{"product_id":"mississippi-process-piping-contractor-book-package","title":"Mississippi Process Piping Contractor Exam Book Package","description":"\u003ch3 data-start=\"173\" data-end=\"230\"\u003eMississippi Process Piping Contractor Book Package\u003c\/h3\u003e\n\u003cp data-start=\"232\" data-end=\"751\"\u003eThe \u003cstrong data-start=\"236\" data-end=\"290\"\u003eMississippi Process Piping Contractor Book Package\u003c\/strong\u003e from 1 Exam Prep provides the officially required reference materials for candidates preparing for the Mississippi Process Piping Contractor License Exam, regulated by the \u003cspan class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"\u003e\u003cspan class=\"whitespace-normal\"\u003eMississippi State Board of Contractors\u003c\/span\u003e\u003c\/span\u003e (MSBOC). This specialized book set covers pressure piping codes, process piping design and installation standards, piping identification systems, welding fundamentals, and pipefitting practices applicable to industrial and mechanical piping projects.\u003c\/p\u003e\n\u003cp data-start=\"753\" data-end=\"1412\"\u003eAll references are approved for open-book testing and are intended to support exam sections on process piping layout, pressure piping requirements, welding procedures, system identification, materials handling, and installation practices relevant to process piping work. These publications ensure compliance with state-specific construction codes and nationally recognized ASME piping and fabrication standards applicable to licensed contractors performing industrial piping installation, modification, and maintenance in Mississippi. The package aligns with 1 Exam Prep’s structured curriculum and state licensing requirements for process piping contractors.\u003c\/p\u003e\n\u003chr data-start=\"1414\" data-end=\"1417\"\u003e\n\u003ch3 data-start=\"1419\" data-end=\"1572\"\u003eThis package contains the following books for the Mississippi Process Piping Contractor open-book exam with \u003cspan class=\"hover:entity-accent entity-underline inline cursor-pointer align-baseline\"\u003e\u003cspan class=\"whitespace-normal\"\u003ePSI Services LLC\u003c\/span\u003e\u003c\/span\u003e:\u003c\/h3\u003e\n\u003cul data-start=\"1574\" data-end=\"1815\"\u003e\n\u003cli data-start=\"1574\" data-end=\"1647\"\u003e\n\u003cp data-start=\"1576\" data-end=\"1647\"\u003e\u003cem data-start=\"1576\" data-end=\"1638\"\u003eASME A13.1 – Scheme for the Identification of Piping Systems\u003c\/em\u003e (2015)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1648\" data-end=\"1718\"\u003e\n\u003cp data-start=\"1650\" data-end=\"1718\"\u003e\u003cem data-start=\"1650\" data-end=\"1709\"\u003eASME B31.1 – Power Piping (ASME Code for Pressure Piping)\u003c\/em\u003e (2014)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1719\" data-end=\"1759\"\u003e\n\u003cp data-start=\"1721\" data-end=\"1759\"\u003e\u003cem data-start=\"1721\" data-end=\"1750\"\u003eASME B31.3 – Process Piping\u003c\/em\u003e (2014)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1760\" data-end=\"1787\"\u003e\n\u003cp data-start=\"1762\" data-end=\"1787\"\u003e\u003cem data-start=\"1762\" data-end=\"1778\"\u003eModern Welding\u003c\/em\u003e (2013)\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli data-start=\"1788\" data-end=\"1815\"\u003e\n\u003cp data-start=\"1790\" data-end=\"1815\"\u003e\u003cem data-start=\"1790\" data-end=\"1813\"\u003ePipefitter’s Handbook\u003c\/em\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003chr data-start=\"1817\" data-end=\"1820\"\u003e\n\u003cp data-start=\"1822\" data-end=\"2200\"\u003eCandidates are responsible for bringing their own references to the examination center. Reference materials may be highlighted, underlined, and\/or indexed prior to the examination session. However, references may not be written in. Any candidate caught writing in the references during the examination will have the references confiscated and will be reported to the department.\u003c\/p\u003e\n\u003cp data-start=\"2202\" data-end=\"2588\"\u003eFurthermore, candidates are not permitted to bring in any additional papers (loose or attached) with their approved references. Any additional materials will be removed from the references and confiscated. References may be tabbed\/indexed with permanent tabs only. Temporary tabs, such as Post-It notes, are not allowed and must be removed from the reference before the exam will begin.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45438980030521,"sku":null,"price":1595.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/MS-PIPING-BOOK.jpg?v=1770846876","url":"https:\/\/1examprep.com\/products\/mississippi-process-piping-contractor-book-package","provider":"1 Exam Prep","version":"1.0","type":"link"}