{"product_id":"new-mexico-framing-contractor-gs-13-highlighted-tabbed-book-package","title":"New Mexico Framing Contractor (GS-13) Highlighted \u0026 Tabbed Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eNew Mexico Framing Contractor (GS-13) Highlighted \u0026amp; Tabbed Book Package\u003c\/h1\u003e\n\n\u003cp\u003eThe New Mexico Framing Contractor (GS-13) Highlighted \u0026amp; Tabbed Book Package is designed for candidates preparing for the New Mexico GS-13 contractor exam who want a more organized way to study and use the approved references. This package includes the \u003cstrong\u003eNew Mexico Commercial Building Code (NMAC 14.7.2), 2021\u003c\/strong\u003e, \u003cstrong\u003eNew Mexico Residential Building Code (NMAC 14.7.3), 2021\u003c\/strong\u003e, \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e, \u003cstrong\u003eInternational Residential Code for One- and Two-Family Dwellings, 2021\u003c\/strong\u003e, \u003cstrong\u003eCarpentry and Building Construction, 2016\u003c\/strong\u003e, and \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eFraming work is one of the most important parts of building construction. A framing contractor must understand how structural components work together, how loads are transferred, how walls, floors, roofs, openings, bracing, and fasteners are installed, and how framing requirements connect to residential and commercial building codes. Candidates preparing for the GS-13 exam should study both code-based requirements and practical carpentry knowledge because framing questions can involve field methods, safety, and code compliance.\u003c\/p\u003e\n\n\u003cp\u003eThis highlighted and tabbed book package helps candidates study with references that are easier to navigate. The tabs help organize major sections of the books, while the highlighting draws attention to important provisions, definitions, tables, framing requirements, construction guidance, and safety rules. For an open-book contractor exam, the goal is not only to own the correct references. Candidates must also know how to use the books efficiently under time pressure.\u003c\/p\u003e\n\n\u003cp\u003eThe reference list combines New Mexico building code references, national model building codes, a practical carpentry and construction reference, and OSHA construction safety regulations. Together, these books support preparation for framing-related topics such as floor systems, wall framing, roof framing, structural openings, headers, bracing, sheathing, stairs, fastening, materials, residential code provisions, commercial code provisions, and jobsite safety.\u003c\/p\u003e\n\n\u003cp\u003ePlease allow up to \u003cstrong\u003e15 business days\u003c\/strong\u003e for tabbed and highlighted book package orders. These packages require preparation time before shipment so the references can be organized and made ready for study use.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Framing Contractor (GS-13) exam is part of the New Mexico contractor examination process. Candidates must be approved before scheduling the required examination. Once eligibility is granted, candidates can schedule the exam through the approved testing process and complete the test as directed by the testing agency.\u003c\/p\u003e\n\n\u003cp\u003eThe GS-13 exam is focused on framing contractor knowledge, building code requirements, carpentry practices, residential and commercial construction, and jobsite safety. Candidates should prepare to work with construction references, building codes, OSHA regulations, and practical carpentry materials. The approved references supplied in this package show that preparation should include framing systems, floors, walls, roofs, openings, structural supports, bracing, sheathing, fasteners, New Mexico building code provisions, model code requirements, and OSHA construction safety rules.\u003c\/p\u003e\n\n\u003cp\u003eThis exam should be approached as both a trade knowledge test and a reference navigation test. Questions may require candidates to identify safe work practices, interpret construction terminology, locate code provisions, understand framing systems, recognize proper installation methods, or apply code requirements to framing conditions. Candidates should study the structure of each reference and practice locating information before exam day.\u003c\/p\u003e\n\n\u003cp\u003eFraming work affects the performance and safety of the entire building. Poor framing can affect structural support, roof performance, wall alignment, load transfer, openings, bracing, and the installation of other trades. Candidates should understand how framing details connect to foundations, floors, walls, roofs, stairs, sheathing, and exterior assemblies.\u003c\/p\u003e\n\n\u003cp\u003eBecause framing contractors may work on both residential and commercial projects, preparation should include the New Mexico Residential Building Code, New Mexico Commercial Building Code, International Residential Code, and International Building Code. These references help candidates understand how framing requirements appear in model codes and how New Mexico provisions may affect construction in the state.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Framing Contractor (GS-13) examination is treated as an \u003cstrong\u003eopen book test\u003c\/strong\u003e using approved references. Candidates are responsible for bringing their own approved materials to the examination center when required by the testing instructions. This highlighted and tabbed package includes the listed references for GS-13 preparation.\u003c\/p\u003e\n\n\u003cp\u003eOpen-book testing still requires serious preparation. The references in this package are detailed, and the exam environment is timed. Candidates who are unfamiliar with the books may lose valuable time searching for answers. Candidates who have practiced with their references can move more confidently between chapters, tables, definitions, construction details, framing diagrams, building code provisions, and OSHA safety rules.\u003c\/p\u003e\n\n\u003cp\u003eReference materials must be bound and may be highlighted, underlined, and indexed before the examination session. Permanent tabs are allowed. Temporary tabs, including Post-it notes, are not allowed and must be removed before the exam begins. Reference materials containing writing are not allowed into the examination, and candidates are not permitted to write in the references during the testing session.\u003c\/p\u003e\n\n\u003cp\u003eThis highlighted and tabbed package supports the open-book format by helping candidates organize their study references in a practical way. The tabs help candidates return to major subject areas, while the highlighting helps draw attention to key provisions and commonly reviewed material. Candidates should still study consistently, practice reference lookup, and become familiar with the organization of each book before the exam.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eCandidates pursuing the New Mexico Framing Contractor GS-13 classification should begin by reviewing the state contractor licensing process and identifying the correct classification. The GS-13 classification is associated with framing contractor work, so candidates should make sure they are applying for the proper license type and examination.\u003c\/p\u003e\n\n\u003cp\u003eA practical preparation path includes identifying the correct GS-13 classification, completing the required application or qualifying party approval process, receiving examination eligibility, scheduling the required exam, reviewing the approved reference list, studying consistently, and arriving at the testing center with proper identification and approved materials.\u003c\/p\u003e\n\n\u003cp\u003eContractor candidates may also need to satisfy the Business and Law requirement as part of the New Mexico contractor licensing process. Candidates should review their full licensing path so they understand the trade examination, business requirement, application, documentation, experience, financial, bonding, registration, and administrative steps connected to the license.\u003c\/p\u003e\n\n\u003cp\u003eAfter passing the required examination, candidates should complete any remaining New Mexico contractor licensing requirements. Passing the GS-13 exam is an important step, but candidates are still responsible for meeting all applicable requirements before a license can be issued or maintained.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should keep application documents, eligibility notices, exam scheduling confirmations, reference lists, score reports, and licensing correspondence organized. Good recordkeeping helps reduce confusion and allows candidates to focus more attention on preparation and the remaining licensing steps.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eNew Mexico contractor licensing is connected to the Construction Industries Division of the New Mexico Regulation and Licensing Department. Contractors performing framing work must understand applicable building code requirements, construction safety rules, trade practices, and structural concepts that affect framed construction in New Mexico.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003eNew Mexico Commercial Building Code (NMAC 14.7.2), 2021\u003c\/strong\u003e and the \u003cstrong\u003eNew Mexico Residential Building Code (NMAC 14.7.3), 2021\u003c\/strong\u003e are important because they contain state-specific building code provisions and amendments. Candidates should study these references alongside the \u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e and the \u003cstrong\u003eInternational Residential Code for One- and Two-Family Dwellings, 2021\u003c\/strong\u003e to understand both model code requirements and New Mexico-specific code provisions.\u003c\/p\u003e\n\n\u003cp\u003eFraming work may involve residential dwellings, commercial buildings, interior and exterior walls, floors, roofs, structural openings, stairs, braced wall lines, sheathing, blocking, fireblocking, and connections. Candidates should be comfortable using building code references to locate requirements that affect framing and the systems connected to it.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e supports preparation for construction safety topics such as fall protection, ladders, scaffolds, personal protective equipment, hazard communication, hand and power tools, material handling, and jobsite hazard control. Framing work often involves elevated work, cutting, lifting, fastening, bracing, and temporary construction conditions, so safety knowledge is essential.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNew Mexico Commercial Building Code (NMAC 14.7.2), 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference contains New Mexico commercial building code provisions and amendments. It supports preparation for commercial building code questions involving framing, structural systems, wall assemblies, roof systems, openings, materials, and state-specific code provisions.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNew Mexico Residential Building Code (NMAC 14.7.3), 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference contains New Mexico residential building code provisions and amendments. It supports preparation for residential framing requirements, wall framing, floor framing, roof framing, bracing, sheathing, openings, stairs, and state-specific residential code requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eInternational Building Code, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2021 IBC supports study of commercial building code requirements, construction types, structural systems, materials, wall and roof assemblies, openings, fire-resistance-related provisions, and code requirements that may apply to commercial framing work.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eInternational Residential Code for One- and Two-Family Dwellings, 2021\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2021 IRC supports study of residential construction requirements, including floor framing, wall framing, roof framing, braced wall lines, headers, openings, sheathing, stairs, decks, fireblocking, and residential code provisions for one- and two-family dwellings.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCarpentry and Building Construction, 2016\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference supports study of carpentry tools, building materials, layout, framing methods, floor systems, wall systems, roof systems, stairs, exterior finishes, interior construction, construction drawings, estimating concepts, and practical building methods.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCode of Federal Regulations - 29 CFR Part 1926 (OSHA)\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis highlighted and tabbed reference contains OSHA construction safety regulations. It supports preparation for safety questions involving fall protection, ladders, scaffolds, personal protective equipment, hazard communication, tools, material handling, and general jobsite safety requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eEach reference in this package supports a different part of GS-13 exam preparation. The New Mexico building codes support state-specific residential and commercial code requirements. The IBC and IRC support model building code requirements. Carpentry and Building Construction supports practical framing, layout, materials, and construction knowledge. OSHA supports construction safety preparation.\u003c\/p\u003e\n\n\u003cp\u003eThe highlighted and tabbed format helps make the books easier to use during study sessions. Candidates can use the tabs to return to major subject areas and use the highlighting to focus attention on important code language and construction concepts. A useful study approach is to divide preparation into OSHA safety, New Mexico code requirements, IBC requirements, IRC requirements, floor framing, wall framing, roof framing, bracing, sheathing, headers, openings, stairs, fastening, layout, and jobsite practices.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003eThe New Mexico Framing Contractor (GS-13) exam requires preparation across code, safety, and trade references. Candidates should study the approved references as a complete set rather than treating each book as separate and unrelated. Framing construction involves materials, layout, structural support, connections, fasteners, bracing, safety, code compliance, and coordination with other building systems.\u003c\/p\u003e\n\n\u003cp\u003eFloor framing should be a major part of the study plan. Candidates should review joists, beams, girders, subflooring, bearing, spans, openings, blocking, bridging, connections, and load paths. Floor framing must support loads and transfer them properly to the foundation or supporting structure, so candidates should understand both practical installation methods and code organization.\u003c\/p\u003e\n\n\u003cp\u003eWall framing should also receive careful attention. Candidates should study studs, plates, headers, openings, corners, intersections, braced wall panels, sheathing, blocking, fireblocking, cripple studs, king studs, jack studs, and anchorage. Wall framing questions may require candidates to recognize proper framing methods or locate code provisions related to residential or commercial wall construction.\u003c\/p\u003e\n\n\u003cp\u003eRoof framing is another important subject area. Candidates should review rafters, ridge boards, ceiling joists, collar ties, roof trusses, roof sheathing, overhangs, load transfer, bracing, fastening, and roof geometry. Roof framing affects structural support, roof covering performance, ventilation, ceiling construction, and the overall stability of the building.\u003c\/p\u003e\n\n\u003cp\u003eOpenings and headers should be studied carefully. Doors, windows, garage openings, and other structural openings must be framed to support loads around the opening. Candidates should understand how headers, trimmers, king studs, bearing, fastening, and support conditions work together.\u003c\/p\u003e\n\n\u003cp\u003eBracing and sheathing should be included in the study plan because they help resist lateral forces and support structural performance. Candidates should review braced wall lines, wall sheathing, roof sheathing, panel layout, nailing, blocking, and fastening patterns. Bracing-related questions may require careful code navigation and attention to construction details.\u003c\/p\u003e\n\n\u003cp\u003eStairs and related framing details may also appear in preparation materials. Candidates should review stair layout, risers, treads, landings, headroom, stringers, guards, handrails, and structural support. Stair framing combines layout skill with code requirements, so candidates should study both practical carpentry guidance and code provisions.\u003c\/p\u003e\n\n\u003cp\u003eResidential code study should include framing requirements for one- and two-family dwellings, including floors, walls, roofs, bracing, sheathing, fireblocking, openings, and stairs. The IRC and New Mexico Residential Building Code support preparation for residential framing conditions.\u003c\/p\u003e\n\n\u003cp\u003eCommercial code study should include building code requirements from the IBC and New Mexico Commercial Building Code that affect framing, structural systems, construction types, walls, roofs, openings, and materials. Commercial work may involve different code organization and requirements than residential construction, so candidates should practice using both model and state references.\u003c\/p\u003e\n\n\u003cp\u003eOSHA safety preparation should be part of every contractor exam study plan. Candidates should review fall protection, ladders, scaffolds, personal protective equipment, hazard communication, material handling, tools, housekeeping, and jobsite hazard recognition. Framing contractors often work at heights, handle heavy materials, use saws and nailers, and work around temporary structural conditions, making safety knowledge essential.\u003c\/p\u003e\n\n\u003cp\u003eCandidates should also practice reference navigation. A framing method question may point to Carpentry and Building Construction. A safety question may point to OSHA. A residential code question may point to the IRC or New Mexico Residential Building Code. A commercial code question may point to the IBC or New Mexico Commercial Building Code. The ability to identify the likely reference quickly is a key part of open-book exam preparation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps candidates prepare with organized, trade-focused support designed around the way open-book contractor exams are actually taken. For the New Mexico Framing Contractor (GS-13) exam, preparation is not only about owning the correct references. It is about learning how to use those references, recognize key terms, locate sections quickly, and apply framing knowledge with confidence.\u003c\/p\u003e\n\n\u003cp\u003eThis highlighted and tabbed book package supports that preparation by providing the listed references in a more organized study format. Candidates can use the books to review New Mexico building codes, IBC requirements, IRC requirements, carpentry methods, floor framing, wall framing, roof framing, bracing, sheathing, openings, stairs, layout, fastening, and OSHA construction safety requirements.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep’s approach is practical and exam-oriented. The goal is to help candidates reduce confusion, organize their preparation, and build confidence through repeated reference navigation and trade-focused review. Candidates still need to study consistently and understand the material, but highlighted and tabbed references can make the study process more manageable.\u003c\/p\u003e\n\n\u003cp\u003eMany GS-13 candidates have framing or construction experience but are less familiar with moving through multiple code books and trade references under exam pressure. 1 Exam Prep helps support that transition by encouraging structured study, reference familiarity, and practice-oriented preparation. With consistent effort, candidates can improve pacing, strengthen construction knowledge, and approach the New Mexico GS-13 exam with a clearer plan.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFAQ\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat books are included in this package?\u003c\/h2\u003e\n\u003cp\u003eThis package includes the New Mexico Commercial Building Code, New Mexico Residential Building Code, 2021 International Building Code, 2021 International Residential Code, Carpentry and Building Construction, 2016, and OSHA 29 CFR Part 1926.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eAre the books highlighted and tabbed?\u003c\/h2\u003e\n\u003cp\u003eYes. This package is prepared as a highlighted and tabbed book package to support more organized study and faster reference navigation.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long does it take to receive this package?\u003c\/h2\u003e\n\u003cp\u003ePlease allow up to 15 business days for tabbed and highlighted book package orders. Preparation time is required before shipment.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the New Mexico GS-13 exam open book?\u003c\/h2\u003e\n\u003cp\u003eYes. The New Mexico Framing Contractor (GS-13) exam is treated as an open-book test using approved references. Candidates should bring only approved materials and follow all testing center rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy is OSHA included in this package?\u003c\/h2\u003e\n\u003cp\u003eOSHA 29 CFR Part 1926 contains federal construction safety regulations. Framing contractors should understand jobsite safety topics such as fall protection, ladders, scaffolds, PPE, hazard communication, tool safety, and material handling.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy are both residential and commercial codes included?\u003c\/h2\u003e\n\u003cp\u003eThe GS-13 reference list includes New Mexico residential and commercial building codes along with the IBC and IRC. Candidates should study both residential and commercial code references because framing work can occur in different building settings.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhy is Carpentry and Building Construction included?\u003c\/h2\u003e\n\u003cp\u003eCarpentry and Building Construction supports preparation for framing methods, layout, building materials, floor systems, wall systems, roof systems, stairs, construction drawings, and practical carpentry knowledge.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat topics should I study for the GS-13 exam?\u003c\/h2\u003e\n\u003cp\u003eCandidates should study floor framing, wall framing, roof framing, bracing, sheathing, headers, openings, stairs, fastening, layout, residential code requirements, commercial code requirements, and OSHA safety rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan highlighted and tabbed references be used during the exam?\u003c\/h2\u003e\n\u003cp\u003eReference materials may be highlighted, underlined, and indexed before the examination session. Permanent tabs are allowed. Temporary tabs, including Post-it notes, are not allowed.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes this package guarantee a passing score?\u003c\/h2\u003e\n\u003cp\u003eNo product can guarantee an exam result. This package provides the listed highlighted and tabbed reference books and supports candidates as they prepare through code-focused and trade-focused study.\u003c\/p\u003e\n","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":45973844918329,"sku":null,"price":995.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/NM-FRAMING-HT.jpg?v=1782493209","url":"https:\/\/1examprep.com\/products\/new-mexico-framing-contractor-gs-13-highlighted-tabbed-book-package","provider":"1 Exam Prep","version":"1.0","type":"link"}