resources for project planning, field operations, code research, contract administration, estimating, and business management after the examination.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cp\u003eThis package includes the following highlighted and tabbed references:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eGeneral Conditions of the Contract for Construction, 2017\u003c\/li\u003e\n\u003cli\u003eStandard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/li\u003e\n\u003cli\u003eInstructions to Bidders, 2018\u003c\/li\u003e\n\u003cli\u003eCode of Federal Regulations – 29 CFR Part 1926\u003c\/li\u003e\n\u003cli\u003eContractors Manual, 2021\u003c\/li\u003e\n\u003cli\u003ePrinciples and Practices of Commercial Construction, 11th Edition\u003c\/li\u003e\n\u003cli\u003eEnergy Efficient Building Construction in Florida, 2024\u003c\/li\u003e\n\u003cli\u003eBuilding Component Safety Information: BCSI-ED2-D, 2020\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Accessibility, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Residential, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Existing Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/li\u003e\n\u003cli\u003eBuilder’s Guide to Accounting – Revised Edition\u003c\/li\u003e\n\u003cli\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition, 2024\u003c\/li\u003e\n\u003cli\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/li\u003e\n\u003cli\u003ePlacing Reinforcing Bars\u003c\/li\u003e\n\u003cli\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe highlighting draws attention to important study material, while the tabs divide major topics and commonly used sections for easier navigation. Candidates should still review the books before test day and learn how the highlighted material relates to surrounding chapters, definitions, tables, exceptions, and code provisions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eFlorida Residential Contractor candidates fall within the Division I contractor examination category. Division I candidates must pass three required examination parts: Business and Finance, Contract Administration, and Project Management.\u003c\/p\u003e\n\u003cp\u003eBusiness and Finance focuses on the responsibilities involved in operating and financially managing a contracting business. Study areas may involve accounting, estimating, job costing, business organization, contracts, payroll, taxes, insurance, financial management, and contractor obligations.\u003c\/p\u003e\n\u003cp\u003eContract Administration addresses bidding procedures, agreements, project documentation, contractual relationships, payment responsibilities, changes, claims, and the duties of owners, contractors, subcontractors, architects, and other project participants.\u003c\/p\u003e\n\u003cp\u003eProject Management emphasizes the practical administration and execution of construction work. Preparation may involve Florida building codes, safety regulations, construction methods, materials, energy requirements, concrete, reinforcement, gypsum products, wood trusses, estimating, scheduling, and project coordination.\u003c\/p\u003e\n\u003cp\u003eFlorida construction examinations in this category are administered in a computer-based testing format. Candidates apply for the applicable examination parts through Professional Testing, Inc. After receiving approval, candidates schedule their examination appointments through the state’s designated computer-based testing provider.\u003c\/p\u003e\n\u003cp\u003ePassing all required examination parts is one stage of the licensing process. A passing score does not automatically issue a contractor license. Applicants must also complete the appropriate initial licensure application and satisfy the requirements established by the Florida Construction Industry Licensing Board.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor examination is open book. Candidates may use permitted references during the applicable examination sessions, subject to the current testing rules and official reference instructions.\u003c\/p\u003e\n\u003cp\u003eAn open-book format requires strong navigation skills. Candidates need to determine which publication contains the answer, locate the correct chapter or section, read the applicable language, and use the information to solve the question. A large collection of books can become difficult to manage without regular practice, which is why organized highlighting and tabs can be valuable preparation tools.\u003c\/p\u003e\n\u003cp\u003eThe highlighted sections help direct attention to frequently studied concepts and important provisions. The tabs help divide books by subject, chapter, code section, or major topic. Together, these features can support quicker movement through the references while candidates practice answering timed questions.\u003c\/p\u003e\n\u003cp\u003eTabs and highlighting should be treated as navigation aids rather than answer keys. Examination questions may require information from surrounding paragraphs, definitions, exceptions, charts, tables, footnotes, or related code sections. Candidates should read beyond a highlighted sentence whenever necessary and understand how the provision applies to the question.\u003c\/p\u003e\n\u003cp\u003eTesting rules can govern book condition, binding, notes, attachments, tabs, and other materials. Candidates should review the current candidate information before their scheduled appointment and bring only the references permitted for the examination session being taken.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eThe process begins by reviewing the qualifications for Florida certified residential contractor licensure. Prospective candidates should understand the examination, experience, education, financial, and application requirements before registering to test.\u003c\/p\u003e\n\u003cp\u003eCandidates then register for the required examination parts. Division I Residential Contractor candidates generally complete Business and Finance, Contract Administration, and Project Management. Approved candidates schedule the computer-based examinations through the designated testing provider.\u003c\/p\u003e\n\u003cp\u003eAfter passing the required examinations, an individual seeking certification submits the appropriate initial licensure application. Florida provides different application paths depending on whether the applicant will be licensed as an individual, qualify a business entity, qualify an additional business, or pursue another authorized licensing route.\u003c\/p\u003e\n\u003cp\u003eThe application process may require documentation addressing experience or education, financial responsibility, background information, examination results, insurance, and other items included in the applicable application instructions. Applicants should complete the form that matches their intended licensing and business status.\u003c\/p\u003e\n\u003cp\u003ePassing the examination alone does not authorize a person to perform contracting work that requires licensure. The applicant must receive the appropriate Florida license before offering or performing regulated contracting services.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eFlorida certified construction contractors are regulated by the Florida Department of Business and Professional Regulation and the Construction Industry Licensing Board. A certified contractor holds a state-issued certificate of competency and may work within the authorized license scope throughout Florida, subject to applicable permitting, code, and local administrative requirements.\u003c\/p\u003e\n\u003cp\u003eFlorida defines a residential contractor as a contractor whose services are limited to the construction, remodeling, repair, or improvement of one-family, two-family, or three-family residences that are not more than two stories, together with associated accessory-use structures.\u003c\/p\u003e\n\u003cp\u003eApplicants for certified residential contractor licensure are generally required to document four years of qualifying experience or an accepted combination of college education and construction experience. The experience must meet the standards established for the license category and must be documented according to the current application instructions.\u003c\/p\u003e\n\u003cp\u003eApplicants must also satisfy additional licensing requirements, which may include demonstrating financial responsibility, meeting background and character requirements, paying applicable fees, and obtaining required insurance or workers’ compensation coverage. The exact documentation depends on the applicant’s circumstances and selected application type.\u003c\/p\u003e\n\u003cp\u003eApplicants should confirm that they qualify for the residential contractor category before paying examination and application expenses. Passing an examination does not override unmet licensing qualifications or expand the legal scope of the residential contractor license.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eGeneral Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract-administration reference addressing the relationships, rights, and responsibilities of the owner, contractor, and architect throughout a construction project.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eStandard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction agreement covering the contractual relationship between a contractor and subcontractor, including responsibilities, performance, coordination, payment, and project obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eInstructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA bidding reference addressing bidder responsibilities, proposal procedures, submission requirements, interpretations, substitutions, and other elements of the construction bidding process.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations – 29 CFR Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe federal OSHA construction-industry regulations covering jobsite safety, fall protection, excavations, scaffolds, equipment, personal protection, electrical safety, and other workplace hazards.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractors Manual, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor business reference used to study accounting, financial management, employment responsibilities, insurance, taxation, contracts, business organization, and regulatory obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA broad construction reference addressing building materials, construction methods, structural systems, project planning, field practices, and construction-management principles.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEnergy Efficient Building Construction in Florida, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida-focused publication addressing energy-conscious construction, building-envelope performance, efficient systems, moisture considerations, and energy-saving building practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilding Component Safety Information: BCSI-ED2-D “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses,” 2020\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA specialized guide covering the handling, installation, restraint, and temporary bracing of metal-plate-connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA major Florida code reference covering building construction, structural provisions, occupancy, materials, fire and life safety, means of egress, and related requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe Florida code resource addressing accessible routes, entrances, spaces, facilities, fixtures, clearances, and other accessibility requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary Florida code reference for one- and two-family dwellings and townhouses within its scope, including structural, building, safety, and system provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA code reference covering repairs, alterations, additions, changes of occupancy, and other regulated work involving existing buildings.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe Florida code volume addressing energy-efficiency provisions for building envelopes, mechanical systems, lighting, service water heating, and related components.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilder’s Guide to Accounting – Revised Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-accounting resource covering financial statements, job costs, overhead, payroll, cash flow, recordkeeping, and accounting practices used by contractors.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn estimating resource containing construction data, labor and material information, calculation guidance, and practical references for preparing project estimates.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical publication covering concrete materials, mixture proportioning, production, placement, curing, testing, durability, and performance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAn industry reference covering reinforcing-bar placement, supports, clearances, splices, detailing, handling, and reinforced-concrete field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA technical standard addressing the application, fastening, joint treatment, and finishing of gypsum panel products.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin studying by organizing the books according to Business and Finance, Contract Administration, and Project Management. Create a reference map identifying the publications most likely to contain information about accounting, contracts, bidding, OSHA safety, estimating, Florida codes, concrete, reinforcement, gypsum, trusses, and energy conservation.\u003c\/p\u003e\n\u003cp\u003ePractice locating information with the highlighted and tabbed sections, but also study each book’s table of contents, index, definitions, appendices, and chapter structure. Understanding the complete layout makes it easier to continue searching when a question is not answered directly by a highlighted passage.\u003c\/p\u003e\n\u003cp\u003eTimed lookup exercises are especially useful. Select a construction topic, find the relevant book, locate the section, and explain how the information applies. Repeat the exercise until choosing and navigating the reference becomes more natural.\u003c\/p\u003e\n\u003cp\u003eFor Business and Finance, focus on accounting records, estimating, job costs, contracts, financial management, business responsibilities, and contractor administration. For Contract Administration, review agreements, bidding, payments, changes, documentation, and relationships among project participants.\u003c\/p\u003e\n\u003cp\u003eFor Project Management, work regularly with the Florida Building Code volumes and the technical references. Review safety, materials, construction methods, energy requirements, concrete, reinforcing bars, gypsum products, truss installation, accessibility, and existing-building provisions.\u003c\/p\u003e\n\u003cp\u003eBefore the examination, compare the books in your possession with the current official reference list. Bring only the books permitted for the examination part scheduled that day and follow all rules regarding tabs, highlighting, notes, binding, and attachments.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep helps Florida contractor candidates approach a large reference library with a more organized study structure. Highlighted and tabbed books make it easier to identify key material, divide major subjects, and practice moving between commonly studied sections.\u003c\/p\u003e\n\u003cp\u003eTrade-focused preparation connects code provisions, contract language, safety requirements, business concepts, and construction methods with the types of decisions contractors make in the field and office. Practice-oriented review strengthens the ability to recognize the subject of a question, choose the correct reference, and locate supporting information.\u003c\/p\u003e\n\u003cp\u003eReference navigation is a skill that improves through repetition. Using the prepared books during timed exercises can help candidates develop a consistent lookup method and become more comfortable working with multiple references under examination conditions.\u003c\/p\u003e\n\u003cp\u003e1 Exam Prep emphasizes organized guidance, realistic study habits, construction-focused review, and confidence-building preparation. The goal is to help students build stronger subject knowledge and more effective book-navigation skills without making guarantees about examination scores, licensing approval, or individual results.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all books in this set highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. This product is the highlighted and tabbed version of the Florida Residential Contractor Exam Complete Book Set. The preparation is intended to support organized studying and faster reference navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Florida Residential Contractor examination open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The examination is open book, subject to the current rules governing permitted references, tabs, highlighting, book condition, notes, and other materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich examinations must a Florida Residential Contractor candidate pass?\u003c\/h2\u003e\n\u003cp\u003eResidential Contractor candidates are in the Division I category and must complete Business and Finance, Contract Administration, and Project Management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDo highlighting and tabs guarantee that I will pass?\u003c\/h2\u003e\n\u003cp\u003eNo. Highlighting and tabs are study and navigation aids. Candidates must still learn the material, practice locating information, prepare for the required examination parts, and satisfy all licensing requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes the set include Florida Building Code references?\u003c\/h2\u003e\n\u003cp\u003eYes. The set includes the 2023 Florida Building Code volumes for Building, Accessibility, Residential, Existing Building, and Energy Conservation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre business, accounting, and estimating books included?\u003c\/h2\u003e\n\u003cp\u003eYes. The set includes the Contractors Manual, Builder’s Guide to Accounting, Walker’s Building Estimator’s Reference Book, contract documents, and bidding materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes passing the exam automatically issue a Florida contractor license?\u003c\/h2\u003e\n\u003cp\u003eNo. Passing the required examination parts allows an applicant to continue through the licensing process. The applicant must submit the correct application and meet the applicable experience, financial, insurance, background, and documentation requirements.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan these references be useful after the exam?\u003c\/h2\u003e\n\u003cp\u003eYes. The collection contains practical resources for building codes, safety, contracts, estimating, accounting, construction methods, concrete, reinforcing steel, gypsum products, trusses, accessibility, and energy-efficient construction.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Highlighted \u0026 Tabbed Book Set","offer_id":46190548123705,"sku":"BUNDLE-RESCON-TAB\/HI-1","price":2495.0,"currency_code":"USD","in_stock":true},{"title":"Highlighted \u0026 Tabbed Books + Online Self Study Course [+$395]","offer_id":46190548156473,"sku":"BUNDLE-RESCON-TAB\/HI-2","price":2890.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/FLORIDA_RESIDENTIAL-CONTRACTOR_HIGHLIGHTS.png?v=1622672754"},{"product_id":"copy-of-ga-216-2016-application-and-finishing-of-gypsum-panel-products-2016-edition","title":"GA-216-2018: Application and Finishing of Gypsum Panel Products, 2018 Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eGA-216-2018: Application and Finishing of Gypsum Panel Products, 2018 Edition\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe GA-216-2018: Application and Finishing of Gypsum Panel Products, 2018 Edition, available through 1 Exam Prep, is the official standard published by the Gypsum Association outlining the proper installation and finishing procedures for gypsum board systems. This manual details requirements for framing, fasteners, joint treatment, and surface preparation to ensure compliance with ASTM and building code standards. It serves as an essential reference for contractors, drywall installers, and inspectors involved in residential and commercial construction. The 2018 edition updates best practices for mechanical, adhesive, and thermal installations and aligns with fire-resistance and sound-control specifications. Widely used in contractor licensing and trade exams, GA-216-2018 provides the authoritative guidance necessary for high-quality, code-compliant gypsum panel applications.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eThis illustrated booklet describes the most up-to-date industry recommendations for the proper installation and finishing of gypsum board, including related accessories, over a variety of substrates and framing.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe new 2018 specification provides appropriate installation methods for most gypsum panels, including:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eThe more common regular and type X wallboards\u003c\/li\u003e\n\u003cli\u003eSpecialized performance boards such as glass mat water-resistant gypsum panels\u003c\/li\u003e\n\u003cli\u003eAbuse-resistant and impact-resistant gypsum panels\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eGA-216 is referenced in the International Building Code as an appropriate standard for the application and installation of gypsum boards and panels.\u003c\/p\u003e\n\u003cp\u003eNew to this edition are specifications for the application of gypsum panels to flat wall insulating concrete forms (ICFs). This product is popular among residential, multifamily, and commercial builders due to its combination of high thermal mass and insulation, which reduce heating and cooling costs. Gypsum wallboard is the most popular interior finish for these structures and GA-216 provides needed guidance in this growing construction field.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eThe Booklet Features:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eNew specifications for the application of gypsum panels to flat wall insulating concrete forms (ICFs)\u003c\/li\u003e\n\u003cli\u003eApplication of single-and multi-layer gypsum panel products to wood framing members\u003c\/li\u003e\n\u003cli\u003eGypsum panel product application over steel framing and furring\u003c\/li\u003e\n\u003cli\u003eSemi and solid gypsum panel products partitions\u003c\/li\u003e\n\u003cli\u003eAdhesive application of gypsum panel products to interior masonry, concrete, or brick walls\u003c\/li\u003e\n\u003cli\u003eGypsum panel product application over rigid plastic foam insulation\u003c\/li\u003e\n\u003cli\u003eApplication of rigid predecorated combustible panels (paneling) to gypsum substrate\u003c\/li\u003e\n\u003cli\u003eApplying gypsum panel products to outside corners, arches, and curves\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eArchitects and specifiers consult GA-216 to:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eEnsure proper handling and storage of wallboard on the jobsite\u003c\/li\u003e\n\u003cli\u003eGuide installation of gypsum boards over appropriately spaced and installed wood or steel framing\u003c\/li\u003e\n\u003cli\u003eDetermine when and if control joints should be used, to name just a few examples\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eInstallers rely on GA-216 to determine appropriate methods of installation. It guides wallboard layout, selection of fastener types, and fastener spacing for many different gypsum panel types. A new detail illustrates and clarifies existing language describing the proper placement of joints around window and door openings.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eProduct Code\/ISBN: 9781557019677\u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eYear: 2018 \u003c\/span\u003e\u003cbr\u003e\u003cspan\u003eBinding: Softcover \u003c\/span\u003e\u003cbr\u003e\u003cspan\u003ePublisher: BNi Building News\u003c\/span\u003e\u003c\/p\u003e\n\u003cscript src=\"https:\/\/cdn.inspectlet.com\/inspectifr\/1199436174.js\" type=\"text\/javascript\"\u003e\u003c\/script\u003e","brand":"Gypsum Association\/BNi Building News","offers":[{"title":"Default Title","offer_id":18504509882425,"sku":"9781557018922","price":54.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/GA-216-2018_GYPSUM_ASSOCIATION-FINAL.png?v=1545934940"},{"product_id":"building-component-safety-information-book-bcsi","title":"Building Component Safety Information Book (BCSI), 2025","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eBuilding Component Safety Information Book (BCSI), 2025\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe Building Component Safety Information Book (BCSI), 2025 Edition, available through 1 Exam Prep, is the industry-standard guide jointly published by the Structural Building Components Association (SBCA) and the Truss Plate Institute (TPI). This manual provides critical guidance on the safe handling, installation, bracing, and permanent restraint of structural building components such as roof trusses and wall panels. The 2025 edition reflects current building code references, engineering practices, and safety requirements for residential and commercial construction. Commonly used by contractors, framers, and inspectors, the BCSI serves as a key reference for ensuring compliance with OSHA and International Building Code (IBC) standards. It is an essential resource for maintaining structural integrity and safety in wood framing and truss system applications.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eBuilding Component Safety Information Guide to Good Practice for Handling, Installing, Restraining \u0026amp; Bracing of Metal Plate Connected Wood Trusses, 2025\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe new \u003cstrong\u003eBCSI-2025\u003c\/strong\u003e guide will provide the users, including component manufacturers, designers, framers, and building officials with an easy to understand, and use, guide that provides background information as well as prescriptive recommendations for the safe installation and bracing of floor and roof trusses. The new version of the flagship documents represents a complete revision to the document. Most notably, the historic B-series arrangement of the document has been transformed into a document with a chapter layout including section numbering to streamline content in a chronological order and reduce content redundancy. Additionally, content is presented in a single column text format with updated graphs. The technical content and prescriptive recommendations in the guide were enhanced, clarified, and improved as well. \u003c\/p\u003e\n\u003cp\u003eProduced by SBCA, BCSI is the truss industry's guide for jobsite safety and truss performance. This 8.5\" x 11\" edition (3-hole punched and spiral bound) includes the most current information regarding the handling, installation, restraining and bracing of metal plate connected wood trusses.\u003c\/p\u003e","brand":"SBCA","offers":[{"title":"Default Title","offer_id":18598061211705,"sku":"BCSI-2018","price":49.95,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/BCSI.png?v=1741200953"},{"product_id":"expedited-tabbing-fee","title":"Expedited Service - Tabbing and Highlighting","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eEXPEDITED SERVICE - TABBING AND HIGHLIGHTING\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe EXPEDITED SERVICE - TABBING AND HIGHLIGHTING option from 1 Exam Prep provides a streamlined solution for candidates preparing for state contractor licensing exams such as the Florida CILB and ECLB certifications. This service accelerates the manual process of tabbing and highlighting the official reference books used in exam settings, ensuring compliance with open-book exam guidelines. The expedited service is applicable to book sets for licenses including General Contractor, Roofing Contractor, Plumbing Contractor, HVAC, Electrical, and Irrigation certifications. By organizing and marking the state-approved materials, this offering assists examinees in locating key code sections and formulas quickly during the Business and Finance and trade exams, supporting compliance with DBPR and PSI testing requirements. This service is specifically designed for those utilizing 1 Exam Prep’s official tabbing and highlighting standards for Florida contractor license examinations.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003eExpedited Tabbing and Highlighting\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: rgb(255, 42, 0);\"\u003e\u003cem\u003e***Please allow approximately 5 business days for highlighted orders***\u003c\/em\u003e\u003c\/span\u003e\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":18758920929337,"sku":"18758920929337","price":400.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/logo_e439a12e-c9f2-42e1-b8a5-85eecbfd8dae.png?v=1638629816"},{"product_id":"code-of-federal-regulations-osha-29-part-1926","title":"OSHA 29 CFR 1926 Construction Industry Regulations, January 1, 2026 Edition","description":"\u003ch1 style=\"text-align: center; color: #000;\"\u003eOSHA 29 CFR 1926 Construction Industry Regulations, January 1, 2026 Edition\u003c\/h1\u003e\n\u003cp style=\"text-align: center;\"\u003eThe \u003cem\u003eOSHA 29 CFR 1926 Construction Industry Regulations, January 1, 2026 Edition\u003c\/em\u003e is an essential reference text for professionals preparing through 1 Exam Prep for construction-related licensing and safety certification exams. Published under the authority of the U.S. Department of Labor’s Occupational Safety and Health Administration (OSHA), this volume covers federal safety and health standards specific to the construction industry, including updates to Subpart M on fall protection, Subpart K on electrical safety, and Subpart L on scaffolding. This 2025 edition ensures compliance with current federal regulations required for contractor licensing, OSHA outreach training, and trade exam preparation. It aligns with 1 Exam Prep’s curriculum for general, roofing, and building contractor exam prep, serving as a core regulatory resource for CILB and NASCLA-related courses and continuing education requirements across Florida and other states.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eOSHA 29 CFR 1926 Construction Regulations book provide quick and easy access to critical safety guidance at any time. This important reference will help employers and employees both quickly identify potential safety concerns and hazards on any job.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong data-mce-fragment=\"1\"\u003eEdition:\u003c\/strong\u003e\u003cspan data-mce-fragment=\"1\"\u003e Updated through January 1, 2026\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eOSHA Construction Industry Regulations Features:\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eTwo-color layout makes navigating and reading regulations easier\u003c\/li\u003e\n\u003cli\u003eIncludes all 1926 regulations, 1903 regulations covering inspections, citations and penalties, 1904 regulations covering record keeping and reporting occupational injuries and illness, and select 1910 regulations pertaining to construction industries\u003c\/li\u003e\n\u003cli\u003eEasy-to-find regulations changes for the period between book releases\u003c\/li\u003e\n\u003cli\u003eEasy-to-find OSHA interpretations icon show’s which page and which regulations have interpretations to reference\u003c\/li\u003e\n\u003cli\u003eContains OSHA Form 300, and Cancer Policy\u003c\/li\u003e\n\u003cli\u003eContains In-Cite Referencing to 1910 Regulations where applicable\u003c\/li\u003e\n\u003cli\u003eMost Frequently Cited Standards preceding relevant Subparts\u003c\/li\u003e\n\u003cli\u003ePublisher: National Safety Council\u003c\/li\u003e\n\u003cli\u003eISBN: 978-1-61946-812-2\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003ePART 1926 - SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION\u003cbr\u003e\u003cbr\u003eSubpart A-General\u003cbr\u003e\u003cbr\u003e§1926.1 Purpose and scope.\u003cbr\u003e§1926.2 Variances from safety and health standards.\u003cbr\u003e§1926.3 Inspections-right of entry.\u003cbr\u003e§1926.4 Rules of practice for administrative adjudications for enforcement of safety and health standards.\u003cbr\u003e§1926.5 OMB control numbers under the Paperwork Reduction Act.\u003cbr\u003e§1926.6 Incorporation by reference.\u003cbr\u003e\u003cbr\u003eSubpart B-General Interpretations\u003cbr\u003e\u003cbr\u003e§1926.10 Scope of subpart.\u003cbr\u003e§1926.11 Coverage under section 103 of the act distinguished.\u003cbr\u003e§1926.12 Reorganization Plan No. 14 of 1950.\u003cbr\u003e§1926.13 Interpretation of statutory terms.\u003cbr\u003e§1926.14 Federal contract for \"mixed\" types of performance.\u003cbr\u003e§1926.15 Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act.\u003cbr\u003e§1926.16 Rules of construction.\u003cbr\u003e\u003cbr\u003eSubpart C-General Safety and Health Provisions\u003cbr\u003e\u003cbr\u003e§1926.20 General safety and health provisions.\u003cbr\u003e§1926.21 Safety training and education.\u003cbr\u003e§1926.22 Recording and reporting of injuries. [Reserved]\u003cbr\u003e§1926.23 First aid and medical attention.\u003cbr\u003e§1926.24 Fire protection and prevention.\u003cbr\u003e§1926.25 Housekeeping.\u003cbr\u003e§1926.26 Illumination.\u003cbr\u003e§1926.27 Sanitation.\u003cbr\u003e§1926.28 Personal protective equipment.\u003cbr\u003e§1926.29 Acceptable certifications.\u003cbr\u003e§1926.30 Shipbuilding and ship repairing.\u003cbr\u003e§1926.32 Definitions.\u003cbr\u003e§1926.33 Access to employee exposure and medical records.\u003cbr\u003e§1926.34 Means of egress.\u003cbr\u003e§1926.35 Employee emergency action plans.\u003cbr\u003e\u003cbr\u003eSubpart D-Occupational Health and Environmental Controls\u003cbr\u003e\u003cbr\u003e§1926.50 Medical services and first aid.\u003cbr\u003e§1926.51 Sanitation.\u003cbr\u003e§1926.52 Occupational noise exposure.\u003cbr\u003e§1926.53 Ionizing radiation.\u003cbr\u003e§1926.54 Nonionizing radiation.\u003cbr\u003e§1926.55 Gases, vapors, fumes, dusts, and mists.\u003cbr\u003e§1926.56 Illumination.\u003cbr\u003e§1926.57 Ventilation.\u003cbr\u003e§1926.58 [Reserved]\u003cbr\u003e§1926.59 Hazard communication.\u003cbr\u003e§1926.60 Methylenedianiline.\u003cbr\u003e§1926.61 Retention of DOT markings, placards and labels.\u003cbr\u003e§1926.62 Lead.\u003cbr\u003e§1926.64 Process safety management of highly hazardous chemicals.\u003cbr\u003e§1926.65 Hazardous waste operations and emergency response.\u003cbr\u003e§1926.66 Criteria for design and construction of spray booths.\u003cbr\u003e\u003cbr\u003eSubpart E-Personal Protective and Life Saving Equipment\u003cbr\u003e\u003cbr\u003e§1926.95 Criteria for personal protective equipment.\u003cbr\u003e§1926.96 Occupational foot protection.\u003cbr\u003e§1926.97 Electrical protective equipment.\u003cbr\u003e§1926.98 [Reserved]\u003cbr\u003e§1926.100 Head protection.\u003cbr\u003e§1926.101 Hearing protection.\u003cbr\u003e§1926.102 Eye and face protection.\u003cbr\u003e§1926.103 Respiratory protection.\u003cbr\u003e§1926.104 Safety belts, lifelines, and lanyards.\u003cbr\u003e§1926.105 Safety nets.\u003cbr\u003e§1926.106 Working over or near water.\u003cbr\u003e§1926.107 Definitions applicable to this subpart.\u003cbr\u003e\u003cbr\u003eSubpart F-Fire Protection and Prevention\u003cbr\u003e\u003cbr\u003e§1926.150 Fire protection.\u003cbr\u003e§1926.151 Fire prevention.\u003cbr\u003e§1926.152 Flammable liquids.\u003cbr\u003e§1926.153 Liquefied petroleum gas (LP-Gas).\u003cbr\u003e§1926.154 Temporary heating devices.\u003cbr\u003e§1926.155 Definitions applicable to this subpart.\u003cbr\u003e\u003cbr\u003eSubpart G-Signs, Signals, and Barricades\u003cbr\u003e\u003cbr\u003e§1926.200 Accident prevention signs and tags.\u003cbr\u003e§1926.201 Signaling.\u003cbr\u003e§1926.202 Barricades.\u003cbr\u003e§1926.203 Definitions applicable to this subpart.\u003cbr\u003e\u003cbr\u003eSubpart H-Materials Handling, Storage, Use, and Disposal\u003cbr\u003e\u003cbr\u003e§1926.250 General requirements for storage.\u003cbr\u003e§1926.251 Rigging equipment for material handling.\u003cbr\u003e§1926.252 Disposal of waste materials.\u003cbr\u003e\u003cbr\u003eSubpart I-Tools-Hand and Power\u003cbr\u003e\u003cbr\u003e§1926.300 General requirements.\u003cbr\u003e§1926.301 Hand tools.\u003cbr\u003e§1926.302 Power-operated hand tools.\u003cbr\u003e§1926.303 Abrasive wheels and tools.\u003cbr\u003e§1926.304 Woodworking tools.\u003cbr\u003e§1926.305 Jacks-lever and ratchet, screw, and hydraulic.\u003cbr\u003e§1926.306 Air receivers.\u003cbr\u003e§1926.307 Mechanical power-transmission apparatus.\u003cbr\u003e\u003cbr\u003eSubpart J-Welding and Cutting\u003cbr\u003e\u003cbr\u003e§1926.350 Gas welding and cutting.\u003cbr\u003e§1926.351 Arc welding and cutting.\u003cbr\u003e§1926.352 Fire prevention.\u003cbr\u003e§1926.353 Ventilation and protection in welding, cutting, and heating.\u003cbr\u003e§1926.354 Welding, cutting, and heating in way of preservative coatings.\u003cbr\u003e\u003cbr\u003eSubpart K-Electrical\u003cbr\u003e\u003cbr\u003eGeneral\u003cbr\u003e\u003cbr\u003e§1926.400 Introduction.\u003cbr\u003e§1926.401 [Reserved]\u003cbr\u003e\u003cbr\u003eInstallation Safety Requirements\u003cbr\u003e\u003cbr\u003e§1926.402 Applicability.\u003cbr\u003e§1926.403 General requirements.\u003cbr\u003e§1926.404 Wiring design and protection.\u003cbr\u003e§1926.405 Wiring methods, components, and equipment for general use.\u003cbr\u003e§1926.406 Specific purpose equipment and installations.\u003cbr\u003e§1926.407 Hazardous (classified) locations.\u003cbr\u003e§1926.408 Special systems.\u003cbr\u003e§§1926.409-1926.415 [Reserved]\u003cbr\u003e\u003cbr\u003eSafety-Related Work Practices\u003cbr\u003e\u003cbr\u003e§1926.416 General requirements.\u003cbr\u003e§1926.417 Lockout and tagging of circuits.\u003cbr\u003e§§1926.418-1926.430 [Reserved]\u003cbr\u003e\u003cbr\u003eSafety-Related Maintenance and Environmental Considerations\u003cbr\u003e\u003cbr\u003e§1926.431 Maintenance of equipment.\u003cbr\u003e§1926.432 Environmental deterioration of equipment.\u003cbr\u003e§§1926.433-1926.440 [Reserved]\u003cbr\u003e\u003cbr\u003eSafety Requirements for Special Equipment\u003cbr\u003e\u003cbr\u003e§1926.441 Batteries and battery charging.\u003cbr\u003e§§1926.442-1926.448 [Reserved]\u003cbr\u003e\u003cbr\u003eDefinitions\u003cbr\u003e\u003cbr\u003e§1926.449 Definitions applicable to this subpart.\u003cbr\u003e\u003cbr\u003eSubpart L-Scaffolds\u003cbr\u003e\u003cbr\u003e§1926.450 Scope, application and definitions applicable to this subpart.\u003cbr\u003e§1926.451 General requirements.\u003cbr\u003e§1926.452 Additional requirements applicable to specific types of scaffolds.\u003cbr\u003e§1926.453 Aerial lifts.\u003cbr\u003e§1926.454 Training requirements.\u003cbr\u003e(Non-mandatory) Appendix A to Subpart L of Part 1926-Scaffold Specifications\u003cbr\u003e(Non-mandatory) Appendix B to Subpart L of Part 1926-Criteria for Determining the Feasibility of Providing Safe Access and Fall Protection for Scaffold Erectors and Dismantlers [Reserved]\u003cbr\u003e(Non-mandatory) Appendix C to Subpart L of Part 1926-List of National Consensus Standards\u003cbr\u003e(Non-mandatory) Appendix D to Subpart L of Part 1926-List of Training Topics for Scaffold Erectors and Dismantlers\u003cbr\u003e(Non-mandatory) Appendix E to Subpart L of Part 1926-Drawings and Illustrations\u003cbr\u003e\u003cbr\u003eSubpart M-Fall Protection\u003cbr\u003e\u003cbr\u003e§1926.500 Scope, application, and definitions applicable to this subpart.\u003cbr\u003e§1926.501 Duty to have fall protection.\u003cbr\u003e§1926.502 Fall protection systems criteria and practices.\u003cbr\u003e§1926.503 Training requirements.\u003cbr\u003eAppendix A to Subpart M of Part 1926-Determining Roof Widths\u003cbr\u003eAppendix B to Subpart M of Part 1926-Guardrail Systems\u003cbr\u003eAppendix C to Subpart M of Part 1926-Personal Fall Arrest Systems\u003cbr\u003eAppendix D to Subpart M of Part 1926-Positioning Device Systems\u003cbr\u003eAppendix E to Subpart M of Part 1926-Sample Fall Protection Plan\u003cbr\u003e\u003cbr\u003eSubpart N-Helicopters, Hoists, Elevators, and Conveyors\u003cbr\u003e\u003cbr\u003e§1926.550 [Reserved]\u003cbr\u003e§1926.551 Helicopters.\u003cbr\u003e§1926.552 Material hoists, personnel hoists, and elevators.\u003cbr\u003e§1926.553 Base-mounted drum hoists.\u003cbr\u003e§1926.554 Overhead hoists.\u003cbr\u003e§1926.555 Conveyors.\u003cbr\u003e\u003cbr\u003eSubpart O-Motor Vehicles, Mechanized Equipment, and Marine Operations\u003cbr\u003e\u003cbr\u003e§1926.600 Equipment.\u003cbr\u003e§1926.601 Motor vehicles.\u003cbr\u003e§1926.602 Material handling equipment.\u003cbr\u003e§1926.603 Pile driving equipment.\u003cbr\u003e§1926.604 Site clearing.\u003cbr\u003e§1926.605 Marine operations and equipment.\u003cbr\u003e§1926.606 Definitions applicable to this subpart.\u003cbr\u003e\u003cbr\u003eSubpart P-Excavations\u003cbr\u003e\u003cbr\u003e§1926.650 Scope, application, and definitions applicable to this subpart.\u003cbr\u003e§1926.651 Specific excavation requirements.\u003cbr\u003e§1926.652 Requirements for protective systems.\u003cbr\u003eAppendix A to Subpart P of Part 1926-Soil Classification\u003cbr\u003eAppendix B to Subpart P of Part 1926-Sloping and Benching\u003cbr\u003eAppendix C to Subpart P of Part 1926-Timber Shoring for Trenches\u003cbr\u003eAppendix D to Subpart P of Part 1926-Aluminum Hydraulic Shoring for Trenches\u003cbr\u003eAppendix E to Subpart P of Part 1926-Alternatives to Timber Shoring\u003cbr\u003eAppendix F to Subpart P of Part 1926-Selection of Protective Systems\u003cbr\u003e\u003cbr\u003eSubpart Q-Concrete and Masonry Construction\u003cbr\u003e\u003cbr\u003e§1926.700 Scope, application, and definitions applicable to this subpart.\u003cbr\u003e§1926.701 General requirements.\u003cbr\u003e§1926.702 Requirements for equipment and tools.\u003cbr\u003e§1926.703 Requirements for cast-in-place concrete.\u003cbr\u003e§1926.704 Requirements for precast concrete.\u003cbr\u003e§1926.705 Requirements for lift-slab construction operations.\u003cbr\u003e§1926.706 Requirements for masonry construction.\u003cbr\u003eAppendix A to Subpart Q of Part 1926-References to subpart Q of Part 1926\u003cbr\u003e\u003cbr\u003eSubpart R-Steel Erection\u003cbr\u003e\u003cbr\u003e§1926.750 Scope.\u003cbr\u003e§1926.751 Definitions.\u003cbr\u003e§1926.752 Site layout, site-specific erection plan and construction sequence.\u003cbr\u003e§1926.753 Hoisting and rigging.\u003cbr\u003e§1926.754 Structural steel assembly.\u003cbr\u003e§1926.755 Column anchorage.\u003cbr\u003e§1926.756 Beams and columns.\u003cbr\u003e§1926.757 Open web steel joists.\u003cbr\u003e§1926.758 Systems-engineered metal buildings.\u003cbr\u003e§1926.759 Falling object protection.\u003cbr\u003e§1926.760 Fall protection.\u003cbr\u003e§1926.761 Training.\u003cbr\u003eAppendix A to Subpart R of Part 1926-Guidelines for Establishing the Components of a Site-specific Erection Plan: Non-mandatory Guidelines for Complying With §1926.752(e) \u003cbr\u003eAppendix B to Subpart R of Part 1926 [Reserved] \u003cbr\u003eAppendix C to Subpart R of Part 1926-Illustrations of Bridging Terminus Points: Non-mandatory Guidelines for Complying With §§1926.757(a)(10) and §1926.757(c)(5)\u003cbr\u003eAppendix D to Subpart R of Part 1926-Illustration of the Use of Control Lines To Demarcate Controlled Decking Zones (CDZs): Non-mandatory Guidelines for Complying With §1926.760(c)(3)\u003cbr\u003eAppendix E to Subpart R of Part 1926-Training: Non-mandatory Guidelines for Complying With §1926.761\u003cbr\u003eAppendix F to Subpart R of Part 1926-Perimeter Columns: Non-Mandatory Guidelines for Complying With §1926.756(e) To Protect the Unprotected Side or Edge of a Walking\/Working Surface\u003cbr\u003eAppendix G to Subpart R of Part 1926-§1926.502 (b)-(e) Fall Protection Systems Criteria and Practices \u003cbr\u003eAppendix H to Subpart R of Part 1926-Double Connections: Illustration of a Clipped End Connection and a Staggered Connection: Non-Mandatory Guidelines for Complying With §1926.756(c)(1)\u003cbr\u003e\u003cbr\u003eSubpart S-Underground Construction, Caissons, Cofferdams and Compressed Air\u003cbr\u003e\u003cbr\u003e§1926.800 Underground construction.\u003cbr\u003e§1926.801 Caissons.\u003cbr\u003e§1926.802 Cofferdams.\u003cbr\u003e§1926.803 Compressed air.\u003cbr\u003e§1926.804 Definitions applicable to this subpart.\u003cbr\u003eAppendix A to Subpart S of Part 1926-Decompression Tables\u003cbr\u003e\u003cbr\u003eSubpart T-Demolition\u003cbr\u003e\u003cbr\u003e§1926.850 Preparatory operations.\u003cbr\u003e§1926.851 Stairs, passageways, and ladders.\u003cbr\u003e§1926.852 Chutes.\u003cbr\u003e§1926.853 Removal of materials through floor openings.\u003cbr\u003e§1926.854 Removal of walls, masonry sections, and chimneys.\u003cbr\u003e§1926.855 Manual removal of floors.\u003cbr\u003e§1926.856 Removal of walls, floors, and material with equipment.\u003cbr\u003e§1926.857 Storage.\u003cbr\u003e§1926.858 Removal of steel construction.\u003cbr\u003e§1926.859 Mechanical demolition.\u003cbr\u003e§1926.860 Selective demolition by explosives.\u003cbr\u003e\u003cbr\u003eSubpart U-Blasting and the Use of Explosives\u003cbr\u003e\u003cbr\u003e§1926.900 General provisions.\u003cbr\u003e§1926.901 Blaster qualifications.\u003cbr\u003e§1926.902 Surface transportation of explosives.\u003cbr\u003e§1926.903 Underground transportation of explosives.\u003cbr\u003e§1926.904 Storage of explosives and blasting agents.\u003cbr\u003e§1926.905 Loading of explosives or blasting agents.\u003cbr\u003e§1926.906 Initiation of explosive charges-electric blasting.\u003cbr\u003e§1926.907 Use of safety fuse.\u003cbr\u003e§1926.908 Use of detonating cord.\u003cbr\u003e§1926.909 Firing the blast.\u003cbr\u003e§1926.910 Inspection after blasting.\u003cbr\u003e§1926.911 Misfires.\u003cbr\u003e§1926.912 Underwater blasting.\u003cbr\u003e§1926.913 Blasting in excavation work under compressed air.\u003cbr\u003e§1926.914 Definitions applicable to this subpart.\u003cbr\u003e\u003cbr\u003eSubpart V-Electric Power Transmission and Distribution\u003cbr\u003e\u003cbr\u003e§1926.950 General.\u003cbr\u003e§1926.951 Medical services and first aid.\u003cbr\u003e§1926.952 Job briefing.\u003cbr\u003e§1926.953 Enclosed spaces.\u003cbr\u003e§1926.954 Personal protective equipment.\u003cbr\u003e§1926.955 Portable ladders and platforms.\u003cbr\u003e§1926.956 Hand and portable power equipment.\u003cbr\u003e§1926.957 Live-line tools.\u003cbr\u003e§1926.958 Materials handling and storage.\u003cbr\u003e§1926.959 Mechanical equipment.\u003cbr\u003e§1926.960 Working on or near exposed energized parts.\u003cbr\u003e§1926.961 Deenergizing lines and equipment for employee protection.\u003cbr\u003e§1926.962 Grounding for the protection of employees.\u003cbr\u003e§1926.963 Testing and test facilities.\u003cbr\u003e§1926.964 Overhead lines and live-line barehand work.\u003cbr\u003e§1926.965 Underground electrical installations.\u003cbr\u003e§1926.966 Substations.\u003cbr\u003e§1926.967 Special conditions.\u003cbr\u003e§1926.968 Definitions.\u003cbr\u003eAppendix A to Subpart V of Part 1926 [Reserved]\u003cbr\u003eAppendix B to Subpart V of Part 1926-Working on Exposed Energized Parts\u003cbr\u003eAppendix C to Subpart V of Part 1926-Protection From Hazardous Differences in Electric Potential\u003cbr\u003eAppendix D to Subpart V of Part 1926-Methods of Inspecting and Testing Wood Poles\u003cbr\u003eAppendix E to Subpart V of Part 1926-Protection From Flames and Electric Arcs\u003cbr\u003eAppendix F to Subpart V of Part 1926-Work-Positioning Equipment Inspection Guidelines\u003cbr\u003eAppendix G to Subpart V of Part 1926-Reference Documents\u003cbr\u003e\u003cbr\u003eSubpart W-Rollover Protective Structures; Overhead Protection\u003cbr\u003e\u003cbr\u003e§1926.1000 Rollover protective structures (ROPS) for material handling equipment.\u003cbr\u003e§1926.1001 Minimum performance criteria for rollover protective structures for designated scrapers, loaders, dozers, graders, and crawler tractors.\u003cbr\u003e§1926.1002 Protective frames (roll-over protective structures, known as ROPS) for wheel-type agricultural and industrial tractors used in construction.\u003cbr\u003e§1926.1003 Overhead protection for operators of agricultural and industrial tractors used in construction.\u003cbr\u003eAppendix A to Subpart W of Part 1926-Figures W-14 through W-28\u003cbr\u003e\u003cbr\u003eSubpart X-Stairways and Ladders\u003cbr\u003e\u003cbr\u003e§1926.1050 Scope, application, and definitions applicable to this subpart.\u003cbr\u003e§1926.1051 General requirements.\u003cbr\u003e§1926.1052 Stairways.\u003cbr\u003e§1926.1053 Ladders.\u003cbr\u003e§§1926.1054-1926.1059 [Reserved]\u003cbr\u003e§1926.1060 Training requirements.\u003cbr\u003eAppendix A to Subpart X of Part 1926-Ladders\u003cbr\u003e\u003cbr\u003eSubpart Y-Diving\u003cbr\u003e\u003cbr\u003eGeneral\u003cbr\u003e\u003cbr\u003e§1926.1071 Scope and application.\u003cbr\u003e§1926.1072 Definitions.\u003cbr\u003ePersonnel Requirements\u003cbr\u003e\u003cbr\u003e§1926.1076 Qualifications of dive team.\u003cbr\u003eGeneral Operations Procedures\u003cbr\u003e\u003cbr\u003e§1926.1080 Safe practices manual.\u003cbr\u003e§1926.1081 Pre-dive procedures.\u003cbr\u003e§1926.1082 Procedures during dive.\u003cbr\u003e§1926.1083 Post-dive procedures.\u003cbr\u003e\u003cbr\u003eSpecific Operations Procedures\u003cbr\u003e\u003cbr\u003e§1926.1084 SCUBA diving.\u003cbr\u003e§1926.1085 Surface-supplied air diving.\u003cbr\u003e§1926.1086 Mixed-gas diving.\u003cbr\u003e§1926.1087 Liveboating.\u003cbr\u003e\u003cbr\u003eEquipment Procedures and Requirements\u003cbr\u003e\u003cbr\u003e§1926.1090 Equipment.\u003cbr\u003e\u003cbr\u003eRecordkeeping\u003cbr\u003e\u003cbr\u003e§1926.1091 Recordkeeping requirements.\u003cbr\u003eAppendix A to Subpart Y of Part 1926-Examples of Conditions Which May Restrict or Limit Exposure to Hyperbaric Conditions\u003cbr\u003eAppendix B to Subpart Y of Part 1926-Guidelines for Scientific Diving\u003cbr\u003e\u003cbr\u003eSubpart Z-Toxic and Hazardous Substances\u003cbr\u003e\u003cbr\u003e§1926.1100 [Reserved]\u003cbr\u003e§1926.1101 Asbestos.\u003cbr\u003e§1926.1102 Coal tar pitch volatiles; interpretation of term.\u003cbr\u003e§1926.1103 13 carcinogens (4-Nitrobiphenyl, etc.).\u003cbr\u003e§1926.1104 alpha-Naphthylamine.\u003cbr\u003e§1926.1105 [Reserved]\u003cbr\u003e§1926.1106 Methyl chloromethyl ether.\u003cbr\u003e§1926.1107 3,3'-Dichlorobenzidiene (and its salts).\u003cbr\u003e§1926.1108 bis-Chloromethyl ether.\u003cbr\u003e§1926.1109 beta-Naphthylamine.\u003cbr\u003e§1926.1110 Benzidine.\u003cbr\u003e§1926.1111 4-Aminodiphenyl.\u003cbr\u003e§1926.1112 Ethyleneimine.\u003cbr\u003e§1926.1113 beta-Propiolactone.\u003cbr\u003e§1926.1114 2-Acetylaminofluorene.\u003cbr\u003e§1926.1115 4-Dimethylaminoazobenzene.\u003cbr\u003e§1926.1116 N-Nitrosodimethylamine.\u003cbr\u003e§1926.1117 Vinyl chloride.\u003cbr\u003e§1926.1118 Inorganic arsenic.\u003cbr\u003e§1926.1126 Chromium (VI).\u003cbr\u003e§1926.1127 Cadmium.\u003cbr\u003e§1926.1128 Benzene.\u003cbr\u003e§1926.1129 Coke oven emissions.\u003cbr\u003e§1926.1144 1,2-dibromo-3-chloropropane.\u003cbr\u003e§1926.1145 Acrylonitrile.\u003cbr\u003e§1926.1147 Ethylene oxide.\u003cbr\u003e§1926.1148 Formaldehyde.\u003cbr\u003e§1926.1152 Methylene chloride.\u003cbr\u003e§1926.1153 Respirable crystalline silica.\u003cbr\u003e\u003cbr\u003eSubpart AA-Confined Spaces in Construction\u003cbr\u003e\u003cbr\u003e§1926.1200 [Reserved]\u003cbr\u003e§1926.1201 Scope.\u003cbr\u003e§1926.1202 Definitions.\u003cbr\u003e§1926.1203 General requirements.\u003cbr\u003e§1926.1204 Permit-required confined space program.\u003cbr\u003e§1926.1205 Permitting process.\u003cbr\u003e§1926.1206 Entry permit.\u003cbr\u003e§1926.1207 Training.\u003cbr\u003e§1926.1208 Duties of authorized entrants.\u003cbr\u003e§1926.1209 Duties of attendants.\u003cbr\u003e§1926.1210 Duties of entry supervisors.\u003cbr\u003e§1926.1211 Rescue and emergency services.\u003cbr\u003e§1926.1212 Employee participation.\u003cbr\u003e§1926.1213 Provision of documents to Secretary.\u003cbr\u003e\u003cbr\u003eSubpart BB [Reserved]\u003cbr\u003e\u003cbr\u003eSubpart CC-Cranes and Derricks in Construction\u003cbr\u003e\u003cbr\u003e§1926.1400 Scope.\u003cbr\u003e§1926.1401 Definitions.\u003cbr\u003e§1926.1402 Ground conditions.\u003cbr\u003e§1926.1403 Assembly\/Disassembly-selection of manufacturer or employer procedures.\u003cbr\u003e§1926.1404 Assembly\/Disassembly-general requirements (applies to all assembly and disassembly operations).\u003cbr\u003e§1926.1405 Disassembly-additional requirements for dismantling of booms and jibs (applies to both the use of manufacturer procedures and employer procedures).\u003cbr\u003e§1926.1406 Assembly\/Disassembly-employer procedures-general requirements.\u003cbr\u003e§1926.1407 Power line safety (up to 350 kV)-assembly and disassembly.\u003cbr\u003e§1926.1408 Power line safety (up to 350 kV)-equipment operations.\u003cbr\u003e§1926.1409 Power line safety (over 350 kV).\u003cbr\u003e§1926.1410 Power line safety (all voltages)-equipment operations closer than the Table A zone.\u003cbr\u003e§1926.1411 Power line safety-while traveling under or near power lines with no load.\u003cbr\u003e§1926.1412 Inspections.\u003cbr\u003e§1926.1413 Wire rope-inspection.\u003cbr\u003e§1926.1414 Wire rope-selection and installation criteria.\u003cbr\u003e§1926.1415 Safety devices.\u003cbr\u003e§1926.1416 Operational aids.\u003cbr\u003e§1926.1417 Operation.\u003cbr\u003e§1926.1418 Authority to stop operation.\u003cbr\u003e§1926.1419 Signals-general requirements.\u003cbr\u003e§1926.1420 Signals-radio, telephone or other electronic transmission of signals.\u003cbr\u003e§1926.1421 Signals-voice signals-additional requirements.\u003cbr\u003e§1926.1422 Signals-hand signal chart.\u003cbr\u003e§1926.1423 Fall protection.\u003cbr\u003e§1926.1424 Work area control.\u003cbr\u003e§1926.1425 Keeping clear of the load.\u003cbr\u003e§1926.1426 Free fall and controlled load lowering.\u003cbr\u003e§1926.1427 Operator qualification and certification.\u003cbr\u003e§1926.1428 Signal person qualifications.\u003cbr\u003e§1926.1429 Qualifications of maintenance \u0026amp; repair employees.\u003cbr\u003e§1926.1430 Training.\u003cbr\u003e§1926.1431 Hoisting personnel.\u003cbr\u003e§1926.1432 Multiple-crane\/derrick lifts-supplemental requirements.\u003cbr\u003e§1926.1433 Design, construction and testing.\u003cbr\u003e§1926.1434 Equipment modifications.\u003cbr\u003e§1926.1435 Tower cranes.\u003cbr\u003e§1926.1436 Derricks.\u003cbr\u003e§1926.1437 Floating cranes\/derricks and land cranes\/derricks on barges.\u003cbr\u003e§1926.1438 Overhead \u0026amp; gantry cranes.\u003cbr\u003e§1926.1439 Dedicated pile drivers.\u003cbr\u003e§1926.1440 Sideboom cranes.\u003cbr\u003e§1926.1441 Equipment with a rated hoisting\/lifting capacity of 2,000 pounds or less.\u003cbr\u003e§1926.1442 Severability.\u003cbr\u003eAppendix A to Subpart CC of Part 1926-Standard Hand Signals\u003cbr\u003eAppendix B to Subpart CC of Part 1926-Assembly\/Disassembly: Sample Procedures for Minimizing the Risk of Unintended Dangerous Boom Movement\u003cbr\u003eAppendix C to Subpart CC of Part 1926-Operator Certification: Written Examination: Technical Knowledge Criteria\u003cbr\u003eAppendix A to Part 1926-Designations for General Industry Standards Incorporated Into Body of Construction Standards\u003cbr\u003e\u003cbr\u003e\u003cbr\u003e\u003c\/p\u003e","brand":"National Safety Compliance (NSC)","offers":[{"title":"Default Title","offer_id":18777775898681,"sku":"9781619468122","price":31.95,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/OSHA19262026_a613370e-5714-4a19-bc63-172f38f3f3e7.png?v=1772485159"},{"product_id":"introduction-to-becoming-a-florida-residential-contractor","title":"Introduction to Becoming a Florida Residential Contractor","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eINTRODUCTION TO BECOMING A FLORIDA RESIDENTIAL CONTRACTOR\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe Introduction to Becoming a Florida Residential Contractor course from 1 Exam Prep outlines the process for obtaining a state-issued Residential Contractor License through the Florida Construction Industry Licensing Board (CILB) under the Department of Business and Professional Regulation (DBPR). This course explains the licensing requirements established in Chapter 489, Part I of the Florida Statutes, covering eligibility criteria such as experience verification, financial responsibility, and examination qualifications. It provides an overview of the Business and Finance, Contract Administration, and Project Management exams, referencing the approved CILB book set and Florida Building Code. The Residential Contractor license authorizes construction, remodeling, repair, or improvement of single-family, two-family, or three-family residences not exceeding two habitable stories above grade. This introductory guide helps candidates understand the application process, testing standards, and continuing education obligations required to become a licensed Florida Residential Contractor.\u003c\/p\u003e\u003cbr\u003e\n\u003ch2 style=\"text-align: center;\"\u003e\u003cstrong\u003e\u003cspan style=\"color: #0000ff;\"\u003e\u003c\/span\u003e\u003c\/strong\u003e\u003c\/h2\u003e\n\u003ch2 style=\"text-align: center;\"\u003e\u003cstrong\u003e\u003cspan style=\"color: #0000ff;\"\u003eAre you considering becoming a Florida Residential Contractor?\u003c\/span\u003e\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp\u003e\u003cspan style=\"color: #0000ff;\"\u003e\u003cstrong\u003e\u003cspan style=\"font-size: 12pt;\"\u003e \u003c\/span\u003e\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: #000000;\"\u003e\u003cspan style=\"font-size: 12pt;\"\u003eGet started on your path to becoming a licensed Florida Residential Contractor by learning everything you need to know with an informative introductory online course developed by experts in the field.\u003c\/span\u003e\u003cstrong\u003e\u003cspan style=\"font-size: 12pt;\"\u003e \u003c\/span\u003e \u003c\/strong\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003e\u003cspan style=\"color: #000000;\"\u003e\u003cspan style=\"font-size: 12pt;\"\u003eTopics covered in our Introduction to Becoming a Florida Residential Contractor course include:\u003c\/span\u003e \u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eIntroduction to 1ExamPrep \u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eBenefits of becoming a licensed Residential Contractor\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eSteps required to get your license\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eScope of the required exams\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eRequired books for your exams\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eSample highlights of key areas in the required books\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"font-size: 12pt; color: #000000;\"\u003eSample simulated exam practice questions\u003c\/span\u003e\u003c\/li\u003e\n\u003cli\u003e\u003cspan style=\"color: #000000;\"\u003e\u003cspan style=\"font-size: 12pt;\"\u003eThe next steps and how 1ExamPrep can help you get licensed \u003c\/span\u003e \u003c\/span\u003e\u003c\/li\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003c\/ul\u003e\n\u003cbr\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003ccenter\u003e\n\u003ch2 style=\"text-align: center;\"\u003e\n\u003cstrong\u003e\u003cspan style=\"color: #0000ff;\"\u003eTake your first step toward success today!\u003c\/span\u003e\u003c\/strong\u003e \u003c\/h2\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003c\/center\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":31013460312121,"sku":"3001871-A","price":79.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/2r8col1.jpg?v=1627586114"},{"product_id":"financially-responsible-officer-application","title":"Financially Responsible Officer (FRO) Application - Florida","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eFINANCIALLY RESPONSIBLE OFFICER (FRO) APPLICATION - FLORIDA\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe Financially Responsible Officer (FRO) Application, administered through the Florida Department of Business and Professional Regulation (DBPR), enables qualified individuals to assume financial accountability for licensed construction businesses within the state. Offered by 1 Exam Prep, this resource provides guidance for meeting the CILB requirements related to contractor licensing and compliance with Florida Statute Chapter 489. The FRO designation applies to Certified and Registered Contractors who must demonstrate financial stability through personal credit, net worth, and bonding documentation. This application process is essential for those acting as the financial guarantor for construction entities engaged in general, building, residential, electrical, HVAC, plumbing, and specialty contracting. 1 Exam Prep’s materials align with DBPR submission standards and outline the step-by-step procedure for completing forms, notarization, and fee payment necessary for approval by the Construction Industry Licensing Board.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp style=\"font-weight: 400;\"\u003e\u003cem\u003e\u003cstrong\u003eThe Florida DBPR requires any contractor who does not have final approval in business matters to appoint a Financially Responsible Officer (FRO).  We will walk you through the process of appointing a Financially Responsible Officer and prepare the application giving you the best chance to get approved on the first try.\u003c\/strong\u003e\u003c\/em\u003e \u003c\/p\u003e\n\u003cp style=\"font-weight: 400;\"\u003eWe will:\u003c\/p\u003e\n\u003cul style=\"font-weight: 400;\"\u003e\n\u003cli\u003eEducate and consult our client on licensing process and the responsibilities of the Financially Responsible Officer versus the Contractor\u003c\/li\u003e\n\u003cli\u003ePrepare and process the application\u003c\/li\u003e\n\u003cli\u003eAssemble all necessary documents\u003c\/li\u003e\n\u003cli\u003ePrepare the applicant for Board appearance, if required\u003c\/li\u003e\n\u003cli\u003eOversee the application until its approved.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":31015637221433,"sku":"31015637221433","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/1examprep-17-APPLICATION-FL-FRO.png?v=1734444777"},{"product_id":"florida-residential-contractor-book-rental","title":"Florida Residential Contractor Exam - Premium Books \u0026 Courses Rental","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida Residential Contractor Exam - Premium Books \u0026amp; Courses Rental\u003c\/h1\u003e\n\u003cp\u003ePrepare for the Florida Residential Contractor licensing examinations with a premium rental package that combines a complete set of professionally highlighted and tabbed reference books with online business and trade exam-preparation courses. This comprehensive package is designed for candidates who want organized access to the Florida Residential Contractor exam library, including both exam-room references and supplemental study books.\u003c\/p\u003e\n\u003cp\u003eThe Florida Residential Contractor Exam - Premium Books \u0026amp; Courses Rental package supports preparation for all three Division I examination areas: Business and Finance, Contract Administration, and Project Management. The included references address Florida building codes, federal construction safety regulations, contract documents, bidding procedures, contractor accounting, business responsibilities, estimating, energy-efficient construction, concrete, reinforcing steel, gypsum panel installation, wood-truss handling, and general construction practices.\u003c\/p\u003e\n\u003cp\u003eThe books are professionally highlighted and tabbed to help students navigate important chapters, code sections, definitions, tables, contract provisions, and frequently studied topics. Highlighting draws attention to important material, while tabs create visible reference points that can make a large collection of books easier to organize and use.\u003c\/p\u003e\n\u003cp\u003eThe package also includes business and trade courses that provide a structured approach to examination preparation. Course materials help candidates understand the purpose of each reference, review major examination subjects, practice locating answers, and develop practical strategies for open-book testing. Business and Finance flash cards are included for additional review of terminology, calculations, accounting concepts, contractor responsibilities, and business-management subjects.\u003c\/p\u003e\n\u003cp\u003eThis premium rental option includes references permitted for applicable examination sections as well as supplemental books intended for study outside the testing room. Candidates can use the complete library during the preparation period and take only the currently permitted books into the applicable examination session.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eComplete Premium Rental Book Set:\u003c\/strong\u003e The full collection of professionally highlighted and tabbed Florida Residential Contractor references listed on this page.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eExam-Room References:\u003c\/strong\u003e Books identified for use during the applicable Business and Finance, Contract Administration, or Project Management examination.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSupplemental Study References:\u003c\/strong\u003e Additional estimating, concrete, reinforcing-bar, and gypsum publications included for preparation but not permitted in the trade examination room.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness and Trade Courses:\u003c\/strong\u003e Online preparation covering Business and Finance, Contract Administration, and Project Management subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness and Finance Flash Cards:\u003c\/strong\u003e Review cards developed to reinforce important business terminology, accounting concepts, contractor responsibilities, and calculation-based subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSimulated Practice Questions:\u003c\/strong\u003e Practice-oriented questions that help students review important topics and strengthen reference-navigation skills.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Overviews:\u003c\/strong\u003e Guidance explaining how the included books relate to the examination subjects and where major topics can be found.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHighlighting and Tabbing Guidance:\u003c\/strong\u003e Instruction for understanding and effectively using the professionally prepared markings in the books.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTest-Taking Techniques:\u003c\/strong\u003e Strategies for question analysis, reference selection, answer elimination, pacing, calculations, and open-book navigation.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eRental Package Price:\u003c\/strong\u003e $1,795\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $1,000\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $2,795\u003c\/p\u003e\n\u003cp\u003eThe $1,000 deposit is refundable when the books are returned in similar condition within six months from the date they are shipped.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp\u003e\u003cstrong\u003eProcessing Notice:\u003c\/strong\u003e Please allow an additional 15 business days for professionally highlighted and tabbed trade book package orders.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eFlorida Residential Contractor candidates are classified as Division I construction contractor applicants. Division I candidates must pass the Business and Finance, Contract Administration, and Project Management examinations.\u003c\/p\u003e\n\u003cp\u003eThe Business and Finance examination addresses the administrative and financial responsibilities associated with operating a contracting business. Candidates may encounter subjects involving accounting, estimating, financial statements, job costing, payroll, taxes, insurance, contracts, business organization, employment responsibilities, licensing laws, and contractor compliance.\u003c\/p\u003e\n\u003cp\u003eThe Contract Administration examination focuses on the contractual and administrative relationships involved in construction projects. Preparation includes general conditions, contractor-subcontractor agreements, bidding procedures, project documentation, payments, changes in the work, responsibilities of project participants, and contract interpretation.\u003c\/p\u003e\n\u003cp\u003eThe Project Management examination covers technical and operational construction knowledge. Major preparation areas include Florida building codes, residential construction, accessibility, existing buildings, energy conservation, OSHA requirements, materials, construction methods, estimating, concrete, reinforcing steel, gypsum panel products, wood-truss handling, and field coordination.\u003c\/p\u003e\n\u003cp\u003eFlorida construction examinations in these categories are administered through computer-based testing. Candidates apply through Professional Testing, Inc. After approval, examinations are scheduled with the state’s designated testing provider, Pearson Professional Assessments, formerly known as Pearson VUE.\u003c\/p\u003e\n\u003cp\u003eBusiness and Finance is administered as a separate examination session. Contract Administration and Project Management are also administered as separate examination parts. Candidates should plan their preparation around the subjects and permitted references associated with each scheduled session.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor examinations are open book. Candidates may use approved references during the applicable examination session, provided the books and any tabs, highlighting, notes, or binding comply with the current testing rules.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires candidates to do more than locate isolated facts. A candidate must understand the question, identify its subject, select the appropriate reference, find the controlling provision, interpret the information, and apply it to the answer choices within the allotted testing period.\u003c\/p\u003e\n\u003cp\u003eThe professionally highlighted and tabbed books included in this premium rental package are intended to make the reference library easier to study and navigate. Tabs help identify major subjects and sections. Highlighting helps draw attention to important provisions, definitions, tables, procedures, and concepts.\u003c\/p\u003e\n\u003cp\u003eCandidates should practice with the prepared books throughout the rental period. Become familiar with each book’s table of contents, index, chapters, code arrangement, contract articles, appendices, and major technical subjects. Repeated practice can help reduce the time spent deciding which reference to use.\u003c\/p\u003e\n\u003cp\u003eNot every book included in the premium package is permitted in the trade examination room. Supplemental estimating, concrete, reinforcing-bar, and gypsum publications are included as study resources. Candidates must take only approved references into the applicable testing session.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eBegin by reviewing the current requirements for Florida certified residential contractor licensure. Candidates should understand the examination, experience, education, financial, insurance, background, and application requirements before beginning the process.\u003c\/p\u003e\n\u003cp\u003eApply for the required examinations through the approved Florida construction examination registration process. Residential Contractor candidates must complete Business and Finance, Contract Administration, and Project Management.\u003c\/p\u003e\n\u003cp\u003eAfter receiving authorization, schedule the applicable examination sessions with the designated computer-based testing provider. Candidates should verify their examination dates, testing-center location, identification requirements, and permitted materials before each appointment.\u003c\/p\u003e\n\u003cp\u003eUse the included books, courses, flash cards, and simulated practice questions to prepare. Study with the physical references, complete timed lookup exercises, and practice selecting the correct book based on the subject of each question.\u003c\/p\u003e\n\u003cp\u003eAfter passing the required examinations, submit the appropriate licensure application and supporting documentation to the Florida Department of Business and Professional Regulation. The required application may differ depending on whether the candidate is applying as an individual, qualifying a business, or pursuing another available application pathway.\u003c\/p\u003e\n\u003cp\u003ePassing the examinations does not automatically issue a contractor license. Applicants must satisfy the applicable state requirements and receive approval before performing work that requires Florida Residential Contractor certification.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eThe Florida Construction Industry Licensing Board regulates certified construction contractors through the Florida Department of Business and Professional Regulation. A certified residential contractor may operate within the legal scope of the credential throughout Florida, subject to applicable permitting, code, and local administrative requirements.\u003c\/p\u003e\n\u003cp\u003eA Florida residential contractor is generally limited to the construction, remodeling, repair, or improvement of one-family, two-family, or three-family residences that are not more than two stories, together with associated accessory-use structures.\u003c\/p\u003e\n\u003cp\u003eCertified contractor applicants generally must document four years of qualifying experience or an accepted combination of college education and construction experience. The experience must satisfy the standards for the requested category and must be documented according to the current application instructions.\u003c\/p\u003e\n\u003cp\u003eApplicants may also be required to provide financial responsibility information, background documentation, insurance evidence, workers’ compensation information, examination results, and other materials required by the applicable application.\u003c\/p\u003e\n\u003cp\u003eThe books and courses in this package support examination preparation but do not replace the state application process. Candidates remain responsible for satisfying all licensing qualifications and submitting complete documentation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida code volume covering building construction, occupancy, structural provisions, materials, fire and life safety, means of egress, and related requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida reference addressing accessible routes, entrances, spaces, fixtures, clearances, facilities, and other accessibility requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe primary code reference for regulated residential construction within its scope, including structural, building, safety, and system provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA code resource covering repairs, alterations, additions, changes of occupancy, and other work involving existing buildings.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida code volume addressing energy-efficiency requirements for building envelopes, mechanical systems, lighting, service water heating, and related components.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Code of Federal Regulations, OSHA 29 CFR Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe federal construction safety regulations covering fall protection, scaffolds, excavations, electrical hazards, equipment, personal protective equipment, and other workplace requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Energy Efficient Building Construction in Florida, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida-focused resource addressing energy-conscious design and construction, building-envelope performance, efficient systems, and climate-related considerations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Building Component Safety Information: BCSI “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses,” 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA specialized safety publication covering the handling, installation, restraint, and bracing of metal-connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractors Manual, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor business and administration reference covering financial management, contracts, taxation, employment responsibilities, insurance, and regulatory subjects.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: A201 General Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract document explaining the rights, duties, and relationships of the owner, contractor, and architect during a construction project.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: A401 Standard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction agreement covering contractor-subcontractor responsibilities, coordination, performance, payment, and project obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: A701 Instructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA bidding document covering proposal procedures, bidder responsibilities, submission requirements, interpretations, and bidding administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Statutes Chapter 455, Current Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida statutory reference addressing professional regulation, licensing administration, disciplinary authority, and related requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Principles and Practices of Commercial Construction, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction reference by Ronald C. Smith and Cameron K. Andres covering materials, methods, building systems, structural components, field practices, and project management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Builder’s Guide to Accounting, Michael C. Thomsett, Copyright 2001\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-accounting resource covering job costs, financial statements, overhead, payroll, cash flow, and contractor recordkeeping. This book is permitted for the Business and Finance examination only and is not permitted for the trade examinations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Walker’s Building Estimator’s Reference Book, 33rd Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA supplemental study reference containing construction estimating data, labor and material information, calculations, and practical estimating guidance. This book is not permitted in the trade examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Design and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA supplemental concrete reference by Steven H. Kosmatka, Beatrix Kerkhoff, and William C. Panarese covering materials, mixture proportioning, placement, curing, durability, testing, and performance. This book is not permitted in the trade examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Placing Reinforcing Bars, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA supplemental reference covering reinforcing-bar placement, supports, splices, clearances, handling, detailing, and reinforced-concrete field practices. This book is not permitted in the trade examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Application and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA supplemental technical standard addressing the application, attachment, joint treatment, and finishing of gypsum panel products. This book is not permitted in the trade examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cp\u003eThe following included rental references are identified for use in the applicable examination session:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFlorida Building Code - Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Accessibility, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Residential, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Existing Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Energy Conservation, 2023\u003c\/li\u003e\n\u003cli\u003eCode of Federal Regulations, OSHA 29 CFR Part 1926\u003c\/li\u003e\n\u003cli\u003eEnergy Efficient Building Construction in Florida, 11th Edition, 2024\u003c\/li\u003e\n\u003cli\u003eBuilding Component Safety Information: BCSI Guide, 2025\u003c\/li\u003e\n\u003cli\u003eContractors Manual, 2025\u003c\/li\u003e\n\u003cli\u003eA201 General Conditions of the Contract for Construction, 2017\u003c\/li\u003e\n\u003cli\u003eA401 Standard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/li\u003e\n\u003cli\u003eA701 Instructions to Bidders, 2018\u003c\/li\u003e\n\u003cli\u003eFlorida Statutes Chapter 455, Current Edition\u003c\/li\u003e\n\u003cli\u003ePrinciples and Practices of Commercial Construction, 11th Edition, 2024\u003c\/li\u003e\n\u003cli\u003eBuilder’s Guide to Accounting, Copyright 2001, for the Business and Finance examination only\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe following included books are supplemental study references and are not permitted in the trade examination room:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition\u003c\/li\u003e\n\u003cli\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/li\u003e\n\u003cli\u003ePlacing Reinforcing Bars, 10th Edition\u003c\/li\u003e\n\u003cli\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eBegin with the course book overviews to understand which references apply to each examination area. Separate the library into Business and Finance, Contract Administration, Project Management, and supplemental study groups.\u003c\/p\u003e\n\u003cp\u003eUse simulated practice questions with the books beside you. Identify the subject, select the likely reference, locate the controlling section, and confirm the answer from the text. Review missed questions to determine whether the issue involved knowledge, book selection, navigation, interpretation, calculations, or time management.\u003c\/p\u003e\n\u003cp\u003eUse the Business and Finance flash cards during shorter study sessions. Repeated review can strengthen familiarity with accounting terms, financial concepts, business responsibilities, formulas, and contractor administration.\u003c\/p\u003e\n\u003cp\u003ePractice with the highlighted and tabbed references under timed conditions. Learn to use the tabs as starting points while also reviewing surrounding provisions, definitions, exceptions, notes, and tables.\u003c\/p\u003e\n\u003cp\u003eBefore each examination appointment, separate the books approved for that session. Do not bring supplemental study references into the trade examination room. Builder’s Guide to Accounting is identified for the Business and Finance examination only.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep supports Florida Residential Contractor candidates through organized course guidance, professionally prepared reference books, simulated practice questions, business flash cards, and practical test-taking instruction.\u003c\/p\u003e\n\u003cp\u003eBook overviews help students understand the purpose and organization of the complete reference library. Trade-focused review connects Florida codes, OSHA safety requirements, construction methods, contracts, estimating, and technical subjects with the responsibilities of residential contractors.\u003c\/p\u003e\n\u003cp\u003ePractice-oriented preparation encourages students to work actively with the books instead of relying only on passive reading. Reference-navigation exercises help candidates develop a repeatable method for selecting books and locating information.\u003c\/p\u003e\n\u003cp\u003eThe premium rental package provides a structured way to prepare with both exam-room references and supplemental study materials. It is designed to build knowledge, improve navigation skills, and support confidence without guaranteeing a passing score, license approval, or specific examination outcome.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the premium rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes the complete set of listed professionally highlighted and tabbed books, business and trade courses, Business and Finance flash cards, simulated practice questions, book overviews, and test-taking guidance.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the total price?\u003c\/h2\u003e\n\u003cp\u003eThe rental package price is $1,795. A refundable $1,000 book deposit is required, making the total amount due $2,795.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhen is the $1,000 deposit refundable?\u003c\/h2\u003e\n\u003cp\u003eThe deposit is refundable when the books are returned in similar condition within six months from the date they are shipped.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books professionally highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included references are professionally highlighted and tabbed to support organized preparation and efficient navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all included books allowed into the trade examination?\u003c\/h2\u003e\n\u003cp\u003eNo. Walker’s Building Estimator’s Reference Book, Design and Control of Concrete Mixtures, Placing Reinforcing Bars, and GA-216 are included as supplemental study references but are not allowed in the trade examination room.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan Builder’s Guide to Accounting be taken into every examination?\u003c\/h2\u003e\n\u003cp\u003eNo. Builder’s Guide to Accounting is identified for the Business and Finance examination only and is not allowed in the trade examination sessions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre both business and trade courses included?\u003c\/h2\u003e\n\u003cp\u003eYes. The package includes online preparation for Business and Finance as well as Contract Administration and Project Management.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long should I allow for order processing?\u003c\/h2\u003e\n\u003cp\u003ePlease allow an additional 15 business days for professionally highlighted and tabbed trade book package orders.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this rental package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo. The package provides books, courses, flash cards, practice materials, and organized study guidance, but examination results depend on individual preparation and performance.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Book Rental Package - Self Study","offer_id":39257492422713,"sku":"39257492422713","price":2795.0,"currency_code":"USD","in_stock":true},{"title":"Book Rental Package - Self Study + Live \u0026 Recorded Classes [+$300]","offer_id":39257492455481,"sku":"39257492455481","price":3095.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/FL-RESIDENTIAL-RENTAL_dc209c5b-debe-4514-928c-810fb6a99d09.png?v=1752259177"},{"product_id":"florida-residential-contractor-contract-administration-and-project-management-online-practice-questions","title":"Florida Residential Contractor - Contract Administration and Project Management Online Practice Questions","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida Residential Contractor - Contract Administration and Project Management Online Practice Questions\u003c\/h1\u003e\n\u003cp\u003ePrepare for the Florida Residential Contractor Contract Administration and Project Management exam sections with online practice questions designed to help contractor candidates review Florida Building Code requirements, residential construction, accessibility, existing building work, energy conservation, OSHA construction safety, energy-efficient building practices, truss handling and bracing, contractor administration, contract documents, bidding procedures, subcontractor agreements, Florida regulatory topics, commercial construction practices, and project management responsibilities before test day.\u003c\/p\u003e\n\u003cp\u003eThis product includes \u003cstrong\u003eonline practice question access only for 3 months\u003c\/strong\u003e. Physical books, printed references, application services, tutoring, extended course access, and printed study materials are not included with this product unless separately stated on the purchase page.\u003c\/p\u003e\n\u003cp\u003eThe Florida Residential Contractor exam is connected to a residential contractor license classification and includes knowledge areas that go beyond field construction. Contract Administration and Project Management preparation requires a working understanding of how residential projects are bid, contracted, documented, scheduled, supervised, inspected, changed, coordinated, and closed out. Candidates should be able to move between construction codes, contract documents, safety rules, contractor business references, and project management references.\u003c\/p\u003e\n\u003cp\u003eThis online practice question product helps turn the listed Florida Residential Contractor references into active study. Instead of only reading code books, AIA documents, OSHA regulations, truss safety guidance, contractor management material, energy references, and construction references, you can work through practice questions that reinforce important exam topics and help you recognize how concepts may be presented in an exam setting.\u003c\/p\u003e\n\u003cp\u003ePractice questions are especially useful for an open book contractor exam because preparation is not only about remembering facts. It is also about knowing where information is located, how each reference is organized, and which code, manual, contract document, or standard is most useful for a specific question. This product gives you a structured way to review Florida Residential Contractor Contract Administration and Project Management topics during your 3-month access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eOnline Practice Questions:\u003c\/strong\u003e Practice questions focused on Florida Residential Contractor Contract Administration and Project Management exam preparation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003e3 Month Access Only:\u003c\/strong\u003e This product includes access to the online practice questions for 3 months.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContract Administration Review:\u003c\/strong\u003e Practice connected to AIA A201, AIA A401, AIA A701, contracts, bidding, subcontractor agreements, changes, claims, payments, documentation, and closeout.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eProject Management Review:\u003c\/strong\u003e Study support connected to scheduling, coordination, inspections, safety, site supervision, quality control, truss handling, residential construction practices, and project documentation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Code Review:\u003c\/strong\u003e Practice connected to Florida Building Code - Building, Accessibility, Residential, Existing Building, and Energy Conservation, 2023 editions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSafety and Construction Reference Review:\u003c\/strong\u003e Practice connected to OSHA 29 Part 1926, BCSI truss safety guidance, Energy Efficient Building Construction in Florida, and Principles and Practices of Commercial Construction.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eReference-Based Study Format:\u003c\/strong\u003e Questions designed to help you become more comfortable using the listed references in an open book testing environment.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor exam is connected to Florida construction contractor licensure and is administered through the approved state examination process. Candidates must follow the required examination approval, registration, and scheduling process before sitting for the exam.\u003c\/p\u003e\n\u003cp\u003eThis product focuses on \u003cstrong\u003eContract Administration and Project Management\u003c\/strong\u003e preparation. These areas evaluate the knowledge used to manage residential construction projects from bidding and contract award through construction, inspections, documentation, safety coordination, change management, and closeout.\u003c\/p\u003e\n\u003cp\u003eContract Administration topics may include instructions to bidders, bidding procedures, contract conditions, contractor and subcontractor responsibilities, changes in the work, payments, claims, contract time, warranties, insurance, bonds, termination, submittals, documentation, and project closeout. A201 General Conditions of the Contract for Construction, A401 Standard Form of Agreement between Contractor-Subcontractor, and A701 Instructions to Bidders are important references for these topics.\u003c\/p\u003e\n\u003cp\u003eProject Management topics may include project planning, scheduling, jobsite supervision, coordination of trades, quality control, inspections, safety, code compliance, accessibility, residential construction, existing building work, energy conservation, truss handling and bracing, and construction methods. Candidates should be prepared to move between code books, contractor references, OSHA safety material, and construction references.\u003c\/p\u003e\n\u003cp\u003eThe online practice question format helps candidates review exam topics in a practical way. As you answer questions, you can identify areas that need more study, revisit the correct reference, and build familiarity with the type of thinking required for an open book contractor licensing exam.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor exam is an \u003cstrong\u003eopen book test\u003c\/strong\u003e. Candidates are responsible for bringing their own approved references to the examination center and following the testing center rules for reference materials.\u003c\/p\u003e\n\u003cp\u003eBecause this is an open book examination, preparation should include reference navigation. Candidates should practice locating information in the Florida Building Code books, OSHA 29 Part 1926, Energy Efficient Building Construction in Florida, BCSI truss safety guidance, Contractors Manual, AIA contract documents, Florida Statutes Chapter 455, and Principles and Practices of Commercial Construction. Knowing the subject is helpful, but knowing where to find the answer during a timed exam is also important.\u003c\/p\u003e\n\u003cp\u003eNot every study reference is allowed into every examination section. Some books are useful for preparation but are not permitted in the trade exam room. Candidates should organize their study materials according to the current official exam reference list and pay close attention to which references are allowed for the specific exam section being taken.\u003c\/p\u003e\n\u003cp\u003ePractice questions can help build open book skills. As you answer questions, review the related topic and connect it back to the appropriate reference. Over time, this helps improve speed, confidence, and familiarity with the books, codes, standards, and contract documents used for the exam.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eFlorida construction contractor licensing is regulated through the Florida Department of Business and Professional Regulation and the Construction Industry Licensing Board. Candidates preparing for the Florida Residential Contractor exam should understand that the exam is only one part of the residential contractor licensing process.\u003c\/p\u003e\n\u003cp\u003eThe process begins with confirming that the residential contractor license is the correct classification for the work the candidate intends to perform. Residential contractor licensure is separate from general, building, specialty, and trade classifications because it is connected to a defined scope of residential construction, project supervision, code compliance, and contractor-level responsibility.\u003c\/p\u003e\n\u003cp\u003eAfter selecting the correct license classification, candidates complete the required examination registration process. Once authorized, candidates schedule the required examination sections through the approved testing process and prepare using the official reference list for each section.\u003c\/p\u003e\n\u003cp\u003ePassing the required exam sections is an important licensing step, but Florida contractor licensing also includes additional requirements outside the exam itself. Candidates may need to submit experience documentation, demonstrate financial responsibility, satisfy background-related requirements, provide insurance or workers’ compensation documentation where applicable, and complete the state application process for the license classification.\u003c\/p\u003e\n\u003cp\u003eAfter licensure, residential contractors are responsible for operating within the scope of the license, maintaining proper records, renewing the license as required, following Florida laws and rules, meeting applicable residential building code requirements, coordinating inspections, supervising construction work, and managing projects professionally. Contract Administration and Project Management preparation supports these responsibilities by reinforcing practical knowledge used throughout the construction process.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eFlorida Residential Contractor candidates must meet the requirements established for the residential contractor license classification. The Florida Residential Contractor exam is connected to the knowledge required for residential construction work under Florida construction contractor licensing.\u003c\/p\u003e\n\u003cp\u003eResidential contractors should understand contract administration, bidding, subcontract agreements, project management, scheduling, safety, accessibility, residential code requirements, existing building work, energy conservation, construction practices, truss safety, documentation, quality control, and contractor responsibility.\u003c\/p\u003e\n\u003cp\u003eThe Florida Building Code references are central to preparation because Florida residential contractors must understand how building, accessibility, residential, existing building, and energy conservation requirements affect residential construction projects. Code compliance can depend on project scope, existing conditions, accessibility requirements where applicable, energy requirements, materials, structural details, and inspection expectations.\u003c\/p\u003e\n\u003cp\u003eContract administration is also central to residential contracting. Candidates should understand how contract documents define responsibilities, procedures, payments, changes, claims, submittals, project communication, time, warranties, insurance, bonds, and closeout. AIA contract documents are listed references for this product and should be reviewed carefully.\u003c\/p\u003e\n\u003cp\u003eCandidates should use the current Florida examination and licensing materials for their license category. Requirements can vary by classification, and applicants are responsible for completing the steps required for their specific contractor license.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code - Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida building code reference used for building requirements, occupancy, construction types, fire-resistance, means of egress, structural provisions, materials, weather protection, inspections, and code compliance topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code - Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida accessibility code reference used for accessible routes, clearances, entrances, toilet rooms, parking, reach ranges, ramps, signage, and accessibility-related construction requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code - Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida residential code reference used for one- and two-family dwelling requirements, residential construction, structural provisions, fire safety, energy-related coordination, and residential building systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida code reference used for repair, alteration, change of occupancy, additions, historic buildings, existing conditions, and compliance methods for existing buildings.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida code reference used for energy conservation, building envelope requirements, insulation, fenestration, mechanical and lighting efficiency, air leakage, and energy compliance topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations, OSHA 29 Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eConstruction safety regulations used for jobsite safety topics, including fall protection, excavation, ladders, scaffolds, personal protective equipment, tools, materials, signs, signals, barricades, and safety responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEnergy Efficient Building Construction in Florida, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida energy construction reference used for energy-efficient construction practices, building envelope considerations, mechanical system relationships, air leakage, insulation, duct performance, and Florida-specific efficiency topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilding Component Safety Information: BCSI “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses”, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA truss safety reference used for handling, installing, bracing, and stabilizing metal-connected wood trusses during construction.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractors Manual, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contractor reference used for business operations, licensing responsibilities, project administration, contracts, safety, financial topics, insurance, employment issues, and regulatory compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eA201 General Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract document reference covering general conditions, project roles, contract administration, changes in the work, time, payments, protection of persons and property, insurance, bonds, correction of work, termination, and dispute resolution.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eA401 Standard Form of Agreement between Contractor-Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA subcontract agreement reference used for contractor-subcontractor responsibilities, scope, payment, changes, insurance, claims, dispute resolution, and coordination between project parties.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eA701 Instructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA bidding document reference covering bidder instructions, bidding procedures, substitutions, addenda, bid security, submission requirements, and award procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Statutes Chapter 455, Current Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eFlorida statutory material covering business and professional regulation topics relevant to licensed professionals and regulated contractor activity.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, Ronald C. Smith and Cameron K. Andres, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction reference covering construction methods, building systems, project planning, field coordination, materials, assemblies, and construction management concepts.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilders Guide to Accounting, Michael C. Thomsett, Copyright 2001\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction accounting reference used for business exam preparation. This reference is noted as allowed into the business exam only and not allowed into the trade exam.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilding Estimator’s Reference Book, Walker’s, 33rd Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested study reference for construction cost information, material quantities, labor considerations, equipment, and estimating concepts. This reference is noted as not allowed into the trade exam.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, Steven H. Kosmatka, Beatrix Kerkhoff and William C. Panarese, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested study reference for concrete materials, mixture design, placement concepts, curing, durability, and concrete quality. This reference is noted as not allowed into the trade exam.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested study reference for reinforcing steel placement, supports, spacing, bends, splices, cover, tying, and reinforcement practices. This reference is noted as not allowed into the trade exam.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested study reference for gypsum panel application, finishing levels, framing coordination, fasteners, joints, finishing materials, and installation practices. This reference is noted as not allowed into the trade exam.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code - Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed Florida building code reference for building requirements, occupancy, construction types, fire-resistance, egress, structural provisions, materials, inspections, and code compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code - Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed Florida accessibility code reference for accessibility requirements affecting buildings and facilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code - Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed Florida residential code reference for one- and two-family dwelling construction topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed Florida existing building code reference for repairs, alterations, additions, changes of occupancy, and existing building compliance.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Building Code – Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed Florida energy code reference for building envelope, insulation, air leakage, energy compliance, and efficiency requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations, OSHA 29 Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed construction safety reference for OSHA jobsite safety questions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eEnergy Efficient Building Construction in Florida, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed Florida energy construction reference for energy-efficient building practices and Florida-specific energy topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilding Component Safety Information: BCSI “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses”, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed truss safety reference for handling, installing, bracing, and stabilizing metal-connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eContractors Manual, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed contractor reference for project administration, safety, contracts, licensing, business operations, and regulatory topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eA201 General Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed contract document for questions involving general conditions, changes, payments, claims, contract time, protection of work, insurance, bonds, termination, and project responsibilities.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eA401 Standard Form of Agreement between Contractor-Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed subcontract agreement reference for contractor-subcontractor responsibilities, payments, changes, claims, insurance, and coordination topics.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eA701 Instructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed bidding reference for bidder instructions, bidding procedures, addenda, substitutions, bid security, submission requirements, and award procedures.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eFlorida Statutes Chapter 455, Current Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed statutory reference for Florida business and professional regulation topics where listed for the exam.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePrinciples and Practices of Commercial Construction, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eAllowed construction reference for construction methods, building systems, materials, assemblies, coordination, and field practices.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor Contract Administration and Project Management exam areas should be approached with a study plan that combines contract document review, project management practice, Florida residential code navigation, building code review, OSHA safety, construction methods, energy requirements, truss safety, and field coordination. Candidates should be able to move efficiently between the question, the correct reference, and the answer.\u003c\/p\u003e\n\u003cp\u003eAIA documents should be reviewed carefully for contract administration topics. A201 supports questions about project roles, contract time, payments, changes, claims, insurance, bonds, correction of work, termination, and dispute procedures. A401 supports contractor-subcontractor relationship questions. A701 supports bidding procedures, bidder responsibilities, substitutions, addenda, bid security, and award-related topics.\u003c\/p\u003e\n\u003cp\u003eThe Florida Building Code references should be reviewed for project management and code compliance. Candidates should study residential construction requirements, building requirements, accessibility where applicable, existing building work, energy conservation, inspections, materials, fire-resistance, egress, structural conditions, weather protection, and project-specific code application. Residential contractors must know how to identify which code book applies to the project condition.\u003c\/p\u003e\n\u003cp\u003eOSHA 29 Part 1926 should be reviewed for construction safety. Residential contractors often coordinate jobsite safety responsibilities across multiple trades and phases. Candidates should study fall protection, ladders, scaffolds, excavation, personal protective equipment, hazard communication, tools, materials, signs, signals, barricades, and general safety responsibilities.\u003c\/p\u003e\n\u003cp\u003ePrinciples and Practices of Commercial Construction can support field construction knowledge, building systems, materials, construction sequencing, project coordination, and construction methods. BCSI should be reviewed for safe handling, installation, and bracing of metal-connected wood trusses. Energy Efficient Building Construction in Florida should be reviewed for Florida energy practices and construction details that affect code compliance.\u003c\/p\u003e\n\u003cp\u003eSuggested study references can strengthen preparation even when they are not allowed into the trade exam room. Building Estimator’s Reference Book can support estimating concepts. Design and Control of Concrete Mixtures can support concrete knowledge. Placing Reinforcing Bars can support reinforcing steel review. GA-216 can support gypsum panel application and finishing review. Builders Guide to Accounting can support business exam preparation.\u003c\/p\u003e\n\u003cp\u003eOnline practice questions help turn contract documents, code books, construction references, safety rules, and suggested study materials into active review. As you answer questions, identify the subject being tested, review why the answer is correct, and connect the question back to the proper reference. During your 3-month access period, repeated practice can help reinforce topic recognition, reference navigation, and confidence with Florida Residential Contractor exam content.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep helps students prepare for contractor licensing exams with organized, trade-focused study tools. For the Florida Residential Contractor Contract Administration and Project Management sections, these online practice questions support review of Florida Building Code requirements, residential construction, accessibility, existing building work, energy conservation, OSHA safety, AIA contract documents, bidding procedures, subcontract agreements, contractor administration, construction practices, truss safety, and project management responsibilities.\u003c\/p\u003e\n\u003cp\u003eBecause the exam is open book, 1 Exam Prep emphasizes reference familiarity when applicable. Practice questions help you recognize whether a topic is more likely connected to an AIA document, Contractors Manual, Florida Building Code book, OSHA regulation, construction reference, energy construction reference, or truss safety guide. This helps build a stronger study structure for exam day and supports more efficient use of approved references.\u003c\/p\u003e\n\u003cp\u003e1 Exam Prep also helps students focus on realistic preparation. The practice format encourages repetition, review, and better time management. As you work through questions, you can identify weak areas, revisit difficult topics, and strengthen your understanding of contract administration and project management concepts in an exam-style setting.\u003c\/p\u003e\n\u003cp\u003eThis product does not guarantee a passing score, licensing approval, or a specific exam outcome. It provides practical preparation support for candidates who want a more organized way to study for the Florida Residential Contractor exam during their 3-month access period.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ Section\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this product for the Florida Residential Contractor exam?\u003c\/h2\u003e\n\u003cp\u003eYes. This product is designed for candidates preparing for the Florida Residential Contractor Contract Administration and Project Management sections with online practice questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long do I get access to the online practice questions?\u003c\/h2\u003e\n\u003cp\u003eYou get \u003cstrong\u003e3 months of access only\u003c\/strong\u003e to the Florida Residential Contractor online practice questions.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this product include access longer than 3 months?\u003c\/h2\u003e\n\u003cp\u003eNo. This product includes 3 months of online practice question access only.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Florida Residential Contractor exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The Florida Residential Contractor exam is open book. Candidates must bring only approved references for the specific exam section and follow the testing center rules for reference materials.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat sections does this product focus on?\u003c\/h2\u003e\n\u003cp\u003eThis product focuses on Contract Administration and Project Management preparation for the Florida Residential Contractor exam.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this product include the reference books?\u003c\/h2\u003e\n\u003cp\u003eNo. This product is for online practice questions only. Physical reference books are not included unless separately stated on the purchase page.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all listed study references allowed into the trade exam?\u003c\/h2\u003e\n\u003cp\u003eNo. Some references are listed as suggested study references or business exam references and are not allowed into the trade exam. Candidates should use the current official exam reference list for the exam section being taken.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat topics should I study for Contract Administration?\u003c\/h2\u003e\n\u003cp\u003eImportant topics include bidding, contract conditions, subcontract agreements, instructions to bidders, changes, payments, claims, insurance, bonds, contract time, termination, submittals, documentation, and project closeout.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat topics should I study for Project Management?\u003c\/h2\u003e\n\u003cp\u003eImportant topics include scheduling, coordination, supervision, safety, inspections, building code compliance, residential construction, accessibility where applicable, existing building work, energy conservation, truss safety, and field documentation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this product a full course or book package?\u003c\/h2\u003e\n\u003cp\u003eNo. This product is for online practice questions only. It does not include physical books, highlighted books, tabbed books, a full course, tutoring, or application service unless separately stated on the purchase page.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho regulates Florida construction contractor licensing?\u003c\/h2\u003e\n\u003cp\u003eFlorida construction contractor licensing is regulated through the Florida Department of Business and Professional Regulation and the Construction Industry Licensing Board.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":32904163033145,"sku":"4589429-A","price":79.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/FLORIDARESIDENTIAL-CONTRACTOR_COURSE.-TEST3png.png?v=1623277378"},{"product_id":"florida-residential-contractor-budget-friendly-book-rental-package","title":"Florida Residential Contractor - Budget Friendly Books \u0026 Courses Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eFlorida Residential Contractor - Budget Friendly Books \u0026amp; Courses Rental Package\u003c\/h1\u003e\n\u003cp\u003ePrepare for the Florida Residential Contractor examinations with a budget-friendly rental package that combines professionally highlighted and tabbed exam-room reference books, online business and trade courses, and business flash cards. This package is designed for candidates who want access to the required study resources without purchasing every examination book outright.\u003c\/p\u003e\n\u003cp\u003eThe included rental books are organized to support preparation for the Florida Residential Contractor Business and Finance, Contract Administration, and Project Management examinations. The references cover Florida building codes, workplace safety, energy-efficient construction, construction methods, contracts, bidding, accounting, business requirements, accessibility, existing buildings, residential construction, and wood-truss installation and bracing.\u003c\/p\u003e\n\u003cp\u003eEach included trade and business reference is professionally highlighted and tabbed. Highlighting draws attention to important provisions and commonly studied material, while tabs help candidates locate major chapters, subjects, tables, and code sections more efficiently. These features are especially useful during an open-book examination, where candidates must identify the correct reference and find information within the available testing time.\u003c\/p\u003e\n\u003cp\u003eThe package also includes business and trade exam-preparation courses. Course lessons provide organized study guidance, reference-book overviews, simulated practice questions, book-navigation instruction, highlighting and tabbing guidance, and practical test-taking techniques. Business flash cards are included to reinforce important business terminology, concepts, calculations, and contractor responsibilities.\u003c\/p\u003e\n\u003cp\u003eThis rental option provides a structured combination of books and online preparation for candidates working toward Florida Residential Contractor certification. Students receive access to the included books for the rental period and receive \u003cstrong\u003e6 months of course access\u003c\/strong\u003e for the included business and trade courses.\u003c\/p\u003e\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n\u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eProfessionally Highlighted and Tabbed Rental Books:\u003c\/strong\u003e The listed exam-room-approved references are prepared to support organized study and faster navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness and Trade Courses:\u003c\/strong\u003e Online preparation for the Florida Residential Contractor Business and Finance, Contract Administration, and Project Management examination areas.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBusiness Flash Cards:\u003c\/strong\u003e Study cards covering important business concepts, terminology, responsibilities, and calculation-based subjects.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eSimulated Practice Questions:\u003c\/strong\u003e Practice-oriented questions designed to reinforce subject knowledge and reference-book navigation.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBook Overviews:\u003c\/strong\u003e Guidance explaining the purpose, organization, and major subjects covered by the included references.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eHighlighting and Tabbing Guidance:\u003c\/strong\u003e Instruction that helps students understand how the prepared books are organized and how to use the markings effectively.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eTest-Taking Techniques:\u003c\/strong\u003e Strategies for analyzing questions, selecting the correct reference, managing time, and working through an open-book examination.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1845\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $650\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $2,495\u003c\/p\u003e\n\u003cp\u003eThe $650 deposit is refundable when the rental books are returned in similar condition within six months from the date they are shipped.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003cp\u003e\u003cstrong\u003eOrder Processing Notice:\u003c\/strong\u003e Please allow an additional 15 business days for professionally highlighted and tabbed trade book package orders.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor examination process includes separate Business and Finance, Contract Administration, and Project Management examination areas. This package provides business and trade preparation resources for all three areas.\u003c\/p\u003e\n\u003cp\u003eThe Business and Finance portion focuses on subjects connected with operating and financially managing a contracting business. Preparation may include contractor accounting, job costing, financial statements, estimating, payroll, taxes, insurance, contracts, business organization, and regulatory responsibilities.\u003c\/p\u003e\n\u003cp\u003eContract Administration preparation focuses on bidding procedures, contract documents, contractor-subcontractor relationships, project responsibilities, payments, changes in the work, documentation, and other administrative responsibilities involved in construction projects.\u003c\/p\u003e\n\u003cp\u003eProject Management preparation covers practical construction knowledge, including Florida building codes, residential construction requirements, accessibility, existing buildings, energy conservation, OSHA regulations, materials, construction methods, wood-truss safety, and project coordination.\u003c\/p\u003e\n\u003cp\u003eThe included courses and books are intended to help candidates organize these subjects into a manageable study plan. Simulated practice questions encourage students to identify the subject of a question, select the correct reference, locate the applicable information, and apply it to the available answer choices.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\u003cp\u003eThe Florida Residential Contractor examinations are open book. Candidates may bring approved references into the examination center when those books comply with the current testing rules and are permitted for the examination part being taken.\u003c\/p\u003e\n\u003cp\u003eThe rental books included in this package are the listed references identified for examination-room use. The books are professionally highlighted and tabbed to support faster navigation during study and testing. Candidates should become familiar with the tabs, highlighted passages, chapter organization, indexes, tables of contents, definitions, and code structures before examination day.\u003c\/p\u003e\n\u003cp\u003eOpen-book testing requires more than locating a highlighted sentence. Questions may depend on definitions, exceptions, related provisions, tables, notes, calculations, or surrounding language. Students should practice reading the complete applicable section and confirming that the information addresses the facts presented in the question.\u003c\/p\u003e\n\u003cp\u003eThe business and trade courses provide test-taking techniques for working with multiple books. These techniques include identifying keywords, separating business questions from trade questions, choosing the most likely reference, avoiding excessive time on one lookup, and returning to difficult questions after completing more manageable items.\u003c\/p\u003e\n\u003cp\u003eCandidates remain responsible for following current examination-center rules regarding books, tabs, highlighting, notes, binding, loose materials, and permitted references.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\u003cp\u003eThe licensing process begins with reviewing the current qualifications for Florida Residential Contractor certification. Candidates should understand the required examinations and the experience, education, financial, insurance, background, and application requirements that apply to their intended licensing path.\u003c\/p\u003e\n\u003cp\u003eAfter determining eligibility, candidates complete the applicable examination registration process for Business and Finance, Contract Administration, and Project Management. Each candidate is responsible for scheduling and completing the required examination parts.\u003c\/p\u003e\n\u003cp\u003ePreparation should include reviewing the applicable references, completing the business and trade course lessons, working through simulated practice questions, using the business flash cards, and practicing timed book-navigation exercises. The highlighted and tabbed rental books should be used throughout the study period so their organization becomes familiar.\u003c\/p\u003e\n\u003cp\u003eAfter passing the required examinations, the candidate must complete the applicable Florida licensure application and submit the required supporting documentation. Examination success alone does not issue a license or authorize regulated contracting work.\u003c\/p\u003e\n\u003cp\u003eThe correct application process may depend on whether the applicant seeks an individual license, plans to qualify a business, or is applying through another available licensing path. Applicants should use the current application that matches their intended status.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\u003cp\u003eFlorida Residential Contractor applicants must satisfy the requirements established for the license category. These requirements extend beyond examination preparation and may include qualifying experience or education, financial responsibility, background information, insurance, application documentation, and applicable state fees.\u003c\/p\u003e\n\u003cp\u003eThe Residential Contractor credential has a defined scope of work. Candidates should understand the construction activities authorized by the license and should not assume that passing the Residential Contractor examinations authorizes work assigned to another contractor classification or separately regulated trade.\u003c\/p\u003e\n\u003cp\u003eApplicants must receive the appropriate license before offering or performing work that requires Florida contractor certification. Course completion, possession of the books, and passing examination scores do not replace the state’s licensing review and approval process.\u003c\/p\u003e\n\u003cp\u003eLicensing applicants should maintain accurate records and follow the current application instructions. Missing or incomplete documentation can affect the processing of a licensing application.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida code reference covering building construction, structural provisions, occupancy, materials, fire and life safety, means of egress, and related requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Accessibility, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA code reference addressing accessible routes, entrances, facilities, clearances, fixtures, spaces, and other accessibility requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Residential, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe principal Florida code reference for regulated residential construction within its scope, including building, structural, safety, and system requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Existing Building, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA code volume covering repairs, alterations, additions, changes of occupancy, and other regulated work involving existing buildings.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Building Code - Energy Conservation, 2023\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida code reference addressing energy-efficiency requirements for building envelopes, mechanical systems, lighting, service water heating, and related components.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Code of Federal Regulations, OSHA 29 CFR Part 1926\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe federal construction-safety regulations covering workplace hazards, fall protection, scaffolds, excavations, electrical safety, equipment, and personal protection.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Energy Efficient Building Construction in Florida, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida-focused publication addressing energy-conscious construction practices, building-envelope performance, efficient systems, and climate-related considerations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Building Component Safety Information: BCSI “Guide to Good Practices for Handling, Installing and Bracing of Metal Connected Wood Trusses,” 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA specialized safety reference covering the handling, installation, restraint, and bracing of metal-connected wood trusses.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Principles and Practices of Commercial Construction, 11th Edition, 2024\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction reference by Ronald C. Smith and Cameron K. Andres addressing materials, methods, structural components, building systems, field practices, and project management.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Contractors Manual, 2025\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA business and contractor-administration reference covering financial management, contracts, employment responsibilities, insurance, taxation, and regulatory subjects.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: A201 General Conditions of the Contract for Construction, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract document addressing the relationships, rights, and responsibilities of the owner, contractor, and architect during a construction project.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: A401 Standard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA contract reference covering contractor-subcontractor responsibilities, performance, payment, coordination, and project obligations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: A701 Instructions to Bidders, 2018\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA bidding document addressing proposal procedures, bidder responsibilities, submission requirements, interpretations, and bidding administration.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Florida Statutes Chapter 455, Current Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA Florida statutory reference addressing professional regulation and administrative requirements applicable to regulated professions.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Builder’s Guide to Accounting, Michael C. Thomsett, Copyright 2001\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA construction-accounting reference covering financial records, job costs, statements, payroll, overhead, cash flow, and accounting practices. This book is allowed into the examination for the Business and Finance examination only.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\u003cp\u003eThe following professionally highlighted and tabbed rental books are included in this package and are identified as allowed into the examination center for the applicable examination area:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFlorida Building Code - Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Accessibility, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Residential, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Existing Building, 2023\u003c\/li\u003e\n\u003cli\u003eFlorida Building Code - Energy Conservation, 2023\u003c\/li\u003e\n\u003cli\u003eCode of Federal Regulations, OSHA 29 CFR Part 1926\u003c\/li\u003e\n\u003cli\u003eEnergy Efficient Building Construction in Florida, 11th Edition, 2024\u003c\/li\u003e\n\u003cli\u003eBuilding Component Safety Information: BCSI Guide, 2025\u003c\/li\u003e\n\u003cli\u003ePrinciples and Practices of Commercial Construction, 11th Edition, 2024\u003c\/li\u003e\n\u003cli\u003eContractors Manual, 2025\u003c\/li\u003e\n\u003cli\u003eA201 General Conditions of the Contract for Construction, 2017\u003c\/li\u003e\n\u003cli\u003eA401 Standard Form of Agreement Between Contractor and Subcontractor, 2017\u003c\/li\u003e\n\u003cli\u003eA701 Instructions to Bidders, 2018\u003c\/li\u003e\n\u003cli\u003eFlorida Statutes Chapter 455, Current Edition\u003c\/li\u003e\n\u003cli\u003eBuilder’s Guide to Accounting, Copyright 2001, for the Business and Finance examination only\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe following references are \u003cstrong\u003enot included\u003c\/strong\u003e in this rental package. They are suggested study resources and are \u003cstrong\u003enot allowed\u003c\/strong\u003e to be brought into the examination room or testing facility:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eWalker’s Building Estimator’s Reference Book, 33rd Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested estimating study resource that is not included and is not permitted in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested concrete study resource by Steven H. Kosmatka, Beatrix Kerkhoff, and William C. Panarese that is not included and is not permitted in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003ePlacing Reinforcing Bars, 10th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested reinforcing-steel study resource that is not included and is not permitted in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eApplication and Finishing of Gypsum Panel Products, GA-216, 2018 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eA suggested gypsum-panel study resource that is not included and is not permitted in the examination room.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\u003cp\u003eUse the online business and trade courses with the rental books throughout the six-month access period. Begin by reviewing the book overviews so you understand which references apply to contracts, business, safety, codes, accessibility, energy conservation, residential construction, and project management.\u003c\/p\u003e\n\u003cp\u003eComplete simulated practice questions with the books beside you. Identify the question subject, select the likely reference, locate the applicable section, and confirm the answer from the text. Review incorrect responses to determine whether the issue involved subject knowledge, book selection, navigation, interpretation, calculation, or time management.\u003c\/p\u003e\n\u003cp\u003eUse the business flash cards for shorter review sessions. Repeated flash-card practice can reinforce terminology and concepts between longer course lessons and book-navigation exercises.\u003c\/p\u003e\n\u003cp\u003ePractice under timed conditions as the examination approaches. Learn when to continue searching and when to mark a difficult question and return to it later. An organized testing routine can help prevent one difficult lookup from consuming too much examination time.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\u003cp\u003e1 Exam Prep supports candidates with an organized combination of professionally prepared rental books, online business and trade courses, simulated practice questions, business flash cards, book overviews, and test-taking guidance.\u003c\/p\u003e\n\u003cp\u003eThe highlighted and tabbed references help students build familiarity with major subjects and commonly used sections. Course lessons explain how the books connect to examination topics, while practice questions encourage active use of the references.\u003c\/p\u003e\n\u003cp\u003eTrade-focused review helps candidates connect Florida codes, OSHA safety rules, contract documents, construction methods, and project-management responsibilities. Business preparation reinforces accounting, financial, administrative, and regulatory subjects.\u003c\/p\u003e\n\u003cp\u003eThe package is designed to build knowledge, reference-navigation ability, and confidence through structured preparation. It does not guarantee a passing score, licensing approval, or a particular examination outcome.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package includes the listed professionally highlighted and tabbed rental books, business and trade courses, business flash cards, simulated practice questions, book overviews, highlighting and tabbing guidance, and test-taking techniques.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is course access?\u003c\/h2\u003e\n\u003cp\u003eThe package includes 6 months of course access.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much does the package cost?\u003c\/h2\u003e\n\u003cp\u003eThe package price is $1,895. A refundable $650 book deposit is also required, making the total amount due $2,495.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow is the book deposit refunded?\u003c\/h2\u003e\n\u003cp\u003eThe $1,000 deposit is refundable when the rental books are returned in similar condition within six months from the date they are shipped.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the rental books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. The included rental books are professionally highlighted and tabbed to support organized study and efficient reference navigation.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre all suggested study books included?\u003c\/h2\u003e\n\u003cp\u003eNo. Walker’s Building Estimator’s Reference Book, Design and Control of Concrete Mixtures, Placing Reinforcing Bars, and GA-216 are suggested study resources but are not included in the rental package.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan the four suggested study references be taken into the examination room?\u003c\/h2\u003e\n\u003cp\u003eNo. The four suggested study references identified on this page are not allowed in the examination room or testing facility.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan Builder’s Guide to Accounting be used for every examination part?\u003c\/h2\u003e\n\u003cp\u003eNo. Builder’s Guide to Accounting is identified as allowed for the Business and Finance examination only.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does a highlighted and tabbed package take to process?\u003c\/h2\u003e\n\u003cp\u003ePlease allow an additional 15 business days for highlighted and tabbed trade book package orders.\u003c\/p\u003e\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee that I will pass?\u003c\/h2\u003e\n\u003cp\u003eNo. The package provides books, courses, flash cards, practice materials, and study guidance, but examination results depend on each candidate’s preparation and performance.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Book Rental Package - Self Study","offer_id":39298982838329,"sku":"39298982838329","price":2495.0,"currency_code":"USD","in_stock":true},{"title":"Book Rental Package - Self Study + Live \u0026 Recorded Classes [+$300]","offer_id":39298982871097,"sku":"39298982871097","price":2795.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/processed_1.png?v=1625670710"},{"product_id":"2-hour-private-tutoring-spanish","title":"Tutoría Privada de 2 Horas - Español \/ 2 Hours Private Tutoring - Spanish","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eTUTORÍA PRIVADA DE 2 HORAS - ESPAÑOL \/ 2 HOURS PRIVATE TUTORING - SPANISH\u003c\/h1\u003e\n\u003cp style=\"text-align:center;\"\u003eLa Tutoría Privada de 2 Horas - Español de 1 Exam Prep ofrece instrucción personalizada en el idioma español para estudiantes que se preparan para los exámenes de licencia de contratista en Florida y otros estados. Este programa individualizado cubre temas de finanzas comerciales, administración de proyectos, códigos de construcción y leyes de contratación según los requisitos del Department of Business and Professional Regulation (DBPR). Impartida por instructores bilingües, la sesión permite aclarar dudas específicas sobre libros de referencia, estrategias de examen y procedimientos de licencia, brindando apoyo directo para candidatos hispanohablantes que buscan la certificación de contratista estatal.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003ciframe src=\"https:\/\/www.youtube.com\/embed\/rKt_tZO7nYQ\" height=\"315\" width=\"560\"\u003e\u003c\/iframe\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp style=\"text-align: center;\"\u003e\u003cstrong\u003e\u003cspan style=\"color: #fa0909;\"\u003e \u003c\/span\u003e\u003c\/strong\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003ch2\u003e\n\u003cstrong\u003e\u003c\/strong\u003e\u003cbr\u003e\n\u003c\/h2\u003e\n\u003ch2\u003e\u003cstrong\u003eTutoría Privada de 2 Horas - Español\u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eLas sesiones privadas de tutoría 1 a 1 se llevan a cabo a través de Zoom y tienen una duración mínima de 2 horas. Puede asistir a la sesión de tutoría a través de su teléfono o computadora que esté equipada con una cámara y un micrófono.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cbr\u003e\u003cbr\u003eDespués de su compra, el instructor se comunicará con usted para programar su sesión. \u003c\/span\u003e\u003cspan lang=\"es\" class=\"Y2IQFc\"\u003e \u003c\/span\u003e\u003cspan\u003eSi tiene preguntas, llamenos al 954-210-3030.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cbr\u003e\u003cbr\u003e\u003c\/span\u003e\u003cspan\u003e\u003cspan style=\"color: #404040;\"\u003e\u003c\/span\u003e\u003c\/span\u003e\u003cspan\u003e\u003cspan style=\"color: #404040;\"\u003e*El pago debe recibirse antes de programar la tutoría para poder reservar su horario. Por favor, comprenda que los horarios de las citas de tutoría son limitados. Si debe cancelar o reprogramar su cita, solicitamos respetuosamente un aviso de 48 horas. Las citas perdidas o canceladas por el estudiante sin previo aviso de 48 horas no son reembolsables.*\u003c\/span\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003cp style=\"text-align: center;\"\u003e \u003c\/p\u003e\n\u003ch2\u003e\u003cstrong\u003e2 Hour Private Tutoring - Spanish \u003c\/strong\u003e\u003c\/h2\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003ePrivate 1-on-1 tutoring sessions are held via Zoom and are for a minimum of 2 hours. You can attend the tutoring session via your phone or computer that is equipped with a camera a microphone. \u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eAfter your purchase, t\u003c\/span\u003e\u003cspan\u003ehe instructor will reach out to you to schedule your session. \u003c\/span\u003e\u003cspan\u003eFor questions, please call 954-210-3030.\u003c\/span\u003e \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: #404040;\"\u003e*Payment must be received prior to scheduling tutoring in order to reserve your time slot. Please understand that tutoring appointment times are limited. If you must cancel or reschedule your appointment, we respectfully request 48 hours notice. Missed appointments or appointments cancelled by the student without 48 hours notice are nonrefundable.*\u003c\/span\u003e\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Florida Business and Finance Tutoring (Construction Contractors)","offer_id":41336353914937,"sku":"Tutoring-SP-BF","price":250.0,"currency_code":"USD","in_stock":true},{"title":"Florida Electrical Business (Electrical Contractors)","offer_id":44805364547641,"sku":"Tutoring-SP-EB","price":250.0,"currency_code":"USD","in_stock":true},{"title":"Florida General Contractor Tutoring","offer_id":41336353947705,"sku":"Tutoring-SP-GC","price":250.0,"currency_code":"USD","in_stock":true},{"title":"Florida Building Contractor Tutoring","offer_id":41336369872953,"sku":"Tutoring-SP-BC","price":250.0,"currency_code":"USD","in_stock":true},{"title":"Florida Residential Contractor Tutoring","offer_id":41336369905721,"sku":"Tutoring-SP-RC","price":250.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/tut_ed421bcc-0822-4a00-8876-63fec12710e0.png?v=1690234011"},{"product_id":"2023-florida-building-code-building-8th-edition","title":"2023 Florida Building Code - Building, 8th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003e2023 FLORIDA BUILDING CODE - BUILDING, 8TH EDITION\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe 2023 Florida Building Code – Building, 8th Edition, published by the Florida Building Commission and utilized by the Florida Department of Business and Professional Regulation (DBPR), establishes uniform construction standards for the state’s commercial and residential structures. This edition aligns with the International Building Code (IBC) and includes updates to structural loads, fire safety, and energy efficiency requirements. It is an essential reference for candidates preparing for the Florida Building Contractor, General Contractor, and Residential Contractor license exams administered by the CILB and offered through test vendors such as Pearson VUE and Prometric. Available through 1 Exam Prep, this code volume is part of the mandatory reference library for Florida contractor license exam preparation and continuing education courses covering building construction, code compliance, and contractor certification.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eFlorida Building Code - Building 8th Edition (2023)\u003c\/strong\u003e is a fully integrated, Florida-specific building code based on the 2021 International Building Code.\u003cbr\u003e\u003cbr\u003eLooseleaf. Includes chapter tabs and custom binder.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003eEffective December 31 2023.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eEffective July 1, 2024 for Florida State contractor license exams.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eISBN: \u003cspan data-mce-fragment=\"1\"\u003e9781960701107\u003c\/span\u003e\u003c\/p\u003e","brand":"ICC","offers":[{"title":"Default Title","offer_id":42565618335801,"sku":"9781960701107","price":228.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/2023FloridaBuildingCode-Building_8thEdition.jpg?v=1710982639"},{"product_id":"2023-florida-building-code-accessibility-8th-edition","title":"2023 Florida Building Code - Accessibility, 8th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003e2023 Florida Building Code - Accessibility, 8th Edition\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe \u003cem\u003e2023 Florida Building Code - Accessibility, 8th Edition\u003c\/em\u003e, published by the Florida Building Commission under the Florida Department of Business and Professional Regulation (DBPR), provides the legally required standards for accessible design and construction throughout the state. This volume aligns with the 2017 American National Standards Institute (ANSI A117.1) for accessibility and the U.S. Department of Justice ADA Standards for Accessible Design, ensuring statewide compliance for public, commercial, and residential facilities. As part of the reference materials approved by the CILB and utilized in Florida contractor, building inspector, and architecture licensing exams, this code is a required text for candidates preparing through One Exam Prep’s contractor license courses and Florida Building Contractor exam modules. It covers essential criteria including accessible routes, restrooms, signage, and building egress in accordance with federal and state statutes governing accessibility in the built environment.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cspan itemprop=\"description\"\u003e\u003cstrong\u003eFlorida Building Code - Accessibility 8th Edition (2023)\u003c\/strong\u003e\u003cspan\u003e \u003c\/span\u003eis based on the 2010 ADA Standards for Accessible Design and establishes standards for accessibility to places of public accommodation and commercial facilities by individuals with disabilities.\u003c\/span\u003e\u003cspan style=\"font-size: 0.875rem;\"\u003e \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003eLooseleaf. Includes chapter tabs and custom binder.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eEffective December 31 2023.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eEffective July 1, 2024 for the following Florida State contractor license exams:\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eFlorida General Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Building Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Residential Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Marine Contractor\u003c\/li\u003e\n\u003cli\u003eFlorida Plumbing Contractor\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eISBN: 9781960701244\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan style=\"color: #b3b3b3;\"\u003ePlease note that the inside first page of the Florida Building Code - Accessibility 8th Edition (2023) indicates it is the 2012 Florida Accessibility Code.  If you turn the page over it will show that it is the 8th Edition (2023), First Printing: July 2023. This is how you can determine if you have the 2023 printing of the book. In addition, the last two digits of the Item No. on the bottom right-hand corner of the first page indicates the year (23). \u003c\/span\u003e\u003c\/p\u003e","brand":"ICC","offers":[{"title":"Default Title","offer_id":42565646680121,"sku":"9781960701244","price":83.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/2023FloridaBuildingCode-Accessibility_8thEdition.jpg?v=1710982921"},{"product_id":"2023-florida-building-code-energy-conservation-8th-edition","title":"2023 Florida Building Code - Energy Conservation, 8th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003e2023 FLORIDA BUILDING CODE - ENERGY CONSERVATION, 8TH EDITION\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe 2023 Florida Building Code – Energy Conservation, 8th Edition, published under the authority of the Florida Building Commission and aligned with the International Code Council (ICC), serves as a mandatory reference for state contractor licensing and building compliance examinations administered by the Florida Department of Business and Professional Regulation (DBPR). This edition outlines minimum energy-efficiency standards for residential, commercial, and public structures, integrating requirements from the Florida Building Code – Building, Mechanical, Plumbing, and Electrical volumes. It is used in One Exam Prep’s contractor education and test preparation programs for builders, HVAC professionals, and general contractors pursuing state certification or county licensure in energy compliance, mechanical systems, and sustainable construction practices across Florida.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eFlorida Building Code - Energy Conservation 8th Edition (2023)\u003c\/strong\u003e is a fully integrated Florida-specific building code based on the 2021 International Energy Conservation Code.\u003cbr\u003e\u003cbr\u003eLooseleaf. Includes chapter tabs and custom binder.\u003cbr\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eEffective December 31 2023.\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eEffective July 1, 2024 for Florida State contractor license exams.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eISBN: 9781960701251\u003c\/span\u003e\u003c\/p\u003e","brand":"ICC","offers":[{"title":"Default Title","offer_id":42565661818937,"sku":"9781960701251","price":69.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/2023FloridaBuildingCode-EnergyConservation_8thEdition.jpg?v=1710983433"},{"product_id":"2023-florida-building-code-existing-building-8th-edition","title":"2023 Florida Building Code - Existing Building, 8th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003e2023 FLORIDA BUILDING CODE - EXISTING BUILDING, 8TH EDITION\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe 2023 Florida Building Code – Existing Building, 8th Edition, published by the Florida Building Commission under the authority of the Florida Department of Business and Professional Regulation (DBPR), is an official reference manual required for state construction and contractor license exams supported by 1 Exam Prep. This edition governs repair, alteration, and change of occupancy regulations for existing structures in Florida and aligns with the Florida Building Code family, including Building, Residential, and Energy Conservation volumes. It is a mandatory component for General Contractor, Building Contractor, and Residential Contractor license exams administered through Pearson VUE for the Construction Industry Licensing Board (CILB). The text integrates the latest amendments addressing structural retrofits, safety upgrades, and compliance standards, ensuring uniformity with Florida Statutes Chapter 553 for construction regulation and contractor certification requirements.\u003c\/p\u003e\u003cbr\u003e\n\u003cp\u003e\u003cstrong\u003eFlorida Building Code - Existing Building 8th Edition (2023)\u003c\/strong\u003e is a fully integrated Florida-specific building code based on the 2021 International Existing Building Code. Includes Florida Building Code Administrative Chapter 1.\u003cbr\u003e\u003cbr\u003eLooseleaf. Includes chapter tabs and custom binder.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003eEffective December 31 2023.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eEffective July 1, 2024 for Florida State contractor license exams.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003eISBN: 9781960701220\u003c\/span\u003e\u003c\/p\u003e","brand":"ICC","offers":[{"title":"Default Title","offer_id":42565688098873,"sku":"9781960701220","price":127.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/2023FloridaBuildingCode-ExistingBuilding_8thEdition.jpg?v=1710983828"},{"product_id":"2023-florida-building-code-residential-8th-edition","title":"2023 Florida Building Code - Residential, 8th Edition","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003e2023 FLORIDA BUILDING CODE - RESIDENTIAL, 8TH EDITION\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe 2023 Florida Building Code – Residential, 8th Edition, published by the Florida Building Commission under the authority of the Florida Department of Business and Professional Regulation (DBPR), serves as the foundational text for the Florida Residential Contractor Exam and related trade licensing tests administered by the CILB. This code defines the minimum standards for residential construction statewide, aligning with national ICC standards and Florida-specific amendments addressing wind resistance, structural loads, and energy efficiency. Required by 1 Exam Prep for contractor exam preparation, the publication provides essential reference material for builders, inspectors, and licensed contractors seeking compliance with residential building regulations within Florida’s construction licensing framework.\u003c\/p\u003e\u003cbr\u003e\n\u003cdiv class=\"data item content bullet-description\" id=\"product.info.description\" data-role=\"content\" aria-labelledby=\"tab-label-product.info.description\" role=\"tabpanel\" aria-hidden=\"false\"\u003e\n\u003cdiv class=\"product attribute description\"\u003e\n\u003cdiv class=\"bullet-description value\" id=\"\"\u003e\n\u003cp\u003e\u003cstrong\u003eFlorida Building Code - Residential 8th Edition (2023)\u003c\/strong\u003e is a fully integrated code based on the 2021 International Residential Code for One-Two-Family Dwellings.\u003cbr\u003e\u003cbr\u003eLooseleaf. Includes chapter tabs and custom binder.\u003cbr\u003e\u003cbr\u003eEffective December 31 2023.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003eEffective July 1, 2024 for Florida State contractor license exams.\u003c\/p\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003c\/div\u003e\n\u003cdiv class=\"data item title\" aria-labeledby=\"tab-label-additional-title\" data-role=\"collapsible\" id=\"tab-label-additional\" role=\"tab\" data-collapsible=\"true\" aria-controls=\"additional\" aria-selected=\"false\" aria-expanded=\"false\" tabindex=\"0\"\u003eISBN: \u003cspan data-mce-fragment=\"1\"\u003e9781960701206\u003c\/span\u003e\n\u003c\/div\u003e","brand":"ICC","offers":[{"title":"Default Title","offer_id":42565737611321,"sku":"9781960701206","price":227.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/2023FloridaBuildingCode-Residential_8thEdition.jpg?v=1710984774"},{"product_id":"florida-residential-contractor-exam-complete-book-set-test","title":"Florida Residential Contractor Exam Complete Book Set","description":"\u003ch1 style=\"text-align:center; color:#000;\"\u003eFLORIDA RESIDENTIAL CONTRACTOR EXAM COMPLETE BOOK SET\u003c\/h1\u003e\u003cp style=\"text-align:center;\"\u003eThe Florida Residential Contractor Exam Complete Book Set from 1 Exam Prep provides the full collection of state-required references approved by the Florida Construction Industry Licensing Board (CILB) for candidates pursuing the Florida Residential Contractor License. This set covers all trade, building code, and business topics needed for the Residential Contractor Exam, including the Florida Building Code—Residential, Florida Building Code—Energy Conservation, and Builder's Guide to Estimating. It supports preparation for both the trade knowledge and the Business \u0026amp; Finance sections of the test administered by the Bureau of Education and Testing (DBPR). Developed for compliance with Florida Statute 489 and the Florida Contractors Licensing Law, the package aligns with current NASCLA and state exam standards to help ensure readiness for the residential construction scope, including one- and two-family dwellings and townhouses up to two stories. Each title in the collection is the latest CILB-approved edition required for testing eligibility.\u003c\/p\u003e\u003cbr\u003e\n\n  \u003clink rel=\"stylesheet\" href=\"https:\/\/cdnjs.cloudflare.com\/ajax\/libs\/font-awesome\/5.15.4\/css\/all.min.css\"\u003e\n  \u003clink href=\"https:\/\/fonts.googleapis.com\/css2?family=Poppins:wght@300;400;500;600;700\u0026amp;display=swap\" rel=\"stylesheet\"\u003e\n\n\u003cstyle\u003e\n   body { font-family: 'Poppins'; line-height: 1.6; }\n   li { color: #000; }\n   .faq-container-product { max-width: 1040px; width: 100%; margin: 50px auto; padding: 20px; }\n   .faq-container-product h2 { text-align: left; margin-bottom: 0px; color: #000; }\n   .faq-item-product { margin-bottom: 15px; }\n   .florida-tabs-res { background-color: #fff; padding: 0px; max-width: 800px; margin: 20px auto; border-radius: 10px; }\n   .h2-res { font-size: 20px; font-weight: bold; color: #000; }\n   .p-res { font-size: 16px; font-weight: normal; color: #000; }\n   .ul-res { padding-left: 20px; margin-block-start: 0em; color: #000; }\n   .li-res { font-size: 16px; list-style-type: none; color: #000; }\n   .li-res::before { content: \"-\"; padding-right: 10px; font-weight: bold; }\n   .florida-tabs-links-res { margin-top: 20px; }\n   .florida-tabs-links-res a { font-size: 14px; font-weight: bold; color: #2e2ef6; text-decoration: none; margin-right: 20px; }\n   .florida-tabs-links-res a:hover { text-decoration: underline; }\n   .faq-question-product { background: #fff; color: #000; padding: 15px; border: none; text-align: left; font-weight: 700; width: 100%; cursor: pointer; font-size: 16px; outline: none; display: flex; align-items: center; justify-content: flex-start; transition: background-color 0.3s ease; }\n   .faq-question-product:hover { box-shadow: 0px 4px 6px 2px #c5c5c5; }\n   .faq-answer-product { max-height: 0; overflow: hidden; padding-left: 20px; padding-right: 20px; background-color: #fff; transition: max-height 0.3s ease; font-size: 15px; text-align: left; }\n   .faq-answer-product p { padding: 0; margin: 0; color: #000; }\n   .faq-question-product.active .arrow-product { transform: rotate(180deg); }\n   .faq-question-product .arrow-product { margin-left: auto; transition: transform 0.3s ease; }\n   .note-tag { font-style: italic; color: #555; font-size: 13px; }\n   .add-to-cart-link { font-size: 13px; font-weight: 600; color: #2e2ef6; text-decoration: none; margin-left: 8px; }\n   .add-to-cart-link:hover { text-decoration: underline; }\n\u003c\/style\u003e\n\n\u003cdiv class=\"product-description rte\" itemprop=\"description\" style=\"background-color: #F8F8F8;\"\u003e\n  \u003cdiv class=\"faq-container-product\"\u003e\n    \u003ch2\u003eProduct Description\u003c\/h2\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Required Books\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cul\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eAIA - A201\u003c\/strong\u003e - General Conditions of the Contract for Construction, 2017\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/190063149082:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eAIA - A401\u003c\/strong\u003e - Standard Form of Agreement between Contractor-Subcontractor, 2017\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/190068785178:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eAIA - A701\u003c\/strong\u003e - Instructions to Bidders, 2018\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/1960862384185:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eFlorida Statutes Chapter 455\u003c\/strong\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7779064021049:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eContractor's Manual\u003c\/strong\u003e, 2025\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/10009383501:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eBuilder's Guide to Accounting\u003c\/strong\u003e\n            \u003cspan class=\"note-tag\"\u003e(Allowed in Business exam only — not permitted in Trade exam)\u003c\/span\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/138319921178:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eCode of Federal Regulations, Title 29 Part 1926 (OSHA 1926)\u003c\/strong\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/2057826992185:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003ePrinciples and Practices of Commercial Construction\u003c\/strong\u003e, Ronald C. Smith and Cameron K. Andres, 11th Edition, 2024\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7760402677817:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eEnergy Efficient Building Construction in Florida\u003c\/strong\u003e, 11th Edition, 2024\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/297435004954:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eBuilding Component Safety Information (BCSI)\u003c\/strong\u003e: Guide to Good Practices for Handling, Installing and Bracing of Metal Plate Connected Wood Trusses, 2025\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/1993045737529:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eFlorida Building Code - Building\u003c\/strong\u003e, 2023\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7278207926329:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eFlorida Building Code - Accessibility\u003c\/strong\u003e, 2023\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7278214283321:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eFlorida Building Code - Residential\u003c\/strong\u003e, 2023\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7278214283321:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eFlorida Building Code - Existing Building\u003c\/strong\u003e, 2023\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7278211989561:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eFlorida Building Code - Energy Conservation\u003c\/strong\u003e, 2023\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/7278210154553:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eApplication and Finishing of Gypsum Panel Products\u003c\/strong\u003e, GA-216, 2018 Edition\n            \u003cspan class=\"note-tag\"\u003e(Suggested study reference — not permitted in Trade exam)\u003c\/span\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/1959525515321:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eDesign and Control of Concrete Mixtures\u003c\/strong\u003e, Steven H. Kosmatka, Beatrix Kerkhoff and William C. Panarese, 17th Edition\n            \u003cspan class=\"note-tag\"\u003e(Suggested study reference — not permitted in Trade exam)\u003c\/span\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/9171577997:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003ePlacing Reinforcing Bars\u003c\/strong\u003e, 10th Edition\n            \u003cspan class=\"note-tag\"\u003e(Suggested study reference — not permitted in Trade exam)\u003c\/span\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/9116341965:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cli\u003e\n            \u003cstrong\u003eWalker's Building Estimator's Reference Book\u003c\/strong\u003e, 33rd Edition\n            \u003cspan class=\"note-tag\"\u003e(Suggested study reference — not permitted in Trade exam)\u003c\/span\u003e\n            \u003ca class=\"add-to-cart-link\" href=\"https:\/\/1examprep.com\/cart\/190084218906:1\" target=\"_blank\"\u003eAdd To Cart\u003c\/a\u003e\n          \u003c\/li\u003e\n          \u003cbr\u003e\n        \u003c\/ul\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        State Requirements\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cdiv class=\"florida-tabs-res\"\u003e\n          \u003ch2 class=\"h2-res\"\u003eFlorida\u003c\/h2\u003e\n          \u003cp class=\"p-res\"\u003eTo become a licensed contractor in Florida, you are required to:\u003c\/p\u003e\n          \u003cul class=\"ul-res\"\u003e\n            \u003cli class=\"li-res\"\u003ePass a state certification examination (Florida Business \u0026amp; Finance and Trade Knowledge exams).\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eBe at least 18 years old.\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eProve that you are financially stable. (credit score of 660 or higher; otherwise, you must obtain a licensing bond).\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003ePresent evidence of liability and workers' compensation insurance.\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eDemonstrate good moral character.\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eNOT have any outstanding debts owed to the state (related to construction).\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eComply with IRS rules by providing your federal employer identification number or social security number (if you are an individual).\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eFulfill the experience\/education requirements (as applicable).\u003c\/li\u003e\n            \u003cli class=\"li-res\"\u003eSubmit an electronic fingerprint.\u003c\/li\u003e\n          \u003c\/ul\u003e\n          \u003cdiv class=\"florida-tabs-links-res\"\u003e\n            \u003ca href=\"#\"\u003eClick Here to Get Insured.\u003c\/a\u003e\n            \u003ca href=\"#\"\u003eTalk to a Licensing Expert\u003c\/a\u003e\n            \u003ca href=\"#\"\u003eApplication Assistance Package\u003c\/a\u003e\n          \u003c\/div\u003e\n          \u003cbr\u003e\n        \u003c\/div\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Scope of Work\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cp\u003eResidential Contractor means a contractor whose services are limited to construction, remodeling, repair, or improvement of one-family, two-family, or three-family residences not exceeding two habitable stories above no more than one uninhabitable story and accessory use structures in connection therewith.\u003c\/p\u003e\n        \u003cbr\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Applications\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cp\u003eApplications for the Florida Residential Contractor License must be submitted to the Florida Department of Business and Professional Regulation. For application instructions and assistance, call 850-487-1395. The application process includes proof of financial stability, insurance coverage details, and electronic fingerprinting among other requirements.\u003c\/p\u003e\n        \u003cbr\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Reciprocity\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cp\u003eFlorida has a limited form of reciprocity with other states. If you have passed the NASCLA Accredited Examination for Commercial General Building Contractors, you may be exempt from the Florida Trade Knowledge exam. You are still required to pass the Florida Business and Finance exam and fulfill other specific state requirements.\u003c\/p\u003e\n        \u003cbr\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Continuing Education\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cp\u003eFlorida requires all licensed contractors to complete 14 hours of continuing education during each biennial renewal period. This education must include 1 hour on workplace safety, 1 hour on workers' compensation, 1 hour on business practices, 1 hour on laws and rules, 1 hour on wind mitigation, and the remaining hours on general subjects.\u003c\/p\u003e\n        \u003cbr\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Exam\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cp\u003eTo obtain a Florida Residential Contractor license, you must pass two exams: the Florida Business and Finance exam and the Trade Knowledge exam. These exams cover topics such as financial management, contract administration, project management, safety, building codes, and specialty contracting practices. The exams are administered by Professional Testing, Inc. (PTI).\u003c\/p\u003e\n        \u003cbr\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n\n    \u003cdiv class=\"faq-item-product\"\u003e\n      \u003cbutton class=\"faq-question-product\"\u003e\n        Training\n        \u003cspan class=\"arrow-product\"\u003e\u003ci class=\"fas fa-chevron-down icon\" style=\"color: #000000;\"\u003e\u003c\/i\u003e\u003c\/span\u003e\n      \u003c\/button\u003e\n      \u003cdiv class=\"faq-answer-product\"\u003e\n        \u003cp\u003eTraining for the Florida Residential Contractor exam is available through various providers, offering courses that include both Business and Finance and Trade Knowledge preparation. These courses are designed to help applicants pass their exams on the first attempt by providing them with the necessary knowledge and test-taking strategies.\u003c\/p\u003e\n        \u003cbr\u003e\n      \u003c\/div\u003e\n    \u003c\/div\u003e\n  \u003c\/div\u003e\n\n  \u003cscript\u003e\n    const questions = document.querySelectorAll('.faq-question-product');\n    questions.forEach(question =\u003e {\n      question.addEventListener('click', () =\u003e {\n        question.classList.toggle('active');\n        const answer = question.nextElementSibling;\n        if (question.classList.contains('active')) {\n          answer.style.maxHeight = answer.scrollHeight + 'px';\n        } else {\n          answer.style.maxHeight = 0;\n        }\n      });\n    });\n  \u003c\/script\u003e\n\u003c\/div\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":43821688586297,"sku":"1EXAM-SETFLIRC","price":1445.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/FLORIDA_RESIDENTIAL-CONTRACTOR_BOOK.png?v=1622672523"},{"product_id":"florida-statutes-chapter-455","title":"Florida Statutes Chapter 455, 2025","description":"\u003ch1 style=\"text-align: center; color: #000;\"\u003eFLORIDA STATUTES CHAPTER 455, 2025\u003c\/h1\u003e\n\u003cp style=\"text-align: center;\"\u003eThe Florida Statutes Chapter 455, 2025 Edition, available from 1 Exam Prep, contains the general provisions regulating business and professional licensing under the Florida Department of Business and Professional Regulation (DBPR). This statute outlines procedures for licensure, disciplinary actions, continuing education, and enforcement for all professional boards operating under the DBPR. It is a required reference for contractor business and finance examination administered by Pearson Vue and is essential for understanding compliance responsibilities, license maintenance, and ethical standards for Florida’s regulated trades and professions.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003eThis reference is required for Florida State Business and Finance Exams \u003cstrong\u003eJanuary\u003c\/strong\u003e \u003cstrong\u003e2026 - December 2026\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003cp\u003e.\u003c\/p\u003e","brand":"brown-1exam","offers":[{"title":"Default Title","offer_id":44085673001017,"sku":"FS455-24","price":29.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/general_0_1c2f8e97-37ef-40dc-883c-8273b80bc0da.jpg?v=1704222366"},{"product_id":"florida-contractors-manual-2025-pre-printed-tabs-construction-contractors","title":"Florida Contractors Manual, 2025; Pre-Printed Tabs (Construction Contractors)","description":"\u003ch1 style=\"text-align: center; color: #000;\"\u003eFLORIDA CONTRACTORS MANUAL, 2025; PRE-PRINTED TABS (CONSTRUCTION CONTRACTORS)\u003c\/h1\u003e\n\u003cp style=\"text-align: center;\"\u003eThe Florida Contractors Manual, 2025 Pre-Printed Tabs by 1 Exam Prep are designed to assist candidates preparing for Florida Construction Industry Licensing Board (CILB) contractor licensing exams. These durable, color-coded adhesive tabs correspond to key sections of the 2025 Florida Contractors Manual, the official reference for all state construction contractor examinations. Each tab is pre-labeled to identify important topics such as business organization, financial management, lien law, workers’ compensation, safety regulations, and contract administration. The tabs are approved for use during open-book portions of the CILB exams and help examinees quickly locate critical information within the manual. Created for construction contractors pursuing state certification or registration, these pre-printed tabs improve exam-day efficiency and compliance with Florida DBPR testing requirements.\u003c\/p\u003e\n\u003cp\u003e\u003cbr\u003e\u003cstrong\u003e\u003cspan style=\"color: #000000;\"\u003e2025 Florida Contractors Manual Pre Printed Tabs for Construction Contractors\u003c\/span\u003e \u003cspan style=\"color: #000000;\"\u003e(tabs only, highlights \u003cspan style=\"text-decoration: underline;\"\u003enot\u003c\/span\u003e included).\u003c\/span\u003e\u003c\/strong\u003e\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45366071820345,"sku":"39310057898041","price":29.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/products\/FullSizeRender_32_79795803-5d8b-408f-99fa-7faf829063e4.jpg?v=1624645680"}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/collections\/FLORIDA__RESIDENTIAL-CONTRACTOR__BOOK.png?v=1669763870","url":"https:\/\/1examprep.com\/collections\/florida-state-residential-contractor.oembed?page=2","provider":"1 Exam Prep","version":"1.0","type":"link"}