{"product_id":"new-mexico-curbs-gutters-and-culvert-contractor-ga-3-books-courses-rental-package","title":"New Mexico Curbs, Gutters and Culvert Contractor GA-3 - Books \u0026 Courses Rental Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNew Mexico Curbs, Gutters and Culvert Contractor GA-3 - Books \u0026amp; Courses Rental Package\u003c\/h1\u003e\n\n\u003cp\u003eNew Mexico Curbs, Gutters and Culvert Contractor GA-3 - Books \u0026amp; Courses Rental Package is designed for candidates preparing for the New Mexico GA-3 contractor exam with rental reference books and online course access. This package supports candidates studying concrete materials, curb and gutter construction, culvert work, pipe installation, excavation, OSHA construction safety, New Mexico highway specifications, utility notification, stormwater systems, business preparation materials, and open-book reference navigation.\u003c\/p\u003e\n\n\u003cp\u003eThis books and courses rental package includes the listed references: \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e, \u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e, \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e, \u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e, \u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e, and \u003cstrong\u003eDesign and Construction of Urban Stormwater Management Systems, 1992\u003c\/strong\u003e. These references support preparation for construction safety, concrete mixtures, pipe and excavation work, culvert installation, New Mexico specification language, safe digging coordination, drainage systems, stormwater management, and open-book exam preparation.\u003c\/p\u003e\n\n\u003cp\u003eThe package also includes business books listed as \u003cstrong\u003eIncludes Lines 2-4\u003c\/strong\u003e. Candidates preparing for contractor licensing should use the trade references for the GA-3 exam and the included business books as part of broader licensing preparation when business and law content applies to their path.\u003c\/p\u003e\n\n\u003cp\u003eCurbs, gutters, and culvert contractor exam preparation requires more than field experience with concrete placement, forming, drainage, culverts, pipe installation, excavation, bedding, backfill, stormwater systems, roadway work, utility coordination, or construction safety. Candidates also need to understand how each reference is organized, how specifications are written, how concrete material information is presented, how excavation and pipe installation topics are arranged, and how to locate exact information efficiently during an open-book test.\u003c\/p\u003e\n\n\u003cp\u003eThe rental book format is useful for candidates who want access to the required references without purchasing every book outright. The online course portion helps students organize their study, review GA-3 trade topics, and practice moving through the references before exam day. Candidates can use the books and course together to build familiarity with OSHA, concrete materials, pipe and excavation practices, New Mexico specifications, One Call excavation coordination, and urban stormwater management systems.\u003c\/p\u003e\n\n\u003cdiv style=\"border: 3px solid #d32f2f; padding: 20px; margin: 25px 0; background-color: #fff7f7;\"\u003e\n  \u003ch2 style=\"color: #d32f2f; margin-top: 0;\"\u003eWhat You Get\u003c\/h2\u003e\n  \u003cul\u003e\n    \u003cli\u003e\n\u003cstrong\u003eRental Books:\u003c\/strong\u003e Code of Federal Regulations - 29 CFR Part 1926 (OSHA); Design and Control of Concrete Mixtures, 17th Edition; Pipe and Excavation Contracting; New Mexico Specifications for Highway and Bridge Construction, 2019; New Mexico One Call Excavator Handbook; and Design and Construction of Urban Stormwater Management Systems, 1992.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eBusiness Books Included:\u003c\/strong\u003e Includes Lines 2-4.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eCourse Access:\u003c\/strong\u003e 6 months of course access.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003ePackage Price:\u003c\/strong\u003e $1,110.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eRefundable Deposit:\u003c\/strong\u003e $500.\u003c\/li\u003e\n    \u003cli\u003e\n\u003cstrong\u003eTotal Due:\u003c\/strong\u003e $1,610.\u003c\/li\u003e\n  \u003c\/ul\u003e\n\u003c\/div\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease allow up to 15 business days for book \u0026amp; course rental package orders.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Curbs, Gutters and Culvert Contractor GA-3 exam is intended for candidates preparing to demonstrate knowledge of curb and gutter construction, culvert work, concrete materials, pipe installation, excavation practices, construction safety, stormwater and drainage systems, New Mexico highway specifications, utility notification, and open-book reference use. This books and courses rental package supports preparation using the listed references and 6 months of course access.\u003c\/p\u003e\n\n\u003cp\u003eImportant study areas include OSHA construction safety, excavation safety awareness, concrete mixture concepts, concrete placement, curing, durability, curb and gutter construction, pipe installation, culvert installation, trenching, bedding, backfill, excavation methods, New Mexico specification organization, drainage structures, stormwater conveyance, urban stormwater systems, One Call excavation coordination, construction terminology, tables, diagrams, specification sections, and reference navigation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports construction safety preparation. Candidates should review OSHA construction standards, hazard recognition, personal protective equipment, excavation safety awareness, equipment-related safety topics, trenching awareness, and jobsite safety requirements connected to curb, gutter, culvert, pipe, and excavation work.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e supports concrete materials preparation. Candidates should review concrete ingredients, mixture design concepts, cement, aggregates, water-cement relationship awareness, admixtures, curing, strength, durability, testing awareness, placement considerations, and concrete performance. GA-3 work often involves concrete curbs, gutters, drainage structures, and related roadway concrete features.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports pipe and underground construction preparation. Candidates should study trenching, pipe installation, bedding, backfill, excavation methods, shoring awareness, site conditions, construction sequencing, equipment awareness, and underground construction practices. Culvert and drainage work often depends on correct excavation, bedding, pipe placement, and backfill practices.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e supports state-specific roadway construction preparation. Candidates should become familiar with specification organization, materials, methods, concrete work, drainage work, pipe and culvert sections, roadway features, earthwork, and state construction terminology. Specification-based questions may require candidates to locate exact language and apply it to a practical field condition.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e supports utility notification and safe excavation coordination preparation. Candidates should review excavation responsibilities, utility notification concepts, locating awareness, safe digging practices, damage prevention, and coordination before excavation. Curb, gutter, and culvert work may involve excavation near existing utilities, so candidates should include this handbook in regular study.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eDesign and Construction of Urban Stormwater Management Systems, 1992\u003c\/strong\u003e supports drainage and stormwater preparation. Candidates should review stormwater conveyance, runoff management, urban drainage systems, culverts, drainage structures, stormwater infrastructure, construction considerations, and how water moves through constructed systems. GA-3 preparation should include the relationship between culverts, gutters, drainage channels, stormwater systems, and roadway infrastructure.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Curbs, Gutters and Culvert Contractor GA-3 examination is an \u003cstrong\u003eopen book test\u003c\/strong\u003e using approved references. Candidates are responsible for bringing their own approved reference materials to the examination center when required by testing instructions. This rental package includes the listed trade references for study, along with business books listed as Includes Lines 2-4 and 6 months of course access.\u003c\/p\u003e\n\n\u003cp\u003eOpen-book testing does not mean candidates can rely on searching the books for the first time during the exam. The most prepared candidates know how each reference is organized before test day. They understand how to use tables of contents, indexes, chapters, specifications, diagrams, tables, safety standards, excavation topics, concrete material sections, stormwater topics, and construction terminology.\u003c\/p\u003e\n\n\u003cp\u003eReference materials must be bound and may be highlighted, underlined, and indexed before the examination session. Permanent tabs are allowed. Temporary tabs, including Post-it notes, are not allowed and must be removed before the exam begins. Reference materials containing writing are not allowed into the examination, and candidates are not permitted to write in the references during the testing session.\u003c\/p\u003e\n\n\u003cp\u003eThis books and courses rental package supports open-book preparation by combining rental references with online course access. Candidates should use the books throughout the 6 months of course access so reference navigation becomes part of regular study. Repeated use of the references helps candidates locate OSHA provisions, concrete mixture topics, pipe and excavation material, New Mexico specification sections, One Call excavation information, and stormwater management guidance more confidently.\u003c\/p\u003e\n\n\u003cp\u003eA strong open-book study routine connects every topic to a book location. When reviewing concrete curbs and gutters, candidates should use the concrete reference and New Mexico specifications. When reviewing culverts or drainage structures, they should use pipe, excavation, stormwater, and New Mexico specification references. When reviewing safe digging and utility coordination, they should use the One Call handbook. When reviewing jobsite safety, they should use OSHA.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eCandidates preparing for the New Mexico Curbs, Gutters and Culvert Contractor GA-3 exam should begin by confirming that the GA-3 classification matches their licensing goal. Curbs, gutters, and culvert work can involve roadway concrete construction, drainage structures, stormwater conveyance, culvert installation, pipe work, excavation, backfill, utility coordination, construction safety, specifications, and construction planning.\u003c\/p\u003e\n\n\u003cp\u003eA practical preparation path includes reviewing the GA-3 exam focus, gathering required information, completing the proper application or approval process when required, scheduling the exam, studying the listed rental references, using the online course, practicing open-book navigation, preparing for any additional required exam, and arriving at the test center with proper identification and approved materials. Candidates should also review all testing instructions before exam day.\u003c\/p\u003e\n\n\u003cp\u003eBecause contractor exams are reference-based, candidates should build a study routine around the actual books, specifications, handbook, and safety standards. Reading general summaries alone is not enough. Candidates should spend time inside the OSHA standards, concrete reference, pipe and excavation reference, New Mexico highway and bridge specifications, New Mexico One Call Excavator Handbook, and urban stormwater management reference.\u003c\/p\u003e\n\n\u003cp\u003eGA-3 questions often contain details that affect the correct answer, such as concrete material condition, curb or gutter construction detail, culvert installation issue, pipe bedding condition, excavation requirement, backfill procedure, utility notification issue, stormwater condition, specification section, drainage structure, or OSHA safety requirement. Candidates should practice identifying the key subject before opening a book. This helps them choose the correct reference and avoid losing time in the wrong section.\u003c\/p\u003e\n\n\u003cp\u003ePreparation should also include steady review of curb, gutter, culvert, concrete, excavation, and stormwater terminology. Many exam questions depend on understanding the wording of the question before locating the answer. Candidates should know how specification language, safety terms, concrete terminology, pipe installation terms, excavation language, and stormwater system concepts affect the correct answer.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eNew Mexico GA-3 curbs, gutters, and culvert preparation requires study of trade references, New Mexico highway specifications, OSHA construction safety, concrete materials, pipe and excavation practices, New Mexico One Call excavation coordination, and urban stormwater management. This rental package includes the listed trade references, business books listed as Includes Lines 2-4, and 6 months of course access.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e is a key state-specific reference for GA-3 preparation. Candidates should become familiar with the structure of the specifications and how material requirements, construction methods, concrete work, drainage work, pipe and culvert requirements, earthwork, and state construction terminology are presented.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e supports New Mexico-specific excavation coordination and safe digging preparation. Candidates should review utility notification concepts, excavator responsibilities, locating awareness, damage prevention, and coordination practices before excavation. This reference is important for work involving trenches, culverts, pipe installation, and roadway excavation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e supports concrete material knowledge for curbs, gutters, concrete drainage features, and related concrete work. \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e supports underground construction preparation, including pipe installation, culverts, trenching, bedding, backfill, and excavation methods.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eDesign and Construction of Urban Stormwater Management Systems, 1992\u003c\/strong\u003e supports stormwater and drainage preparation. Candidates should study stormwater conveyance, drainage structures, runoff management, and urban stormwater infrastructure so they understand how culverts, gutters, and drainage systems support water movement in roadway and site construction.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports construction safety preparation. Candidates should study jobsite safety requirements, hazard recognition, excavation safety awareness, equipment safety, and OSHA topics that connect to curb, gutter, culvert, pipe, and excavation work.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should also use the included business books listed as \u003cstrong\u003eIncludes Lines 2-4\u003c\/strong\u003e when preparing for licensing-related business topics that apply to their path. Exam preparation is only one part of the overall process. Candidates may need to complete application steps, meet eligibility requirements, submit documentation, follow testing instructions, and comply with state or program requirements connected to the GA-3 classification.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Code of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of OSHA construction safety standards, hazard recognition, personal protective equipment, equipment safety, excavation safety awareness, trenching awareness, and jobsite safety requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Design and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of concrete materials, mixture design concepts, cement, aggregates, water-cement relationship awareness, admixtures, curing, strength, durability, testing awareness, placement considerations, and concrete construction performance.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Pipe and Excavation Contracting\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of excavation, trenching, pipe installation, bedding, backfill, jobsite conditions, excavation equipment awareness, shoring awareness, culvert-related construction practices, and underground construction methods.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: New Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of New Mexico highway and bridge construction specifications, materials, methods, concrete work, drainage work, pipe and culvert topics, earthwork, roadway construction, and state construction requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: New Mexico One Call Excavator Handbook\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of utility notification, safe excavation coordination, locating awareness, excavator responsibilities, damage prevention, and safe digging practices in New Mexico.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eIncluded Rental Book: Design and Construction of Urban Stormwater Management Systems, 1992\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference supports study of urban stormwater management, drainage systems, stormwater conveyance, runoff management, culvert and drainage system concepts, stormwater infrastructure, and construction considerations for drainage systems.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBusiness Books Included: Includes Lines 2-4\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThese included business books support broader contractor licensing preparation when business and law study materials apply to the candidate’s licensing path.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThese rental references should be used throughout the 6 months of course access. Candidates should become familiar with the organization of each book, specification, handbook, and standard. Strong reference familiarity helps candidates work more efficiently during open-book testing and reduces the chance of searching in the wrong source during the exam.\u003c\/p\u003e\n\n\u003cp\u003eBecause this package includes both rental books and online course access, candidates should use the course while keeping the books available. The books provide the source material, while the online preparation helps organize review, identify study areas, and build more confident open-book reference navigation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003eNew Mexico GA-3 books and courses rental preparation should focus on both curb, gutter, culvert, concrete, pipe, excavation, and stormwater knowledge and reference navigation. Candidates should study New Mexico highway specifications, OSHA construction safety, concrete materials, pipe and excavation practices, New Mexico One Call excavation coordination, urban stormwater management systems, business books listed as Includes Lines 2-4, and the layout of every included rental reference.\u003c\/p\u003e\n\n\u003cp\u003eConcrete preparation should include \u003cstrong\u003eDesign and Control of Concrete Mixtures, 17th Edition\u003c\/strong\u003e. Candidates should review concrete ingredients, mixture design concepts, water-cement relationship awareness, admixtures, curing, strength, durability, testing awareness, and concrete performance. Concrete knowledge supports preparation for curb, gutter, and related concrete drainage work.\u003c\/p\u003e\n\n\u003cp\u003ePipe and excavation preparation should include \u003cstrong\u003ePipe and Excavation Contracting\u003c\/strong\u003e. Candidates should review trenching, pipe installation, bedding, backfill, excavation equipment awareness, shoring awareness, site conditions, and underground construction sequencing. Culvert work often requires strong understanding of excavation, bedding, pipe placement, and backfill practices.\u003c\/p\u003e\n\n\u003cp\u003eNew Mexico specification preparation should include \u003cstrong\u003eNew Mexico Specifications for Highway and Bridge Construction, 2019\u003c\/strong\u003e. Candidates should review specification organization, materials, methods, concrete work, drainage work, culvert sections, pipe installation, earthwork, roadway construction, and state construction terminology. Specification questions should be answered from exact specification language whenever possible.\u003c\/p\u003e\n\n\u003cp\u003eSafe digging preparation should include \u003cstrong\u003eNew Mexico One Call Excavator Handbook\u003c\/strong\u003e. Candidates should review utility notification, locating awareness, excavator responsibilities, safe digging practices, and damage prevention. This material is especially important for work involving excavation, culverts, trenches, and underground installations.\u003c\/p\u003e\n\n\u003cp\u003eStormwater preparation should include \u003cstrong\u003eDesign and Construction of Urban Stormwater Management Systems, 1992\u003c\/strong\u003e. Candidates should review stormwater conveyance, runoff management, drainage systems, culverts, drainage structures, urban stormwater infrastructure, and construction considerations. Curb, gutter, and culvert work is closely connected to how water moves through roadway and site systems.\u003c\/p\u003e\n\n\u003cp\u003eSafety preparation should include \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e. Candidates should review construction safety standards, hazard recognition, excavation safety awareness, equipment safety, trenching awareness, personal protective equipment, and jobsite safety requirements. Safety questions should be answered from OSHA language when the question points to a federal construction safety requirement.\u003c\/p\u003e\n\n\u003cp\u003eBusiness books listed as \u003cstrong\u003eIncludes Lines 2-4\u003c\/strong\u003e should be used for licensing-related business study when applicable. Candidates should keep technical GA-3 exam preparation organized separately from business and law preparation so they can focus on the right material during each study session.\u003c\/p\u003e\n\n\u003cp\u003eReference navigation should be practiced throughout the 6 months of course access. Candidates should learn how to move from the table of contents to the correct chapter, use indexes effectively, identify specification sections, read diagrams and tables, locate OSHA requirements, review excavation topics, confirm stormwater concepts, and verify exact material before choosing an answer. Practicing with every reference helps candidates become more comfortable with the full set of books.\u003c\/p\u003e\n\n\u003cp\u003eA helpful study routine is to organize topics by construction area. Candidates can study concrete in one session, pipe and excavation in another, New Mexico specifications separately, One Call excavation coordination separately, stormwater systems in another session, OSHA safety separately, and business materials in a separate review. After each topic review, candidates should practice locating the applicable sections in the correct reference.\u003c\/p\u003e\n\n\u003cp\u003eThe most effective open-book preparation combines familiarity, repetition, and careful reading. Candidates should know where major curb, gutter, culvert, concrete, excavation, stormwater, and specification topics are located, how the references explain them, and how to confirm answers from the books. This books and courses rental package is designed to make that process more organized through rental references and online course access.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps candidates prepare with organized, trade-focused support designed around the way open-book contractor exams are actually taken. For the New Mexico Curbs, Gutters and Culvert Contractor GA-3 exam, preparation is not only about having the listed books. It is about learning how to use those references, recognize key terms, locate sections quickly, and apply concrete, pipe, excavation, stormwater, OSHA, New Mexico specification, and safe digging knowledge with confidence.\u003c\/p\u003e\n\n\u003cp\u003eThis books and courses rental package supports candidates through rental references, 6 months of course access, organized study guidance, trade-focused review, practice-oriented preparation, business books listed as Includes Lines 2-4, and reference navigation. Students can focus their review on curb and gutter construction, culvert installation, concrete materials, pipe and excavation, New Mexico highway specifications, New Mexico One Call excavation coordination, OSHA construction safety, urban stormwater management, business preparation materials, and open-book reference use.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep’s approach is practical and exam-oriented. The goal is to help candidates reduce confusion, organize their study routine, and build confidence through repeated reference navigation and trade-focused review. Candidates still need to study consistently and understand the material, but having the rental references and course access together can make the preparation process more manageable and focused.\u003c\/p\u003e\n\n\u003cp\u003eMany GA-3 candidates have concrete, curb, gutter, culvert, excavation, drainage, pipe installation, stormwater, roadway, utility coordination, or field experience but are less familiar with moving through several references under exam pressure. 1 Exam Prep helps support that transition by encouraging reference familiarity, organized study habits, practice-oriented preparation, and a clearer plan for exam-day book navigation.\u003c\/p\u003e\n\n\u003cp\u003eThe course structure also helps candidates avoid common study problems. Instead of focusing only on familiar field topics, candidates are encouraged to review the full reference set. Instead of assuming an answer from experience, candidates practice confirming answers from specifications, safety standards, manuals, and technical references. Instead of waiting until the exam to learn the books, candidates build reference navigation into their study routine from the beginning.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is included in this Books \u0026amp; Courses Rental Package?\u003c\/h2\u003e\n\u003cp\u003eThis package includes rental access to Code of Federal Regulations - 29 CFR Part 1926 (OSHA); Design and Control of Concrete Mixtures, 17th Edition; Pipe and Excavation Contracting; New Mexico Specifications for Highway and Bridge Construction, 2019; New Mexico One Call Excavator Handbook; and Design and Construction of Urban Stormwater Management Systems, 1992. It also includes business books listed as Includes Lines 2-4 and 6 months of course access.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the price of this rental package?\u003c\/h2\u003e\n\u003cp\u003eThe package price is \u003cstrong\u003e$1,110\u003c\/strong\u003e, plus a \u003cstrong\u003e$500 refundable deposit\u003c\/strong\u003e, for a \u003cstrong\u003etotal of $1,610\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long is the course access?\u003c\/h2\u003e\n\u003cp\u003eThis package includes \u003cstrong\u003e6 months of course access\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long should I allow for this order?\u003c\/h2\u003e\n\u003cp\u003ePlease allow up to \u003cstrong\u003e15 business days\u003c\/strong\u003e for book \u0026amp; course rental package orders.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs this package for the New Mexico GA-3 exam?\u003c\/h2\u003e\n\u003cp\u003eYes. This package is designed for candidates preparing for the New Mexico Curbs, Gutters and Culvert Contractor GA-3 exam using the listed concrete, pipe, excavation, OSHA, One Call, stormwater, and New Mexico highway specification references.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the New Mexico GA-3 exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The exam is an open-book test using approved references. Candidates should bring only approved materials and follow all testing center rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy is reference navigation important?\u003c\/h2\u003e\n\u003cp\u003eReference navigation is important because the exam is open book. Candidates should know how to locate concrete material guidance, pipe and excavation topics, OSHA requirements, New Mexico specification language, One Call information, and stormwater concepts quickly.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package include business books?\u003c\/h2\u003e\n\u003cp\u003eYes. Business books are included and listed as Includes Lines 2-4.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I write notes in my references for the exam?\u003c\/h2\u003e\n\u003cp\u003eReference materials containing writing are not allowed into the examination, and candidates are not permitted to write in the references during the testing session. Highlighting, underlining, indexing, and permanent tabs are allowed.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo product can guarantee an exam result. This package supports candidates through rental references, course access, organized trade review, practice-oriented preparation, business materials, and open-book reference navigation.\u003c\/p\u003e","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":46094674001977,"sku":null,"price":1610.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/NM-CURBSCULVERTS-RENTAL.jpg?v=1782842578","url":"https:\/\/1examprep.com\/products\/new-mexico-curbs-gutters-and-culvert-contractor-ga-3-books-courses-rental-package","provider":"1 Exam Prep","version":"1.0","type":"link"}