{"product_id":"mississippi-marine-construction-contractor-book-package","title":"Mississippi Marine Construction Contractor Exam Book Package","description":"\u003ch3 data-start=\"184\" data-end=\"246\"\u003eMississippi Marine Construction Contractor Book Package\u003c\/h3\u003e\n\u003cp data-start=\"248\" data-end=\"784\"\u003eThe \u003cstrong data-start=\"252\" data-end=\"311\"\u003eMississippi Marine Construction Contractor Book Package\u003c\/strong\u003e from 1 Exam Prep provides the officially required reference materials for candidates preparing for the Mississippi Marine Construction Contractor License Exam, regulated by the \u003cspan class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"\u003e\u003cspan class=\"whitespace-normal\"\u003eMississippi State Board of Contractors\u003c\/span\u003e\u003c\/span\u003e (MSBOC). This complete book set covers marine construction fundamentals, project planning and equipment usage, concrete mix design, reinforcing steel placement, and OSHA jobsite safety applicable to waterfront, shoreline, and marine infrastructure projects.\u003c\/p\u003e\n\u003cp data-start=\"786\" data-end=\"1453\"\u003eAll references are approved for open-book testing and are intended to support exam sections on construction methods, materials handling, structural concrete practices, reinforcement installation, equipment operations, and safety compliance relevant to marine construction work. These publications ensure compliance with state-specific construction codes and nationally recognized concrete and safety standards applicable to licensed contractors performing docks, bulkheads, piers, and related marine construction services in Mississippi. The package aligns with 1 Exam Prep’s structured curriculum and state licensing requirements for marine construction contractors.\u003c\/p\u003e\n\u003chr data-start=\"1455\" data-end=\"1458\"\u003e\n\u003ch3 data-start=\"1460\" data-end=\"1618\"\u003eThis package contains the following books for the Mississippi Marine Construction Contractor open-book exam with \u003cspan class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"\u003e\u003cspan class=\"whitespace-normal\"\u003ePSI Services LLC\u003c\/span\u003e\u003c\/span\u003e:\u003c\/h3\u003e\n\u003cul data-start=\"1620\" data-end=\"1903\"\u003e\n\u003cli data-start=\"1620\" data-end=\"1708\"\u003e\n\u003cp data-start=\"1622\" data-end=\"1708\"\u003e\u003cem data-start=\"1622\" data-end=\"1677\"\u003eCode of Federal Regulations – 29 CFR Part 1926 (OSHA)\u003c\/em\u003e (latest available amendment)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1709\" data-end=\"1774\"\u003e\n\u003cp data-start=\"1711\" data-end=\"1774\"\u003e\u003cem data-start=\"1711\" data-end=\"1758\"\u003eConstruction Planning, Equipment, and Methods\u003c\/em\u003e, 10th Edition\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1775\" data-end=\"1834\"\u003e\n\u003cp data-start=\"1777\" data-end=\"1834\"\u003e\u003cem data-start=\"1777\" data-end=\"1818\"\u003eDesign and Control of Concrete Mixtures\u003c\/em\u003e, 17th Edition\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1835\" data-end=\"1903\"\u003e\n\u003cp data-start=\"1837\" data-end=\"1903\"\u003e\u003cem data-start=\"1837\" data-end=\"1887\"\u003ePlacing Reinforcing Bars – Recommended Practices\u003c\/em\u003e, 10th Edition\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1905\" data-end=\"1908\"\u003e\n\u003cp data-start=\"1910\" data-end=\"2288\"\u003eCandidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined, and\/or indexed prior to the examination session. However, references may not be written in. Any candidate caught writing in the references during the examination will have the references confiscated and will be reported to the department.\u003c\/p\u003e\n\u003cp data-start=\"2290\" data-end=\"2676\"\u003eFurthermore, candidates are not permitted to bring in any additional papers (loose or attached) with their approved references. Any additional materials will be removed from the references and confiscated. References may be tabbed\/indexed with permanent tabs only. Temporary tabs, such as Post-It notes, are not allowed and must be removed from the reference before the exam will begin.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45438973575225,"sku":null,"price":445.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/MS-MARINE-BOOK.jpg?v=1770847897","url":"https:\/\/1examprep.com\/products\/mississippi-marine-construction-contractor-book-package","provider":"1 Exam Prep","version":"1.0","type":"link"}