{"product_id":"new-mexico-core-contractor-gf-books-courses-rental-package","title":"New Mexico Core Contractor GF - Books \u0026 Courses Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNew Mexico Core Contractor GF - Books \u0026amp; Courses Rental Package\u003c\/h1\u003e\n\n\u003cp\u003eNew Mexico Core Contractor GF - Books \u0026amp; Courses Rental Package is designed for candidates preparing for the New Mexico GF contractor exam with rental reference books and online course access. This package supports candidates studying core construction topics, stormwater management, New Mexico highway and bridge specifications, pipe and excavation work, utility notification, building code fundamentals, OSHA construction safety, business preparation materials, and open-book reference navigation.\u003c\/p\u003e\n\n\u003cp\u003eThis books and courses rental package includes the listed references: \u003cstrong\u003eStorm Water Management for Construction Activities, 1992\u003c\/strong\u003e, \u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e, \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e, \u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e, \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e, and \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e. These references support preparation for construction stormwater practices, New Mexico specification language, excavation and pipe work, safe digging coordination, building code organization, jobsite safety, construction terminology, and open-book exam preparation.\u003c\/p\u003e\n\n\u003cp\u003eThe package also includes business books listed as \u003cstrong\u003eIncludes Lines 2-4\u003c\/strong\u003e. Candidates preparing for contractor licensing should use the trade references for the GF exam and the included business books as part of broader licensing preparation when business and law content applies to their path.\u003c\/p\u003e\n\n\u003cp\u003eCore contractor exam preparation requires more than field experience with excavation, drainage, pipe installation, stormwater controls, site work, building construction, safety, roadway specifications, or utility coordination. Candidates also need to understand how each reference is organized, how specifications are written, how code language is structured, how OSHA requirements are arranged, how utility notification information is presented, and how to locate exact information efficiently during an open-book test.\u003c\/p\u003e\n\n\u003cp\u003eThe rental book format is useful for candidates who want access to the required references without purchasing every book outright. The online course portion helps students organize their study, review GF trade topics, and practice moving through the references before exam day. Candidates can use the books and course together to build familiarity with stormwater management material, New Mexico highway and bridge specifications, pipe and excavation references, New Mexico One Call excavation guidance, the International Building Code, and OSHA construction standards.\u003c\/p\u003e\n\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n  \u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n  \u003cul\u003e\n    \u003cli\u003e\n\u003cstrong\u003eRental Books:\u003c\/strong\u003e Storm Water Management for Construction Activities, 1992; New Mexico Specifications for Highway and Bridge Construction, 2019; Pipe and Excavation Contracting; New Mexico One Call Excavator Handbook; International Building Code, 2021; and Code of Federal Regulations - 29 CFR Part 1926 (OSHA).\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eBusiness Books Included:\u003c\/strong\u003e Includes Lines 2-4.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,060.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eRefundable Deposit:\u003c\/strong\u003e $550.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $1,610.\u003c\/li\u003e\n  \u003c\/ul\u003e\n\u003c\/div\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease allow up to 15 business days for book \u0026amp; course rental package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Core Contractor GF exam is intended for candidates preparing to demonstrate knowledge of core construction practices, stormwater management, pipe and excavation work, New Mexico construction specifications, safe excavation coordination, building code fundamentals, OSHA construction safety, and open-book reference use. This books and courses rental package supports preparation using the listed references and 6 months of course access.\u003c\/p\u003e\n\n\u003cp\u003eImportant study areas include construction stormwater management, erosion and sediment control awareness, New Mexico highway and bridge specification organization, pipe installation, trenching, excavation practices, bedding, backfill, utility notification, safe digging coordination, building code definitions, occupancy and construction terminology, general building code organization, OSHA construction safety, hazard recognition, excavation safety awareness, construction terminology, tables, diagrams, specification sections, and reference navigation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eStorm Water Management for Construction Activities, 1992\u003c\/strong\u003e supports construction stormwater preparation. Candidates should review erosion and sediment control awareness, runoff management, pollution prevention concepts, site stabilization, construction stormwater practices, and how stormwater controls apply to construction activities. Core contractor work may involve site conditions where stormwater management and construction activity controls are important.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e supports state-specific construction preparation. Candidates should become familiar with specification organization, materials, construction methods, earthwork, drainage, roadway work, pipe-related sections where applicable, construction terminology, and state specification language. Specification-based questions may require candidates to locate exact sections and apply written requirements to a described field condition.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports pipe and underground construction preparation. Candidates should study trenching, pipe installation, excavation methods, bedding, backfill, site conditions, construction sequencing, shoring awareness, equipment awareness, and underground construction practices. Excavation and pipe topics can appear in practical questions involving trenches, drainage, utilities, backfill, or construction sequencing.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e supports utility notification and safe excavation coordination preparation. Candidates should review excavation responsibilities, utility notification concepts, locating awareness, safe digging practices, damage prevention, and coordination before excavation. Because core contractor work may involve site excavation and underground work, candidates should include this handbook in regular study.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e supports building code preparation. Candidates should review IBC organization, definitions, general building code concepts, construction terminology, occupancy and use terminology where applicable, construction type concepts, fire-resistance terminology where applicable, means of egress awareness, and how building code provisions are arranged. Building code questions often require candidates to locate exact language, tables, definitions, or chapter material.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports construction safety preparation. Candidates should review OSHA construction standards, hazard recognition, personal protective equipment, excavation safety awareness, equipment-related safety topics, fall protection awareness where applicable, and general jobsite safety requirements. Safety questions should be answered from OSHA language when the question points to federal construction safety requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Core Contractor GF examination is an \u003cstrong\u003eopen book test\u003c\/strong\u003e using approved references. Candidates are responsible for bringing their own approved reference materials to the examination center when required by testing instructions. This rental package includes the listed trade references for study, along with business books listed as Includes Lines 2-4 and 6 months of course access.\u003c\/p\u003e\n\n\u003cp\u003eOpen-book testing does not mean candidates can rely on searching the books for the first time during the exam. The most prepared candidates know how each reference is organized before test day. They understand how to use tables of contents, indexes, chapters, specifications, code sections, diagrams, tables, definitions, safety standards, stormwater topics, excavation topics, and construction terminology.\u003c\/p\u003e\n\n\u003cp\u003eReference materials must be bound and may be highlighted, underlined, and indexed before the examination session. Permanent tabs are allowed. Temporary tabs, including Post-it notes, are not allowed and must be removed before the exam begins. Reference materials containing writing are not allowed into the examination, and candidates are not permitted to write in the references during the testing session.\u003c\/p\u003e\n\n\u003cp\u003eThis books and courses rental package supports open-book preparation by combining rental references with online course access. Candidates should use the books throughout the 6 months of course access so reference navigation becomes part of regular study. Repeated use of the references helps candidates locate stormwater topics, New Mexico specification sections, pipe and excavation material, One Call excavation information, building code provisions, OSHA safety standards, tables, definitions, diagrams, and construction terms more confidently.\u003c\/p\u003e\n\n\u003cp\u003eA strong open-book study routine connects every topic to a book location. When reviewing stormwater management, candidates should use the stormwater reference. When reviewing state construction requirements, they should use the New Mexico specifications. When reviewing excavation and pipe work, they should use Pipe and Excavation Contracting and the New Mexico One Call Excavator Handbook. When reviewing building code topics, they should use the International Building Code. When reviewing safety, they should use OSHA.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eCandidates preparing for the New Mexico Core Contractor GF exam should begin by confirming that the GF classification matches their licensing goal. Core contractor work can involve construction safety, stormwater management, excavation, pipe installation, building code awareness, utility coordination, New Mexico specification review, site work, construction terminology, and practical field decision-making.\u003c\/p\u003e\n\n\u003cp\u003eA practical preparation path includes reviewing the GF exam focus, gathering required information, completing the proper application or approval process when required, scheduling the exam, studying the listed rental references, using the online course, practicing open-book navigation, preparing for any additional required exam, and arriving at the test center with proper identification and approved materials. Candidates should also review all testing instructions before exam day.\u003c\/p\u003e\n\n\u003cp\u003eBecause contractor exams are reference-based, candidates should build a study routine around the actual books, specifications, handbook, code, and safety standards. Reading general summaries alone is not enough. Candidates should spend time inside the stormwater management reference, New Mexico highway and bridge specifications, Pipe and Excavation Contracting, New Mexico One Call Excavator Handbook, International Building Code, and OSHA construction standards.\u003c\/p\u003e\n\n\u003cp\u003eGF questions often contain details that affect the correct answer, such as stormwater practice, construction activity condition, specification section, pipe installation issue, excavation requirement, backfill procedure, utility notification topic, building code definition, construction classification term, safety requirement, or site condition. Candidates should practice identifying the key subject before opening a book. This helps them choose the correct reference and avoid losing time in the wrong section.\u003c\/p\u003e\n\n\u003cp\u003ePreparation should also include steady review of core construction terminology. Many exam questions depend on understanding the wording of the question before locating the answer. Candidates should know how specification language, safety terms, stormwater terminology, excavation language, pipe installation terms, utility notification language, and building code terminology affect the correct answer.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eNew Mexico GF core contractor preparation requires study of trade references, New Mexico highway specifications, New Mexico One Call excavation coordination, construction stormwater management, building code material, and OSHA construction safety. This rental package includes the listed trade references, business books listed as Includes Lines 2-4, and 6 months of course access.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e is a key state-specific reference for GF preparation. Candidates should become familiar with the structure of the specifications and how material requirements, construction methods, earthwork, drainage, roadway construction, and state construction terminology are presented.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e supports New Mexico-specific excavation coordination and safe digging preparation. Candidates should review utility notification concepts, excavator responsibilities, locating awareness, damage prevention, and coordination practices before excavation. This reference is important for work involving trenches, site work, pipe installation, drainage, and underground construction conditions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eStorm Water Management for Construction Activities, 1992\u003c\/strong\u003e supports construction stormwater preparation. Candidates should review erosion and sediment control awareness, runoff management, pollution prevention, construction site practices, and stormwater controls used during construction activity.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports underground construction preparation, including pipe installation, trenching, bedding, backfill, excavation methods, equipment awareness, and jobsite planning. \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e supports building code preparation, including code organization, definitions, construction terminology, and building-related code provisions. \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports construction safety preparation.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should also use the included business books listed as \u003cstrong\u003eIncludes Lines 2-4\u003c\/strong\u003e when preparing for licensing-related business topics that apply to their path. Business preparation may support the broader licensing process, while the GF trade references support technical exam preparation.\u003c\/p\u003e\n\n\u003cp\u003eExam preparation is only one part of the overall process. Candidates may need to complete application steps, meet eligibility requirements, submit documentation, follow testing instructions, and comply with state or program requirements connected to the GF classification. This package supports preparation through rental references and online study guidance.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Storm Water Management for Construction Activities, 1992\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of construction stormwater management, erosion and sediment control awareness, runoff control, site stabilization, pollution prevention concepts, and stormwater practices for construction activities.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: New Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of New Mexico highway and bridge construction specifications, materials, methods, earthwork, drainage, roadway construction, pipe-related topics where applicable, and state construction requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of excavation, trenching, pipe installation, bedding, backfill, jobsite conditions, excavation equipment awareness, shoring awareness, and underground construction methods.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: New Mexico One Call Excavator Handbook\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of utility notification, safe excavation coordination, locating awareness, excavator responsibilities, damage prevention, and safe digging practices in New Mexico.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: International Building Code, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of building code organization, definitions, general building code concepts, construction terminology, occupancy and use terminology where applicable, construction type concepts, means of egress awareness, tables, and code navigation.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Code of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of OSHA construction safety standards, hazard recognition, personal protective equipment, equipment safety, excavation safety awareness, fall protection awareness where applicable, and jobsite safety requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBusiness Books Included: Includes Lines 2-4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThese included business books support broader contractor licensing preparation when business and law study materials apply to the candidate’s licensing path.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThese rental references should be used throughout the 6 months of course access. Candidates should become familiar with the organization of each book, specification, handbook, code, and safety standard. Strong reference familiarity helps candidates work more efficiently during open-book testing and reduces the chance of searching in the wrong source during the exam.\u003c\/p\u003e\n\n\u003cp\u003eBecause this package includes both rental books and online course access, candidates should use the course while keeping the references available. The books provide the source material, while the online preparation helps organize review, identify study areas, and build more confident open-book reference navigation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003eNew Mexico GF books and courses rental preparation should focus on both core construction knowledge and reference navigation. Candidates should study construction stormwater management, New Mexico highway specifications, pipe and excavation practices, New Mexico One Call excavation coordination, building code organization, OSHA construction safety, business books listed as Includes Lines 2-4, and the layout of every included rental reference.\u003c\/p\u003e\n\n\u003cp\u003eStormwater preparation should include \u003cstrong\u003eStorm Water Management for Construction Activities, 1992\u003c\/strong\u003e. Candidates should review construction stormwater practices, erosion and sediment control awareness, runoff control, pollution prevention concepts, site stabilization, and stormwater management during construction. These topics connect to site work and construction activities where drainage and runoff management are part of the project.\u003c\/p\u003e\n\n\u003cp\u003eNew Mexico specification preparation should include \u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e. Candidates should review specification organization, materials, construction methods, earthwork, drainage, roadway construction, pipe-related sections where applicable, construction terminology, tables, notes, and section structure. Specification questions should be answered from exact specification language whenever possible.\u003c\/p\u003e\n\n\u003cp\u003ePipe and excavation preparation should include \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e. Candidates should review trenching, pipe installation, bedding, backfill, excavation equipment awareness, shoring awareness, site conditions, sequencing, and underground construction methods. This reference helps candidates prepare for practical excavation and pipe installation questions.\u003c\/p\u003e\n\n\u003cp\u003eSafe digging preparation should include \u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e. Candidates should review utility notification, locating awareness, excavator responsibilities, safe digging practices, and damage prevention. This material is especially important for work involving excavation, pipe installation, underground construction, and site preparation.\u003c\/p\u003e\n\n\u003cp\u003eBuilding code preparation should include \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e. Candidates should review code organization, definitions, general building code concepts, construction terminology, occupancy and use terminology where applicable, construction type concepts, tables, and navigation. Building code questions may require candidates to locate definitions, chapter material, or table-based information.\u003c\/p\u003e\n\n\u003cp\u003eSafety preparation should include \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e. Candidates should review construction safety standards, hazard recognition, excavation safety awareness, equipment safety, personal protective equipment, fall protection awareness where applicable, and jobsite safety requirements. Safety questions should be answered from OSHA language when the question points to a federal construction safety requirement.\u003c\/p\u003e\n\n\u003cp\u003eBusiness books listed as \u003cstrong\u003eIncludes Lines 2-4\u003c\/strong\u003e should be used for licensing-related business study when applicable. Candidates should keep technical GF exam preparation organized separately from business and law preparation so they can focus on the right material during each study session.\u003c\/p\u003e\n\n\u003cp\u003eReference navigation should be practiced throughout the 6 months of course access. Candidates should learn how to move from the table of contents to the correct chapter, use indexes effectively, identify specification sections, read diagrams and tables, locate OSHA requirements, review code definitions, confirm stormwater concepts, find One Call material, and verify exact information before choosing an answer. Practicing with every reference helps candidates become more comfortable with the full set of books.\u003c\/p\u003e\n\n\u003cp\u003eA helpful study routine is to organize topics by construction area. Candidates can study stormwater in one session, New Mexico specifications in another, pipe and excavation separately, One Call excavation coordination separately, building code topics in another session, OSHA safety separately, and business materials in a separate review. After each topic review, candidates should practice locating the applicable sections in the correct reference.\u003c\/p\u003e\n\n\u003cp\u003eThe most effective open-book preparation combines familiarity, repetition, and careful reading. Candidates should know where major stormwater, specification, pipe, excavation, One Call, building code, OSHA, and construction topics are located, how the references explain them, and how to confirm answers from the books. This books and courses rental package is designed to make that process more organized through rental references and online course access.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps candidates prepare with organized, trade-focused support designed around the way open-book contractor exams are actually taken. For the New Mexico Core Contractor GF exam, preparation is not only about having the listed references. It is about learning how to use those references, recognize key terms, locate sections quickly, and apply stormwater, New Mexico specification, pipe, excavation, One Call, building code, OSHA, and core construction knowledge with confidence.\u003c\/p\u003e\n\n\u003cp\u003eThis books and courses rental package supports candidates through rental references, 6 months of course access, organized study guidance, trade-focused review, practice-oriented preparation, business books listed as Includes Lines 2-4, and reference navigation. Students can focus their review on stormwater management, New Mexico highway and bridge specifications, pipe and excavation work, New Mexico One Call excavation coordination, International Building Code topics, OSHA construction safety, business preparation materials, construction terminology, and open-book reference use.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep’s approach is practical and exam-oriented. The goal is to help candidates reduce confusion, organize their study routine, and build confidence through repeated reference navigation and trade-focused review. Candidates still need to study consistently and understand the material, but having the rental references and course access together can make the preparation process more manageable and focused.\u003c\/p\u003e\n\n\u003cp\u003eMany GF candidates have construction, excavation, pipe installation, stormwater, roadway, building, utility coordination, site work, safety, or field experience but are less familiar with moving through several references under exam pressure. 1 Exam Prep helps support that transition by encouraging reference familiarity, organized study habits, practice-oriented preparation, and a clearer plan for exam-day book navigation.\u003c\/p\u003e\n\n\u003cp\u003eThe course structure also helps candidates avoid common study problems. Instead of focusing only on familiar field topics, candidates are encouraged to review the full reference set. Instead of assuming an answer from experience, candidates practice confirming answers from specifications, safety standards, manuals, codes, and technical references. Instead of waiting until the exam to learn the books, candidates build reference navigation into their study routine from the beginning.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this Books \u0026amp; Courses Rental Package?\u003c\/h2\u003e\n\u003cp\u003eThis package includes rental access to Storm Water Management for Construction Activities, 1992; New Mexico Specifications for Highway and Bridge Construction, 2019; Pipe and Excavation Contracting; New Mexico One Call Excavator Handbook; International Building Code, 2021; and Code of Federal Regulations - 29 CFR Part 1926 (OSHA). It also includes business books listed as Includes Lines 2-4 and 6 months of course access.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the price of this rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package price is \u003cstrong\u003e$1,060\u003c\/strong\u003e, plus a \u003cstrong\u003e$550 refundable deposit\u003c\/strong\u003e, for a \u003cstrong\u003etotal of $1,610\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThis package includes \u003cstrong\u003e6 months of course access\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long should I allow for this order?\u003c\/h2\u003e\n\u003cp\u003ePlease allow up to \u003cstrong\u003e15 business days\u003c\/strong\u003e for book \u0026amp; course rental package orders.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this package for the New Mexico GF exam?\u003c\/h2\u003e\n\u003cp\u003eYes. This package is designed for candidates preparing for the New Mexico Core Contractor GF exam using the listed stormwater, New Mexico specification, pipe and excavation, One Call, building code, and OSHA references.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the New Mexico GF exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The exam is an open-book test using approved references. Candidates should bring only approved materials and follow all testing center rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy is reference navigation important?\u003c\/h2\u003e\n\u003cp\u003eReference navigation is important because the exam is open book. Candidates should know how to locate stormwater guidance, New Mexico specification language, pipe and excavation topics, One Call information, IBC code sections, OSHA requirements, definitions, and tables quickly.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package include business books?\u003c\/h2\u003e\n\u003cp\u003eYes. Business books are included and listed as Includes Lines 2-4.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I write notes in my references for the exam?\u003c\/h2\u003e\n\u003cp\u003eReference materials containing writing are not allowed into the examination, and candidates are not permitted to write in the references during the testing session. Highlighting, underlining, indexing, and permanent tabs are allowed.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo product can guarantee an exam result. This package supports candidates through rental references, course access, organized trade review, practice-oriented preparation, business materials, and open-book reference navigation.\u003c\/p\u003e\n","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":46095521349689,"sku":null,"price":1610.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/NM-GFCORE-RENTAL.jpg?v=1783020596","url":"https:\/\/1examprep.com\/products\/new-mexico-core-contractor-gf-books-courses-rental-package","provider":"1 Exam Prep","version":"1.0","type":"link"}