{"product_id":"nevada-photovoltaics-contractor-c-2g-books-course-rental-exam-room-approved-1","title":"Nevada Photovoltaics Contractor (C-2G) - Books \u0026 Course Rental - Exam Room Approved","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNevada Photovoltaics Contractor (C-2G) - Books \u0026amp; Course Rental - Exam Room Approved\u003c\/h1\u003e\n\n\u003cp\u003ePrepare for the Nevada Photovoltaics Contractor (C-2G) licensing examination with a Books \u0026amp; Course Rental package built around the approved electrical code reference, Nevada business and law preparation, and structured course access. This package includes the \u003cstrong\u003eNFPA 70 - National Electrical Code, 2017 edition\u003c\/strong\u003e and the \u003cstrong\u003eConstruction Business and Law Manual for Nevada\u003c\/strong\u003e, with supplied books highlighted and tabbed to support organized study and faster reference navigation.\u003c\/p\u003e\n\n\u003cp\u003eThe Nevada C-2G Photovoltaics classification focuses on the installation, alteration, and repair of photovoltaic cells, batteries, and inverters used to convert solar energy into electricity. Candidates preparing for this classification should be comfortable with photovoltaic theory, electrical interconnection, system components, installation methods, calculations, design considerations, permitting, utility interconnection, and safety.\u003c\/p\u003e\n\n\u003cp\u003eThe C-2G trade examination is an \u003cstrong\u003eopen-book test\u003c\/strong\u003e, and the \u003cstrong\u003eNFPA 70 - National Electrical Code, 2017 edition\u003c\/strong\u003e is the code reference allowed in the examination center. Candidates should use the NEC throughout preparation so they become familiar with its layout, terminology, articles, tables, definitions, and index before test day.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003eConstruction Business and Law Manual for Nevada\u003c\/strong\u003e is included to support preparation for Nevada's contractor management and business and law examination. Nevada requires contractor applicants to satisfy applicable business and law and trade examination requirements unless an authorized waiver applies.\u003c\/p\u003e\n\n\u003cp\u003eThis rental package also includes \u003cstrong\u003e6 months of course access\u003c\/strong\u003e, giving candidates a structured period for reviewing photovoltaic trade material, practicing NEC navigation, studying business and law topics, and working through practice-oriented preparation.\u003c\/p\u003e\n\n\u003cp\u003eThe rental cost is \u003cstrong\u003e$789\u003c\/strong\u003e, plus a \u003cstrong\u003erefundable book deposit of $200\u003c\/strong\u003e, for a \u003cstrong\u003etotal due today of $989\u003c\/strong\u003e. The $200 deposit is refundable when the books are returned within the rental period in similar condition.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease allow up to 15 business days for Book \u0026amp; Course Rental - Exam Room Approved Package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e NFPA 70 - National Electrical Code, 2017 edition — highlighted and tabbed.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e Construction Business and Law Manual for Nevada — highlighted and tabbed.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExam-Room Preparation:\u003c\/strong\u003e Prepared references for organized navigation and study.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRental Cost:\u003c\/strong\u003e $789.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRefundable Book Deposit:\u003c\/strong\u003e $200.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Due Today:\u003c\/strong\u003e $989.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe highlighted and tabbed format is designed to help candidates spend more study time working with important material and less time becoming familiar with the physical organization of the books. Repeated use of the tabs and highlighted sections can help build a consistent reference-navigation routine before the examination.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eThe Nevada C-2G Photovoltaics trade examination is administered through PSI for the Nevada State Contractors Board. Candidates must first complete the applicable contractor licensing process and receive examination eligibility before scheduling the required examination.\u003c\/p\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExam:\u003c\/strong\u003e Nevada C-2G Photovoltaics\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNumber of Questions:\u003c\/strong\u003e 75\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMinimum Passing Score:\u003c\/strong\u003e 56 correct answers\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed:\u003c\/strong\u003e 150 minutes\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTesting Provider:\u003c\/strong\u003e PSI\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExam Type:\u003c\/strong\u003e Open book\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eApproved Trade Code Reference:\u003c\/strong\u003e NFPA 70 - National Electrical Code, 2017 edition\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe official C-2G examination content outline includes the following subject areas:\u003c\/p\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePhotovoltaic Theory:\u003c\/strong\u003e 5 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eElectrical Interconnection:\u003c\/strong\u003e 15 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePermitting, Inspection, and Utility Interconnections:\u003c\/strong\u003e 5 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePhotovoltaic Components:\u003c\/strong\u003e 15 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePhotovoltaic Installation:\u003c\/strong\u003e 10 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eEstimating, Calculations, and Design:\u003c\/strong\u003e 20 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSafety:\u003c\/strong\u003e 5 questions\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eEstimating, calculations, and design represent the largest portion of the examination, followed by electrical interconnection and photovoltaic components. Candidates should build a study plan that reflects the weighting of these areas while still reviewing every subject on the official outline.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe Nevada C-2G Photovoltaics examination is an \u003cstrong\u003eopen-book test\u003c\/strong\u003e. The approved reference included in this rental package for the C-2G trade examination is the \u003cstrong\u003eNFPA 70 - National Electrical Code, 2017 edition\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003ePSI permits approved reference material to be highlighted, underlined, and indexed before the examination. References may not contain additional loose or attached papers. Permanent tabs are allowed, while temporary tabs such as Post-it notes are not permitted.\u003c\/p\u003e\n\n\u003cp\u003eThe highlighted and tabbed NEC supplied with this package helps candidates prepare using the same code edition identified for the examination. Candidates should practice finding requirements involving photovoltaic systems, conductors, overcurrent protection, grounding and bonding, wiring methods, disconnecting means, electrical equipment, services, and other code areas related to photovoltaic installations.\u003c\/p\u003e\n\n\u003cp\u003eAn open-book exam still requires technical knowledge. Searching the NEC for every question can consume valuable testing time. A stronger approach is to understand the photovoltaic or electrical concept first and then use the NEC to confirm a specific requirement, calculation method, exception, definition, or table value.\u003c\/p\u003e\n\n\u003cp\u003eWith 75 questions and 150 minutes, candidates have an average of about two minutes per question. Regular timed code-navigation practice can help build familiarity with the book and reduce unnecessary searching during the examination.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eThe C-2G examination is one part of the Nevada contractor licensing process. Candidates must complete the applicable licensing requirements in addition to preparing for the trade examination.\u003c\/p\u003e\n\n\u003col\u003e\n  \u003cli\u003e\n\u003cstrong\u003eConfirm the C-2G classification.\u003c\/strong\u003e Make sure the photovoltaic work the business intends to perform falls within the Nevada C-2G Photovoltaics classification.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIdentify the qualifying individual.\u003c\/strong\u003e The contractor application must identify the individual responsible for meeting the applicable qualification requirements.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare experience documentation.\u003c\/strong\u003e Organize qualifying work history and supporting information for the requested contractor classification.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSubmit the Nevada contractor license application.\u003c\/strong\u003e Provide the required business, qualifying individual, financial, experience, and supporting information.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete required fingerprinting.\u003c\/strong\u003e Nevada contractor applicants are subject to applicable fingerprint-based background requirements.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eReceive examination eligibility.\u003c\/strong\u003e Examination authorization is issued after the application is submitted and the applicable experience requirements are verified.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSchedule examinations with PSI.\u003c\/strong\u003e The qualifying individual may schedule required examinations after receiving examination eligibility.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for the C-2G trade examination.\u003c\/strong\u003e Review photovoltaic theory, electrical interconnection, system components, installation, design, calculations, permitting, utility interconnection, and safety.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for Nevada business and law.\u003c\/strong\u003e Use the included Construction Business and Law Manual for Nevada alongside the course materials.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete remaining licensing requirements.\u003c\/strong\u003e Satisfy all applicable Board requirements before the contractor license is issued.\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eNevada classifies C-2G Photovoltaics as a specialty area within electrical contracting. The classification authorizes the \u003cstrong\u003einstallation, alteration, and repair of photovoltaic cells, batteries, and inverters used in the conversion of solar energy into electricity\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe scope does not extend to the installation, alteration, or repair of electrical wires beyond the service panel under the C-2G classification. The classification is directed toward qualifying photovoltaic work rather than unrestricted electrical contracting.\u003c\/p\u003e\n\n\u003cp\u003eBecause photovoltaic systems combine electrical equipment with solar-energy technology, candidates should understand both the electrical-code requirements and the practical operation of photovoltaic components. Modules, conductors, inverters, batteries, disconnects, grounding components, overcurrent protection, and system interconnection all work together as part of the complete installation.\u003c\/p\u003e\n\n\u003cp\u003eNevada contractor licensing includes requirements beyond passing the trade examination. The Nevada State Contractors Board determines applicant qualifications and examination eligibility, and applicants must satisfy applicable business, experience, financial, examination, and licensing requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n    \u003cstrong\u003eNFPA 70 - National Electrical Code, 2017 edition\u003c\/strong\u003e\u003cbr\u003e\n    \u003cspan\u003e\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e This highlighted and tabbed electrical code reference supports preparation involving photovoltaic installations, conductors, grounding and bonding, overcurrent protection, wiring methods, disconnects, equipment, services, and other electrical requirements. The 2017 NEC is the code reference approved for use inside the Nevada C-2G trade examination.\u003c\/span\u003e\n  \u003c\/li\u003e\n  \u003cli\u003e\n    \u003cstrong\u003eConstruction Business and Law Manual for Nevada\u003c\/strong\u003e\u003cbr\u003e\n    \u003cspan\u003e\u003cstrong\u003eIncluded Rental Book:\u003c\/strong\u003e This highlighted and tabbed reference supports preparation for Nevada contractor business and law topics, including material associated with contractor management responsibilities and the Nevada licensing process.\u003c\/span\u003e\n  \u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\n\u003cp\u003eFor the Nevada C-2G Photovoltaics trade examination, the exam-room-approved reference included with this package is:\u003c\/p\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\u003cstrong\u003eNFPA 70 - National Electrical Code, 2017 edition\u003c\/strong\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe 2017 NEC should be used regularly throughout preparation. Candidates should learn how to navigate by article, subject, table, definition, and index term rather than depending on memorized page numbers.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003eConstruction Business and Law Manual for Nevada\u003c\/strong\u003e is included for Nevada business and law preparation and is the approved reference used for the open-book Nevada contractor management examination.\u003c\/p\u003e\n\n\u003cp\u003eBecause the books supplied with this package are highlighted and tabbed, candidates can use the same prepared references throughout their study period to develop a repeatable navigation method.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003eA strong C-2G study plan should combine photovoltaic trade knowledge, electrical theory, NEC navigation, calculations, system design, safety, and Nevada business and law preparation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePhotovoltaic Theory\u003c\/strong\u003e should include the fundamental principles involved in converting solar energy into electrical energy. Candidates should understand the relationships among photovoltaic modules, arrays, voltage, current, power, and system output.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eElectrical Interconnection\u003c\/strong\u003e represents a major examination category. Preparation should include how photovoltaic equipment interfaces with electrical systems, along with applicable conductors, overcurrent protection, disconnecting means, grounding, bonding, and code requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePhotovoltaic Components\u003c\/strong\u003e should be studied as parts of a complete system. Candidates should understand the purpose and interaction of modules, inverters, batteries, conductors, combiner equipment, disconnects, protective devices, and other system components.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePhotovoltaic Installation\u003c\/strong\u003e should include practical system assembly, conductor routing, equipment installation, electrical connections, protection, grounding, mounting considerations, and proper installation methods.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eEstimating, Calculations, and Design\u003c\/strong\u003e account for 20 examination questions, making this the largest content area. Candidates should devote meaningful study time to calculations and system-design concepts rather than depending solely on code-book lookup skills.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePermitting, Inspection, and Utility Interconnections\u003c\/strong\u003e should also be part of preparation. Photovoltaic work must integrate technical installation knowledge with applicable inspection and interconnection considerations.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSafety\u003c\/strong\u003e should be reviewed throughout preparation rather than treated as a separate final topic. Photovoltaic work presents electrical hazards and can involve energized equipment, stored energy, rooftop work, tools, and other jobsite risks.\u003c\/p\u003e\n\n\u003cp\u003eFor NEC preparation, practice identifying the subject before opening the book. If a question involves grounding, determine whether it concerns equipment grounding, bonding, grounding electrodes, or another grounding concept. If it involves conductors, identify whether the issue relates to ampacity, sizing, protection, routing, or another requirement.\u003c\/p\u003e\n\n\u003cp\u003eThe included \u003cstrong\u003e6 months of course access\u003c\/strong\u003e gives candidates time to work through these subjects in a structured format while repeatedly using the highlighted and tabbed references. Practice-oriented study can help identify weaker areas so additional time can be directed toward calculations, electrical interconnection, components, code navigation, or business and law.\u003c\/p\u003e\n\n\u003cp\u003eThe Construction Business and Law Manual for Nevada should also be incorporated into the regular study schedule. Alternating trade preparation with business and law review can help candidates maintain a balanced approach to the overall contractor licensing process.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep supports Nevada Photovoltaics Contractor candidates through organized study guidance, trade-focused review, practice-oriented preparation, reference navigation, and a structured approach to both C-2G technical material and Nevada contractor business and law.\u003c\/p\u003e\n\n\u003cp\u003eThis Books \u0026amp; Course Rental package provides the \u003cstrong\u003eNFPA 70 - National Electrical Code, 2017 edition\u003c\/strong\u003e and the \u003cstrong\u003eConstruction Business and Law Manual for Nevada\u003c\/strong\u003e in highlighted and tabbed format. The prepared references can help candidates spend their study time learning how to locate and apply important material efficiently.\u003c\/p\u003e\n\n\u003cp\u003eThe included \u003cstrong\u003e6 months of course access\u003c\/strong\u003e provides a structured period for reviewing photovoltaic theory, electrical interconnection, components, installation, calculations, design, safety, NEC navigation, and Nevada business and law topics.\u003c\/p\u003e\n\n\u003cp\u003eReference navigation is particularly important for the open-book C-2G trade examination. Candidates can practice with the 2017 NEC before exam day and develop familiarity with its index, definitions, articles, tables, cross-references, and photovoltaic-related requirements.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep encourages candidates to combine reference navigation with actual trade knowledge. Understanding the technical issue before searching the NEC can help make code research more focused and efficient.\u003c\/p\u003e\n\n\u003cp\u003eThe goal is to provide an organized study structure that supports stronger familiarity with the exam-room reference, photovoltaic trade concepts, calculations, business and law material, and the broader Nevada contractor licensing process.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in the Nevada C-2G Books \u0026amp; Course Rental package?\u003c\/h2\u003e\n\n\u003cp\u003eThe package includes the NFPA 70 - National Electrical Code, 2017 edition; Construction Business and Law Manual for Nevada; highlighted and tabbed book preparation; and 6 months of course access.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Nevada C-2G Photovoltaics exam open book?\u003c\/h2\u003e\n\n\u003cp\u003eYes. The Nevada C-2G Photovoltaics trade examination is open book with the approved 2017 National Electrical Code reference.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the Nevada C-2G exam?\u003c\/h2\u003e\n\n\u003cp\u003eThe C-2G Photovoltaics trade examination contains 75 questions.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed for the C-2G exam?\u003c\/h2\u003e\n\n\u003cp\u003eCandidates are allowed 150 minutes to complete the examination.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\n\u003cp\u003eThe minimum passing score is 56 correct answers.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the rental books highlighted and tabbed?\u003c\/h2\u003e\n\n\u003cp\u003eYes. The supplied books are highlighted and tabbed to support organized review and reference navigation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much course access is included?\u003c\/h2\u003e\n\n\u003cp\u003eThe package includes \u003cstrong\u003e6 months of course access\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the rental cost?\u003c\/h2\u003e\n\n\u003cp\u003eThe rental cost is \u003cstrong\u003e$789\u003c\/strong\u003e, plus a \u003cstrong\u003e$200 refundable book deposit\u003c\/strong\u003e, for a total due today of \u003cstrong\u003e$989\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the $200 book deposit refundable?\u003c\/h2\u003e\n\n\u003cp\u003eYes. The $200 deposit is refundable when the books are returned within the rental period in similar condition.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long should I allow for my order?\u003c\/h2\u003e\n\n\u003cp\u003ePlease allow up to \u003cstrong\u003e15 business days\u003c\/strong\u003e for Book \u0026amp; Course Rental - Exam Room Approved Package orders.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat subjects should I study for the C-2G exam?\u003c\/h2\u003e\n\n\u003cp\u003eThe official exam outline covers photovoltaic theory, electrical interconnection, permitting, inspection and utility interconnections, photovoltaic components, photovoltaic installation, estimating, calculations and design, and safety.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy should I practice with the NEC before exam day?\u003c\/h2\u003e\n\n\u003cp\u003eRegular NEC navigation practice helps candidates become familiar with the structure of the approved reference so they can locate applicable electrical requirements more efficiently during the timed open-book examination.\u003c\/p\u003e\n","brand":"1 Exam Prep","offers":[{"title":"Exam Room Approved Book \u0026 Courses Rental - Self Study","offer_id":46391208837177,"sku":null,"price":989.0,"currency_code":"USD","in_stock":true},{"title":"Exam Room Approved Book \u0026 Courses Rental - Self Study + State Application [+$450]","offer_id":46391208902713,"sku":null,"price":1439.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/NV-photovoltaicsC-2G-RENTALEO_bc874e98-4fb9-4cc5-852a-56cf80ab6669.jpg?v=1787701108","url":"https:\/\/1examprep.com\/products\/nevada-photovoltaics-contractor-c-2g-books-course-rental-exam-room-approved-1","provider":"1 Exam Prep","version":"1.0","type":"link"}