{"product_id":"washington-door-gate-similar-systems-administrator-book-package","title":"Washington Door, Gate \u0026 Similar Systems Administrator Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eWashington Door, Gate \u0026amp; Similar Systems Administrator Book Package\u003c\/h1\u003e\n\n\u003cp\u003ePrepare for the Washington Door, Gate \u0026amp; Similar Systems Administrator examination with a focused reference package built around the electrical code, Washington electrical law, and state administrative rules used for the \u003cstrong\u003e10 Door, Gate \u0026amp; Similar Systems specialty\u003c\/strong\u003e. This package includes the \u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e, \u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e, and the \u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eWashington identifies this specialty as \u003cstrong\u003e10 Door, Gate \u0026amp; Similar Systems\u003c\/strong\u003e. The classification covers defined electrical operator wiring and equipment associated with electric gates, doors, windows, awnings, movable partitions, curtains, and similar electrically operated systems. It includes low-voltage operator systems, qualifying branch circuits originating at listed operator control panels, certain line-voltage reconnections, operator controls, sensing equipment, and related electrical components.\u003c\/p\u003e\n\n\u003cp\u003eThe Washington Door, Gate \u0026amp; Similar Systems Administrator examination combines National Electrical Code knowledge, general electrical theory, and Washington electrical laws and rules. Candidates should be prepared for technical questions involving wiring and protection, overcurrent protection, grounding and bonding, wiring methods, electrical equipment, motors and related equipment, hazardous locations, special occupancies, special conditions, and general electrical theory.\u003c\/p\u003e\n\n\u003cp\u003eThe Washington Codes portion focuses on administrator responsibilities, contractor requirements, certification, examinations, permits, inspections, and the legal limits of specialty 10 work. Because an administrator helps ensure that an electrical contractor complies with Washington laws and rules, understanding the exact boundaries of the specialty is an important part of examination preparation.\u003c\/p\u003e\n\n\u003cp\u003eThe examination is \u003cstrong\u003eopen book\u003c\/strong\u003e. Approved references may be used during testing, which makes familiarity with the NEC, RCW Chapter 19.28, and WAC Chapter 296-46B especially valuable. Candidates should practice deciding which reference contains the controlling requirement and navigating directly to the applicable provision.\u003c\/p\u003e\n\n\u003cp\u003eThe Door, Gate \u0026amp; Similar Systems specialty contains specific limits involving voltage, amperage, operator control panels, branch circuits, conductor length, line-voltage reconnection, low-voltage Class 2 systems, and work in classified locations. Understanding these limits can help candidates prepare for Washington Codes questions and understand the contractor scope associated with the administrator credential.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eWashington electrical law covering administrators, electricians, electrical contractors, certification, electrical installations, enforcement, responsibilities, and other statutory requirements affecting electrical work throughout the state.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eWashington's detailed electrical safety, administrator, contractor, examination, specialty-scope, permit, inspection, certification, and installation rules. This reference defines and regulates the 10 Door, Gate \u0026amp; Similar Systems specialty.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC edition used for the Washington electrical examination program covered by this package. It provides technical requirements involving wiring and protection, grounding and bonding, wiring methods, electrical equipment, motors, special occupancies, special conditions, and related operator systems.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eThe Washington \u003cstrong\u003e10 Door, Gate \u0026amp; Similar Systems Electrical Administrator\u003c\/strong\u003e examination contains two required sections: \u003cstrong\u003eNEC \u0026amp; Theory\u003c\/strong\u003e and \u003cstrong\u003eWashington Codes\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNEC \u0026amp; Theory:\u003c\/strong\u003e Approximately 30 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed for NEC \u0026amp; Theory:\u003c\/strong\u003e Approximately 2 hours\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Codes:\u003c\/strong\u003e Approximately 17 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed for Washington Codes:\u003c\/strong\u003e Approximately 1 hour\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Questions:\u003c\/strong\u003e Approximately 47 questions across both sections\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Testing Time:\u003c\/strong\u003e Approximately 3 hours across both sections\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePassing Score:\u003c\/strong\u003e 70% or greater on each required examination section\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExam Type:\u003c\/strong\u003e Open book\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTesting Provider:\u003c\/strong\u003e PSI\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrimary Code Reference:\u003c\/strong\u003e National Electrical Code, NEC, 2020 Edition\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe NEC \u0026amp; Theory portion emphasizes electrical concepts that support safe installation and operation of powered door, gate, and similar systems. Candidates should review general NEC requirements, overcurrent protection, grounding and bonding, wiring methods, electrical equipment, motors and controllers, special occupancies, special conditions, hazardous-location concepts, and general trade knowledge.\u003c\/p\u003e\n\n\u003cp\u003eThe Washington Codes section includes questions involving RCW Chapter 19.28 and WAC Chapter 296-46B. Candidates should study administrator responsibilities, contractor assignments, permits, inspections, specialty limitations, examination requirements, certification, and the specific electrical work included within the Door, Gate \u0026amp; Similar Systems classification.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe Washington Door, Gate \u0026amp; Similar Systems Administrator examination is an \u003cstrong\u003eopen book test\u003c\/strong\u003e. Approved reference materials may be used at the testing center under Washington electrical examination rules.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e may be used during testing. Permanent index tabs are permitted, while removable tabs, sticky notes, repositionable notes, and handwritten notes are prohibited. Original copyrighted reference materials may contain highlighting, underlining, and permanent index tabs when they otherwise comply with examination requirements.\u003c\/p\u003e\n\n\u003cp\u003ePrinted copies of \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e and \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e may also be used during the examination when prepared according to Washington testing requirements.\u003c\/p\u003e\n\n\u003cp\u003eOpen-book testing rewards familiarity rather than simply having the books available. Candidates should know where to find grounding and bonding rules, motor and controller requirements, wiring methods, overcurrent protection provisions, Class 2 system requirements, administrator rules, and the Washington specialty definition.\u003c\/p\u003e\n\n\u003cp\u003eA useful preparation approach is to practice identifying the likely reference before beginning a lookup. A technical question about motors, conductors, grounding, or control circuits will generally point toward the NEC. A question about contractor authority, administrator duties, specialty limits, permits, or inspections will generally require the RCW or WAC.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eWashington Electrical Administrator certification is administered through the \u003cstrong\u003eWashington State Department of Labor \u0026amp; Industries\u003c\/strong\u003e, with examinations administered through PSI.\u003c\/p\u003e\n\n\u003col\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSelect the Door, Gate \u0026amp; Similar Systems Administrator classification.\u003c\/strong\u003e The applicable Washington specialty is classification 10.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRegister directly with PSI.\u003c\/strong\u003e Electrical Administrator candidates do not require prior L\u0026amp;I examination approval before scheduling.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for NEC \u0026amp; Theory.\u003c\/strong\u003e Study the 2020 NEC with emphasis on wiring methods, grounding and bonding, overcurrent protection, motors, equipment, controls, and general electrical theory.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for Washington Codes.\u003c\/strong\u003e Study RCW Chapter 19.28 and WAC Chapter 296-46B, including administrator responsibilities, contractor licensing, specialty scope, permits, inspections, and examinations.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTake the required examination sections.\u003c\/strong\u003e The first examination attempt begins the applicable one-year examination period.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePass each section with at least 70%.\u003c\/strong\u003e NEC \u0026amp; Theory and Washington Codes must each be passed independently.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete all required sections during the examination period.\u003c\/strong\u003e Passed sections remain valid during the active examination period.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eApply for the Administrator certificate.\u003c\/strong\u003e After passing all required sections, submit the required materials to Washington Labor \u0026amp; Industries.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSubmit certification materials within 90 days.\u003c\/strong\u003e The required application materials should be received within 90 days of the final passing score.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete the contractor assignment process when applicable.\u003c\/strong\u003e A specialty administrator may be assigned to a contractor holding the corresponding electrical specialty.\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eWashington identifies Door, Gate \u0026amp; Similar Systems as electrical specialty classification \u003cstrong\u003e10\u003c\/strong\u003e. There are \u003cstrong\u003eno electrical work-experience prerequisites for taking the Electrical Administrator examination\u003c\/strong\u003e. Administrator applicants may register directly for testing without first qualifying through an electrician work-experience pathway.\u003c\/p\u003e\n\n\u003cp\u003eAn Electrical Administrator certificate by itself does not authorize a person to perform electrical installation work with the tools of the trade. Anyone personally performing electrical work must separately hold the appropriate Washington electrician certification.\u003c\/p\u003e\n\n\u003cp\u003eA specialty administrator may be assigned only to an electrical contractor holding the corresponding specialty. A Door, Gate \u0026amp; Similar Systems Administrator therefore provides administrative coverage for a contractor authorized for specialty 10 work rather than unrestricted general electrical work.\u003c\/p\u003e\n\n\u003cp\u003eThe specialty covers the installation, service, maintenance, repair, and replacement of qualifying \u003cstrong\u003edoor, gate, and similar-system electrical operator wiring and equipment\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eQualifying systems include electric gates, doors, windows, awnings, movable partitions, curtains, and similar electrically operated systems.\u003c\/p\u003e\n\n\u003cp\u003eRelated equipment can include operator controls and devices such as push buttons, key switches, keypads, pull cords, air or electric treadles, sensing edges, photoelectric devices, loop detectors, motion detectors, remote radios and receivers, antennas, timers, lockout switches, stand-alone release devices, annunciators, control panels, wiring, and associated conductor terminations.\u003c\/p\u003e\n\n\u003cp\u003eThe specialty includes qualifying \u003cstrong\u003eNEC Class 2 low-voltage operator systems\u003c\/strong\u003e when the door, gate, or similar-system operator is not connected to other systems outside the permitted specialty scope.\u003c\/p\u003e\n\n\u003cp\u003eThe classification may also include branch circuits originating within a \u003cstrong\u003elisted door, gate, or similar-system electric operator control panel\u003c\/strong\u003e when those branch circuits supply only qualifying system components.\u003c\/p\u003e\n\n\u003cp\u003eThese qualifying branch circuits are limited to a maximum of \u003cstrong\u003e600 volts and 20 amperes\u003c\/strong\u003e. The component supplied by the branch circuit must meet the conditions established by Washington rules, including applicable location requirements relative to the listed control panel.\u003c\/p\u003e\n\n\u003cp\u003eThe specialty also permits certain line-voltage reconnections to a listed operator control panel. The characteristics of the existing branch circuit or feeder cannot be modified, the circuit or feeder cannot exceed \u003cstrong\u003e600 volts and 20 amperes\u003c\/strong\u003e, and the conductor or conduit extending from the applicable disconnecting means or junction box is limited to \u003cstrong\u003esix feet\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe classification does not authorize unrestricted installation, repair, or replacement of line-voltage branch-circuit conductors, services, feeders, panelboards, or disconnect switches supplying the operator control panel.\u003c\/p\u003e\n\n\u003cp\u003eThe specialty also does not include electrical work governed by the NEC classified-location provisions specifically excluded under Washington rules. Electrical installations in hazardous locations may require another appropriate electrical classification.\u003c\/p\u003e\n\n\u003cp\u003eUnderstanding these limitations is particularly important for an administrator because the administrator helps ensure that an electrical contractor performs only work authorized by its license and complies with Washington electrical laws, rules, permit requirements, and inspection requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains Washington electrical statutes governing Electrical Administrators, electricians, contractors, certification, electrical installations, enforcement, and other legal responsibilities within the state's electrical licensing system.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains Washington rules governing electrical administrator certification, contractor assignments, specialty classifications, examinations, permits, inspections, and the detailed scope of Door, Gate \u0026amp; Similar Systems work.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC provides technical requirements involving wiring methods, grounding and bonding, overcurrent protection, electrical equipment, motors, controls, special occupancies, special conditions, and related electrical installations.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eCandidates should study these three references as an integrated set. The NEC addresses technical installation requirements, while the RCW and WAC define Washington-specific licensing, contractor, administrator, and specialty-scope requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2020 NEC is permitted during the Washington electrical examination covered by this package. Permanent index tabs, highlighting, and underlining are permitted when they comply with examination rules, while handwritten notes and removable tabs are prohibited.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003ePrinted copies of Washington electrical law may be used during testing when prepared according to applicable examination requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003ePrinted copies of Washington electrical rules may be used during testing when prepared according to the applicable examination requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eUsing these references during practice can help candidates become familiar with NEC article organization, Washington rule numbering, specialty definitions, contractor requirements, and administrator responsibilities before examination day.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eWiring Methods:\u003c\/strong\u003e Review conductors, cables, raceways, boxes, fittings, flexible wiring methods, conductor protection, support requirements, and wiring associated with door and gate operator systems.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOvercurrent Protection:\u003c\/strong\u003e Study circuit breakers, fuses, equipment ratings, conductor protection, and branch-circuit overcurrent requirements affecting listed operator control panels and system components.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eGrounding and Bonding:\u003c\/strong\u003e Review equipment grounding conductors, bonding requirements, grounding continuity, enclosures, raceways, operator equipment, and grounding of associated electrical components.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eMotors and Controls:\u003c\/strong\u003e Powered doors and gates frequently use motors, control panels, relays, sensors, switches, and other control devices. Review motor circuits, controllers, overload protection, disconnecting means, and related NEC requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eClass 2 Systems:\u003c\/strong\u003e Review NEC Class 2 circuit requirements and understand how Washington includes certain low-voltage operator systems within specialty 10.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSpecial Conditions:\u003c\/strong\u003e Study applicable NEC special-condition requirements and understand how operator systems may interface with other electrical systems.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eHazardous Locations:\u003c\/strong\u003e Review general classified-location concepts and understand that specialty 10 does not provide authority for the hazardous-location work specifically excluded by Washington rules.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eGeneral Trade Knowledge and Theory:\u003c\/strong\u003e Practice voltage, current, resistance, power, Ohm's law, motors, controls, series and parallel circuits, troubleshooting principles, and other electrical fundamentals.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSpecialty Limits:\u003c\/strong\u003e Know the 600-volt and 20-ampere limits that apply to qualifying branch circuits and reconnections, the six-foot conductor or conduit limitation for qualifying line-voltage reconnections, and the restrictions on branch circuits, feeders, services, panelboards, and disconnect switches.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOperator Equipment:\u003c\/strong\u003e Review the functions of control panels, push buttons, keypads, key switches, loop detectors, photoelectric devices, motion sensors, sensing edges, receivers, timers, and other components commonly used with powered door and gate systems.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eAdministrator Responsibilities:\u003c\/strong\u003e Study administrator certification, contractor assignments, permits, inspections, compliance responsibilities, examinations, and the distinction between administrator authority and electrician certification.\u003c\/p\u003e\n\n\u003cp\u003eA practical study routine is to separate technical questions from Washington regulatory questions. NEC questions generally focus on how electrical systems must be installed or protected. Washington Codes questions often focus on who may perform the work, what the specialty allows, what the administrator is responsible for, and when permits or inspections are required.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps Washington Door, Gate \u0026amp; Similar Systems Administrator candidates organize preparation around the three core references included in this package: the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e, \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e, and \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe package supports trade-focused review of wiring methods, grounding and bonding, overcurrent protection, motors, electrical equipment, controls, specialty limitations, administrator responsibilities, and Washington electrical laws and rules.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep encourages practice-oriented preparation for an open-book testing environment. Candidates can strengthen reference-navigation skills by identifying the subject of each question, choosing the correct reference, locating the applicable provision, and applying it efficiently.\u003c\/p\u003e\n\n\u003cp\u003eProfessionals familiar with door and gate systems may already understand motors, controls, safety devices, sensors, operator panels, and troubleshooting. Structured exam preparation helps connect that practical knowledge with the precise NEC and Washington requirements used on the examination.\u003c\/p\u003e\n\n\u003cp\u003eAdministrator candidates also need a strong understanding of compliance responsibilities. Study should include contractor assignments, the legal limits of specialty 10, permits, inspections, administrator duties, and the distinction between administrative certification and electrician certification.\u003c\/p\u003e\n\n\u003cp\u003eThe goal is to combine technical system knowledge with organized code study, stronger Washington regulatory awareness, effective reference navigation, and confidence-building preparation. This Washington Door, Gate \u0026amp; Similar Systems Administrator Book Package provides the core materials needed to support that process.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the Washington classification for Door, Gate \u0026amp; Similar Systems?\u003c\/h2\u003e\n\n\u003cp\u003eWashington identifies Door, Gate \u0026amp; Similar Systems as electrical specialty classification \u003cstrong\u003e10\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat books are included in this package?\u003c\/h2\u003e\n\n\u003cp\u003eThis package includes \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e, \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e, and the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Washington Door, Gate \u0026amp; Similar Systems Administrator exam open book?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Washington electrical administrator examinations are open book under the applicable examination rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the Administrator examination?\u003c\/h2\u003e\n\n\u003cp\u003eThe examination includes approximately \u003cstrong\u003e30 NEC \u0026amp; Theory questions\u003c\/strong\u003e and \u003cstrong\u003e17 Washington Codes questions\u003c\/strong\u003e, for approximately 47 questions total.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much testing time is allowed?\u003c\/h2\u003e\n\n\u003cp\u003eThe NEC \u0026amp; Theory section provides approximately 2 hours, and the Washington Codes section provides approximately 1 hour.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\n\u003cp\u003eA score of at least \u003cstrong\u003e70%\u003c\/strong\u003e is required on each required examination section.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDo I need electrical work experience before taking the Administrator examination?\u003c\/h2\u003e\n\n\u003cp\u003eNo. Washington does not require documented electrical work experience before taking an Electrical Administrator examination.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDo I need L\u0026amp;I examination approval before scheduling?\u003c\/h2\u003e\n\n\u003cp\u003eNo. Electrical Administrator candidates may register directly with PSI without prior examination approval from Washington Labor \u0026amp; Industries.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long do I have to complete the Administrator examination?\u003c\/h2\u003e\n\n\u003cp\u003eAll required examination sections must be completed within the applicable \u003cstrong\u003eone-year examination period\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow soon should I apply after passing all sections?\u003c\/h2\u003e\n\n\u003cp\u003eThe required certification materials should be submitted to Washington Labor \u0026amp; Industries within \u003cstrong\u003e90 days of the final passing score\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan an Administrator personally perform electrical installation work?\u003c\/h2\u003e\n\n\u003cp\u003eAn Electrical Administrator certificate alone does not authorize work with the tools of the electrical trade. The person performing electrical work must separately hold the appropriate Washington electrician certification.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat systems fall within specialty 10?\u003c\/h2\u003e\n\n\u003cp\u003eThe classification includes qualifying electric doors, gates, windows, awnings, movable partitions, curtains, operator control panels, sensors, switches, and related electrical operator equipment.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat limits apply to qualifying branch circuits from an operator control panel?\u003c\/h2\u003e\n\n\u003cp\u003eQualifying branch circuits originating in a listed operator control panel are limited to a maximum of \u003cstrong\u003e600 volts and 20 amperes\u003c\/strong\u003e and must meet the other specialty requirements established by Washington rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan line-voltage power be reconnected to an operator control panel?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Washington permits limited reconnection when the existing branch circuit or feeder characteristics are not modified, the applicable voltage and amperage limits are met, and the conductor or conduit length does not exceed the permitted six-foot limit.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan specialty 10 contractors install new services, feeders, or panelboards?\u003c\/h2\u003e\n\n\u003cp\u003eNo. The specialty does not provide unrestricted authority to install, repair, or replace services, feeders, panelboards, disconnect switches, or line-voltage branch-circuit conductors supplying the operator control panel.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I use the 2020 NEC during the examination?\u003c\/h2\u003e\n\n\u003cp\u003eYes. The Washington electrical examination covered by this package permits the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I bring RCW 19.28 and WAC 296-46B into the examination?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Printed copies of both Washington references may be used when prepared according to the applicable examination requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho administers the Washington Door, Gate \u0026amp; Similar Systems Administrator exam?\u003c\/h2\u003e\n\n\u003cp\u003eWashington Electrical Administrator examinations are administered through \u003cstrong\u003ePSI\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat should I focus on while studying?\u003c\/h2\u003e\n\n\u003cp\u003eFocus on wiring methods, overcurrent protection, grounding and bonding, motors, electrical equipment, controls, Class 2 systems, specialty limitations, administrator responsibilities, and Washington electrical laws and rules.\u003c\/p\u003e\n\n","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":46541776388153,"sku":null,"price":295.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/WA-DOORSYSTEMSADMINISTRATOR-BOOKS.jpg?v=1789759163","url":"https:\/\/1examprep.com\/products\/washington-door-gate-similar-systems-administrator-book-package","provider":"1 Exam Prep","version":"1.0","type":"link"}