{"product_id":"new-mexico-earthmoving-excavation-and-ditching-contractor-gs-8-ultimate-exam-prep-rental-package","title":"New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) Ultimate Exam Prep Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNew Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) Ultimate Exam Prep Rental Package\u003c\/h1\u003e\n\n\u003cp\u003eThe New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) Ultimate Exam Prep Rental Package is designed for candidates preparing for the New Mexico GS-8 Earthmoving, Excavation and Ditching Contractor exam who want a complete preparation option that combines the listed reference books, online course access, and application support in one package. This package is built around the provided exam references: \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e, \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e, and \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e. The package also includes the provided business books note: \u003cstrong\u003eBusiness books included: Includes lines 2-4\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eEarthmoving, excavation, and ditching work requires a practical understanding of trenching, soil conditions, equipment use, excavation safety, shoring awareness, backfill, compaction, drainage, grading, pipe coordination, site preparation, and construction code requirements. Candidates preparing for the GS-8 exam should be ready to study both field construction practices and safety-based requirements. Because this is an open-book contractor exam, preparation should include learning the subject matter and practicing how to locate answers efficiently in the listed references.\u003c\/p\u003e\n\n\u003cp\u003eThis Ultimate Exam Prep Rental Package is built for candidates who want structured support while preparing for the exam. It includes the listed reference books, \u003cstrong\u003e1 year of course access\u003c\/strong\u003e, and \u003cstrong\u003eApplication Service\u003c\/strong\u003e. The rental package format helps candidates access the listed exam references during the preparation period, while the online course provides an organized way to review core exam topics and practice using the books as exam tools.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1335\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eRefundable Deposit:\u003c\/strong\u003e $300\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eTotal Due Today:\u003c\/strong\u003e $1635\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eBusiness books included:\u003c\/strong\u003e Includes lines 2-4\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePlease allow up to 15 business days for ultimate book package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n  \u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n  \u003cul\u003e\n    \u003cli\u003e\n\u003cstrong\u003eIncluded Book(s):\u003c\/strong\u003e Code of Federal Regulations - 29 CFR Part 1926 (OSHA); Pipe and Excavation Contracting; International Building Code, 2021.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eBusiness Books Included:\u003c\/strong\u003e Includes lines 2-4.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 1 year of course access.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eApplication Service:\u003c\/strong\u003e Included with this package.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1335.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eRefundable Deposit:\u003c\/strong\u003e $300.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eTotal Due Today:\u003c\/strong\u003e $1635.\u003c\/li\u003e\n  \u003c\/ul\u003e\n\u003c\/div\u003e\n\n\u003cp\u003eThe GS-8 reference set supports preparation for the major areas connected to excavation, earthmoving, and ditching work. \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports construction safety preparation, including excavation safety, trench protection, hazard recognition, protective equipment, equipment awareness, ladders, access, fall protection, and general jobsite safety. \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports study of excavation, trenching, pipe installation, backfill, soil-related field conditions, underground construction practices, and practical sitework procedures. \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e supports code organization, building site considerations, structural and foundation-related awareness, and construction requirements that may connect to excavation work.\u003c\/p\u003e\n\n\u003cp\u003eFor many candidates, the challenge is not only understanding excavation work in the field. It is learning how to use the safety, trade, and code references quickly and accurately during a timed open-book exam. A question may involve OSHA trench safety, excavation hazards, soil conditions, equipment, pipe installation, backfill, site drainage, grading, building code organization, foundation-related construction, or practical field procedures. This Ultimate Exam Prep Rental Package supports that preparation by pairing the listed references with \u003cstrong\u003e1 year of course access\u003c\/strong\u003e and \u003cstrong\u003eApplication Service\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) exam is intended for candidates preparing for contractor work involving excavation, ditching, earthmoving, trenching, grading, site preparation, pipe coordination, and related construction activity. The exam is built around trade knowledge, safety awareness, code awareness, reference use, and the ability to apply reference material to contractor exam questions.\u003c\/p\u003e\n\n\u003cp\u003ePreparation should include review of OSHA safety, trenching, excavation hazards, soil conditions, protective systems, access and egress, equipment operation awareness, grading, drainage, pipe installation, backfill, compaction, underground construction, site coordination, IBC organization, and construction requirements that may relate to excavation work. Candidates should also practice identifying which reference applies to a question before searching for the answer.\u003c\/p\u003e\n\n\u003cp\u003eBecause this is a trade-based and reference-based examination, candidates should practice using the books during study. A strong approach is to read a question, identify the key topic, decide which reference applies, locate the applicable chapter, section, table, diagram, safety rule, code provision, or trade explanation, and confirm the answer directly from the book. This type of preparation helps candidates build both content knowledge and reference navigation speed.\u003c\/p\u003e\n\n\u003cp\u003eExcavation questions may involve practical jobsite details. Candidates should understand how trench depth, soil conditions, water, utilities, traffic, spoil piles, nearby structures, equipment movement, access, and worker safety affect excavation decisions. They should also understand how proper backfill and compaction can affect pipe performance, settlement, drainage, and finished construction quality.\u003c\/p\u003e\n\n\u003cp\u003eThe Ultimate package format supports this preparation by combining the listed references with \u003cstrong\u003e1 year of course access\u003c\/strong\u003e and \u003cstrong\u003eApplication Service\u003c\/strong\u003e. The course gives candidates a structured way to review major topics and return to difficult areas, while the application support helps candidates work through the application portion of the process with clearer guidance.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) examination is an \u003cstrong\u003eopen book test\u003c\/strong\u003e using approved references. Candidates are responsible for bringing their own approved reference materials to the examination center when required by testing instructions. This package includes the listed references for study and exam preparation: \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e, \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e, and \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eOpen-book testing does not mean candidates can rely on searching the books for the first time during the exam. The most prepared candidates know how the references are organized before test day. They understand how to use the table of contents, indexes, chapter headings, definitions, code sections, tables, diagrams, safety sections, and trade reference organization. They also understand when a question is likely asking for OSHA safety language, pipe and excavation field guidance, or IBC code information.\u003c\/p\u003e\n\n\u003cp\u003eReference materials must be bound and may be highlighted, underlined, and indexed before the examination session. Permanent tabs are allowed. Temporary tabs, including Post-it notes, are not allowed and must be removed before the exam begins. Reference materials containing writing are not allowed into the examination, and candidates are not permitted to write in the references during the testing session.\u003c\/p\u003e\n\n\u003cp\u003eThis package supports open-book preparation by giving candidates access to the listed references and \u003cstrong\u003e1 year of course access\u003c\/strong\u003e. Candidates can use the course to guide their study, review GS-8 topics, and practice navigating the books in a way that supports timed exam performance.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eCandidates preparing for the New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) exam should begin by confirming the correct classification connected to their licensing goal. Earthmoving, excavation, and ditching work can involve site preparation, trenching, grading, underground work, pipe coordination, safety requirements, and building code awareness, so candidates should make sure they are preparing for the correct New Mexico classification before studying or scheduling.\u003c\/p\u003e\n\n\u003cp\u003eA practical preparation path includes reviewing the GS-8 classification, gathering needed information, completing the proper application process, submitting required materials, receiving approval to test when required, scheduling the exam, studying the listed references, preparing for any additional required exam, and arriving at the test center with proper identification and approved materials.\u003c\/p\u003e\n\n\u003cp\u003eThis Ultimate package includes \u003cstrong\u003eApplication Service\u003c\/strong\u003e, which is designed to help support candidates through the application portion of the process. Application Service does not replace state requirements or guarantee approval, but it can help candidates stay organized and move through the process with clearer guidance.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should keep application documents, exam notices, scheduling confirmations, identification requirements, score reports, rental package information, and licensing correspondence organized. After passing the required exam, candidates should follow the remaining instructions connected to their New Mexico licensing process before performing regulated contractor work.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eNew Mexico Earthmoving, Excavation and Ditching Contractor preparation requires study of excavation safety, pipe and excavation practices, and building code awareness. The exam preparation process should focus on both the practical field knowledge used on excavation projects and the ability to use the listed references effectively during open-book testing.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports the safety knowledge needed for excavation and construction work. Candidates should study excavation safety, trench protection, access and egress, spoil placement awareness, hazard recognition, protective equipment, fall protection, ladders, equipment-related hazards, and general construction safety requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports trade knowledge for trenching, excavation, pipe installation, underground construction, backfill, equipment, soil-related field conditions, and practical sitework procedures. Candidates should use this reference to strengthen their understanding of how excavation decisions affect pipe work, site performance, safety, and construction quality.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e supports code awareness and building construction requirements that may connect to excavation work. Candidates should become familiar with IBC organization, definitions, site and foundation-related topics, structural concepts, and general building code navigation.\u003c\/p\u003e\n\n\u003cp\u003eNew Mexico candidates should also understand that passing an exam is only one part of the overall licensing process. They may need to complete application steps, submit documentation, meet eligibility requirements, and follow state instructions connected to their specific classification. The Application Service included with this package supports candidates during the application process, while the course and books support exam preparation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Book: Code of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of federal construction safety standards, including excavation safety, trench protection, worker protection, access and egress, ladders, fall protection, personal protective equipment, hazard awareness, equipment-related hazards, and general jobsite safety requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of excavation, trenching, pipe installation, underground construction practices, backfill, sitework, equipment, soil-related field conditions, drainage awareness, and practical construction procedures used in earthmoving, excavation, and ditching work.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Book: International Building Code, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of building code organization, definitions, construction requirements, structural concepts, foundation-related awareness, site-related code provisions, and general commercial building code navigation that may connect to excavation work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThese references should be used throughout the \u003cstrong\u003e1 year of course access\u003c\/strong\u003e. Candidates should become familiar with the structure of each book, review major sections, and practice locating information by topic. Since the exam is open book, reference navigation is an important part of preparation.\u003c\/p\u003e\n\n\u003cp\u003eA useful study approach is to divide preparation into major GS-8 categories, including OSHA safety, excavation hazards, trenching, soil conditions, protective systems, access and egress, spoil placement, pipe installation, underground construction, backfill, compaction, site preparation, grading, drainage, IBC organization, and reference navigation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) exam requires preparation across OSHA construction safety, pipe and excavation practices, and building code awareness. Candidates should study the references as a connected set rather than treating them as unrelated books. A GS-8 question may require practical field knowledge, safety understanding, code awareness, or the ability to connect excavation conditions to written reference material.\u003c\/p\u003e\n\n\u003cp\u003eExcavation preparation should include trenching, earthmoving, ditching, site clearing, grading, soil conditions, water conditions, spoil pile placement, equipment movement, access, utility awareness, and jobsite coordination. \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports these topics and should be used regularly during study.\u003c\/p\u003e\n\n\u003cp\u003ePipe and underground construction preparation should include pipe installation, trench preparation, bedding awareness, backfill, compaction, slope, drainage, utility coordination, and protection of installed work. Excavation and pipe work often connect on the same project, so candidates should study how underground installation decisions affect performance and safety.\u003c\/p\u003e\n\n\u003cp\u003eOSHA preparation should include excavation safety, trench protection, protective systems, hazard recognition, access and egress, ladders, fall protection, personal protective equipment, equipment safety, material handling, and general construction safety practices. \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e should be studied carefully because excavation and trenching work can involve serious jobsite hazards.\u003c\/p\u003e\n\n\u003cp\u003eSoil and water conditions should receive focused study. Excavation work can change quickly depending on soil type, moisture, weather, groundwater, nearby structures, traffic, and equipment loads. Candidates should review how these field conditions affect trench stability, safety planning, backfill, and construction sequencing.\u003c\/p\u003e\n\n\u003cp\u003eBackfill and compaction awareness should also be part of preparation. Poor backfill practices can affect pipe performance, settlement, drainage, pavement, slabs, landscaping, and long-term site performance. Candidates should study backfill concepts and connect them to excavation, pipe installation, and site restoration.\u003c\/p\u003e\n\n\u003cp\u003eIBC preparation should include understanding how to navigate the \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e. Candidates should become familiar with code organization, definitions, construction requirements, foundation-related awareness, structural concepts, and general building code navigation. The IBC may support questions where excavation work connects to building construction or site-related requirements.\u003c\/p\u003e\n\n\u003cp\u003eEquipment and site coordination should also be reviewed. Earthmoving and excavation work often requires planning around equipment access, spoil placement, utility locations, traffic, workers, other trades, and jobsite conditions. Candidates should think through how excavation operations are planned, sequenced, protected, and completed safely.\u003c\/p\u003e\n\n\u003cp\u003eReference navigation should be practiced throughout preparation. Candidates should read a question, identify key terms, decide which reference applies, locate the relevant chapter, section, table, diagram, definition, safety rule, code provision, or trade explanation, and confirm the answer from the book. This repeated practice helps build speed and confidence for open-book testing.\u003c\/p\u003e\n\n\u003cp\u003eBecause the listed references cover different types of information, candidates should learn the purpose of each book. OSHA supports safety. Pipe and Excavation Contracting supports excavation and field construction practices. The IBC supports building code awareness and code navigation. Understanding the role of each reference helps candidates choose the right book faster during study and testing.\u003c\/p\u003e\n\n\u003cp\u003eThe online course included with this package helps organize study across these topics. With \u003cstrong\u003e1 year of course access\u003c\/strong\u003e, candidates can review material over time, revisit difficult sections, practice reference navigation, and build a consistent study routine. The package also includes \u003cstrong\u003eApplication Service\u003c\/strong\u003e, giving candidates additional support during the application portion of the licensing process.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps candidates prepare with organized, trade-focused support designed around the way open-book contractor exams are actually taken. For the New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) exam, preparation is not only about having the listed references. It is about learning how to use those references, recognize key terms, locate sections quickly, and apply excavation, ditching, earthmoving, safety, and code knowledge with confidence.\u003c\/p\u003e\n\n\u003cp\u003eThis Ultimate Exam Prep Rental Package supports candidates by combining the listed references with \u003cstrong\u003e1 year of course access\u003c\/strong\u003e and \u003cstrong\u003eApplication Service\u003c\/strong\u003e. Students can use the course to focus their review on OSHA safety, trenching, excavation hazards, soil conditions, protective systems, pipe installation, backfill, compaction, drainage, sitework, underground construction, IBC organization, and reference navigation.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep’s approach is practical and exam-oriented. The goal is to help candidates reduce confusion, organize their study routine, and build confidence through repeated reference navigation and trade-focused review. Candidates still need to study consistently and understand the material, but a structured course, the correct references, and application support can make the preparation process more manageable.\u003c\/p\u003e\n\n\u003cp\u003eMany GS-8 candidates have excavation, sitework, grading, pipe, utility, equipment, ditching, or field experience but are less familiar with moving through safety, trade, and code references under exam pressure. 1 Exam Prep helps support that transition by encouraging organized study, reference familiarity, practice-oriented preparation, and a clearer plan for using each book. With consistent effort, candidates can improve pacing, strengthen trade knowledge, and approach the New Mexico GS-8 exam with a stronger study foundation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this Ultimate Exam Prep Rental Package?\u003c\/h2\u003e\n\u003cp\u003eThis package includes \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e, \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e, \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e, the provided business books note of \u003cstrong\u003eIncludes lines 2-4\u003c\/strong\u003e, \u003cstrong\u003e1 year of course access\u003c\/strong\u003e, and \u003cstrong\u003eApplication Service\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the package price?\u003c\/h2\u003e\n\u003cp\u003eThe package price is \u003cstrong\u003e$1335\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs there a refundable deposit?\u003c\/h2\u003e\n\u003cp\u003eYes. The refundable deposit is \u003cstrong\u003e$300\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the total due today?\u003c\/h2\u003e\n\u003cp\u003eThe total due today is \u003cstrong\u003e$1635\u003c\/strong\u003e, which includes the package price and the refundable deposit.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre business books included?\u003c\/h2\u003e\n\u003cp\u003eYes. The provided business books note is: \u003cstrong\u003eIncludes lines 2-4\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does course access last?\u003c\/h2\u003e\n\u003cp\u003eThis Ultimate package includes \u003cstrong\u003e1 year of course access\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs Application Service included?\u003c\/h2\u003e\n\u003cp\u003eYes. \u003cstrong\u003eApplication Service\u003c\/strong\u003e is included with this package.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long should I allow for the ultimate book package order?\u003c\/h2\u003e\n\u003cp\u003ePlease allow up to \u003cstrong\u003e15 business days\u003c\/strong\u003e for ultimate book package orders.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this package for the New Mexico GS-8 exam?\u003c\/h2\u003e\n\u003cp\u003eYes. This package is designed for candidates preparing for the New Mexico Earthmoving, Excavation and Ditching Contractor (GS-8) exam using the listed OSHA, Pipe and Excavation Contracting, and IBC references.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the New Mexico GS-8 exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The exam is an open-book test using approved references. Candidates should bring only approved materials and follow all testing center rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat topics should I study for the GS-8 exam?\u003c\/h2\u003e\n\u003cp\u003eCandidates should study OSHA safety, excavation hazards, trenching, soil conditions, protective systems, access and egress, pipe installation, underground construction, backfill, compaction, site preparation, grading, drainage, IBC organization, and reference navigation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan the books be highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eReference materials may be highlighted, underlined, and indexed before the examination session. Permanent tabs are allowed. Temporary tabs, including Post-it notes, are not allowed.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo product can guarantee an exam result. This package supports candidates through listed references, structured online course access, application support, trade-focused review, reference navigation practice, and organized exam preparation.\u003c\/p\u003e\n","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":46012711010361,"sku":null,"price":1635.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/NM-EARTHWORK-ULTIMATE.jpg?v=1782492505","url":"https:\/\/1examprep.com\/es\/products\/new-mexico-earthmoving-excavation-and-ditching-contractor-gs-8-ultimate-exam-prep-rental-package","provider":"1 Exam Prep","version":"1.0","type":"link"}