{"product_id":"washington-pump-irrigation-master-electrician-book-package","title":"Washington Pump \u0026 Irrigation Master Electrician Book Package","description":"\u003ch1 style=\"color: #d32f2f;\"\u003eWashington Pump \u0026amp; Irrigation Master Electrician Book Package\u003c\/h1\u003e\n\n\u003cp\u003ePrepare for the Washington Pump \u0026amp; Irrigation Master Electrician examination with a focused book package built around the primary electrical code, Washington electrical law, and state administrative rules used for the \u003cstrong\u003e03 Pump \u0026amp; Irrigation specialty\u003c\/strong\u003e. This package includes the \u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e, \u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e, and the \u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe Washington Pump \u0026amp; Irrigation Master Electrician certification is a specialty master credential. It is designed for experienced electricians who already hold the Washington 03 Pump \u0026amp; Irrigation specialty electrician certificate and are ready to move into the master-level classification. Preparation requires familiarity with electrical installations associated with pumps, water systems, controls, feeders, services, motors, grounding and bonding, wiring methods, and Washington-specific electrical laws and rules.\u003c\/p\u003e\n\n\u003cp\u003eWashington electrical examinations are \u003cstrong\u003eopen book\u003c\/strong\u003e. Candidates may bring approved reference materials into the testing center under Labor \u0026amp; Industries examination rules. That makes efficient navigation of the NEC, RCW, and WAC an important part of preparation. Candidates should know which reference applies to a question and how to locate the governing requirement without spending unnecessary time searching.\u003c\/p\u003e\n\n\u003cp\u003eThe Pump \u0026amp; Irrigation specialty is limited to specified electrical work associated with domestic water systems, public water systems, irrigation systems, pumps, pressurization, filtration, treatment equipment, controls, pump houses, and related installations. Because the specialty involves motors, controls, electrical services, feeders, and equipment exposed to demanding operating environments, candidates should be comfortable applying both general NEC rules and specialty-specific Washington requirements.\u003c\/p\u003e\n\n\u003cp\u003eThis package gives candidates the three core references needed to build an organized study routine. The NEC provides national electrical installation requirements, RCW 19.28 establishes Washington electrical law, and WAC 296-46B contains detailed state rules, specialty scopes, certification requirements, inspections, permits, and Washington-specific electrical provisions.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eWashington's electrical law covering electricians, master electricians, electrical contractors, electrical installations, certification, enforcement, responsibilities, and other statutory requirements governing electrical work throughout the state.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eWashington's detailed electrical safety, administration, licensing, examination, certification, inspection, permit, and installation rules. This reference also defines the scope of the 03 Pump \u0026amp; Irrigation specialty and other Washington electrical classifications.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC edition identified by Washington Labor \u0026amp; Industries for the current examination program. It provides national requirements covering services, feeders, motors, controls, grounding and bonding, overcurrent protection, wiring methods, equipment, special conditions, and other installations relevant to pump and irrigation work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThese references are most effective when studied together. A pump or irrigation installation may involve a general NEC requirement, a Washington state amendment, and a specialty-scope limitation at the same time. Candidates should practice moving between the three books and identifying which requirement controls the situation described in an exam question.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eWashington identifies this classification as the \u003cstrong\u003e03 Pump \u0026amp; Irrigation Master Electrician\u003c\/strong\u003e. The master examination is divided into two sections: \u003cstrong\u003eNEC \u0026amp; Theory\u003c\/strong\u003e and \u003cstrong\u003eWashington Codes\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNEC \u0026amp; Theory:\u003c\/strong\u003e Approximately 50 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed for NEC \u0026amp; Theory:\u003c\/strong\u003e 3 hours\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Codes:\u003c\/strong\u003e Approximately 20 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed for Washington Codes:\u003c\/strong\u003e 1 hour\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Questions:\u003c\/strong\u003e Approximately 70 questions across both sections\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Testing Time:\u003c\/strong\u003e Approximately 4 hours across both sections\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePassing Score:\u003c\/strong\u003e 70% on each required examination section\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExam Type:\u003c\/strong\u003e Open book\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTesting Provider:\u003c\/strong\u003e PSI\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNEC Edition:\u003c\/strong\u003e 2020 National Electrical Code\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe published examination outline places significant emphasis on grounding and bonding, wiring methods, motors and related equipment, services, overcurrent protection, wiring and protection, electrical equipment, special conditions, and general trade knowledge and theory. The Washington Codes section tests Washington electrical laws and rules contained in RCW 19.28 and WAC 296-46B.\u003c\/p\u003e\n\n\u003cp\u003eThe approximate NEC \u0026amp; Theory distribution includes questions from NEC introduction and general requirements, wiring and protection, services, overcurrent protection, grounding and bonding, wiring methods, electrical equipment, motors, HVAC equipment, generators and transformers, equipment over 600 volts, hazardous locations, special equipment, special conditions, and general trade knowledge and theory.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe Washington Pump \u0026amp; Irrigation Master Electrician examination is an \u003cstrong\u003eopen book test\u003c\/strong\u003e. Candidates may bring approved reference materials into the testing center under Washington Labor \u0026amp; Industries rules.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e may be used. Permanent index tabs are acceptable, but removable tabs, sticky notes, and handwritten notes are prohibited. Original copyrighted reference materials may contain highlighting, underlining, and permanent index tabs when they otherwise comply with examination requirements.\u003c\/p\u003e\n\n\u003cp\u003ePrinted copies of \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e and \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e are also permitted. Washington requires printed copies of its electrical laws and rules to be hole-punched and placed in a three-ring binder.\u003c\/p\u003e\n\n\u003cp\u003eCandidates may use a silent, nonprinting, nonprogrammable calculator that complies with testing rules. Calculators designed for preprogrammed electrical calculations are not permitted.\u003c\/p\u003e\n\n\u003cp\u003eOpen book preparation should focus on navigation as well as technical understanding. Candidates should become familiar with the NEC index, article organization, tables, exceptions, definitions, and cross-references. The same practice should be applied to Washington rules so specialty scope, licensing provisions, and state amendments can be located efficiently.\u003c\/p\u003e\n\n\u003cp\u003eQuestions involving motors, disconnects, branch-circuit and feeder conductors, grounding and bonding, overcurrent protection, or services will generally require the NEC. Questions involving the legal scope of the 03 specialty, certification, contractor responsibilities, permits, inspections, or Washington-specific requirements may require RCW 19.28 or WAC 296-46B.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eWashington Pump \u0026amp; Irrigation Master Electrician certification is administered by the \u003cstrong\u003eWashington State Department of Labor \u0026amp; Industries\u003c\/strong\u003e. Candidates follow the specialty master electrician pathway.\u003c\/p\u003e\n\n\u003col\u003e\n  \u003cli\u003e\n\u003cstrong\u003eHold the 03 Pump \u0026amp; Irrigation electrician certification.\u003c\/strong\u003e Candidates must first be certified by Washington Labor \u0026amp; Industries in the applicable specialty.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMeet the specialty master experience period.\u003c\/strong\u003e Washington requires a specialty master electrician candidate to have held the applicable specialty electrician certificate for at least two years.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eApply for the Master Electrician examination.\u003c\/strong\u003e Submit the required master examination application through Washington Labor \u0026amp; Industries.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eReceive examination approval.\u003c\/strong\u003e Candidates should not schedule the examination with PSI until Labor \u0026amp; Industries approves the request.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for both examination sections.\u003c\/strong\u003e Study the NEC \u0026amp; Theory portion and the Washington Codes portion using the approved references.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSchedule with PSI.\u003c\/strong\u003e After approval, schedule the required examination sections through the authorized testing provider.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePass each required section.\u003c\/strong\u003e Washington requires a score of at least 70% on each section.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete master certification requirements.\u003c\/strong\u003e After successful examination completion, follow Labor \u0026amp; Industries procedures for issuance of the specialty Master Electrician certificate.\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003cp\u003eWhen Washington issues the master certificate in the same category, it replaces the existing electrician certificate for that classification. The holder does not carry both an electrician certificate and a master electrician certificate for the same specialty at the same time.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eThe Pump \u0026amp; Irrigation specialty is identified as \u003cstrong\u003e03\u003c\/strong\u003e under Washington electrical rules. It is one of the state's recognized specialty electrician classifications.\u003c\/p\u003e\n\n\u003cp\u003eTo qualify for the Pump \u0026amp; Irrigation Master Electrician examination, a candidate must have been certified by Washington Labor \u0026amp; Industries in the applicable specialty for at least \u003cstrong\u003etwo years\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe underlying 03 Pump \u0026amp; Irrigation electrician certification requires \u003cstrong\u003e4,000 hours of qualifying work experience\u003c\/strong\u003e in the specialty. Washington also requires the applicable basic classroom instruction for candidates pursuing a 4,000-hour specialty examination pathway.\u003c\/p\u003e\n\n\u003cp\u003eThe scope of the 03 specialty is limited to the electrical connection of circuits, feeders, controls, low-voltage systems, related telecommunications, and services supplying specified water-related equipment and systems. These can include domestic water systems, public water systems, pumps, pressurization equipment, filtration systems, treatment equipment, irrigation water pumps, circular irrigation system pumps, pump houses, and associated controls.\u003c\/p\u003e\n\n\u003cp\u003eBecause the scope is specific, candidates should study the exact specialty boundaries in WAC 296-46B. Master-level certification does not convert the 03 specialty into unrestricted general electrical authority. Work must remain within the scope of the specialty unless the individual holds another applicable certification.\u003c\/p\u003e\n\n\u003cp\u003eWashington master electrician certificates are renewed periodically and continuing education requirements apply. Washington rules also provide specific continuing education treatment for Pump \u0026amp; Irrigation and Domestic Pump certificate holders because the work can overlap with the pumping and plumbing industry.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains Washington electrical statutes governing master electricians, specialty electricians, electrical contractors, installations, certification, enforcement, supervision, and related legal requirements. It supports preparation for the Washington Codes section of the examination.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains Washington electrical safety standards, examination requirements, specialty scopes, certification rules, permits, inspections, contractor requirements, state amendments, and installation provisions. Candidates should pay close attention to the rules defining the 03 Pump \u0026amp; Irrigation specialty.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2020 NEC provides national electrical requirements covering services, feeders, branch circuits, grounding and bonding, conductor sizing, wiring methods, overcurrent protection, motors, controllers, equipment, hazardous locations, special conditions, and other installations relevant to pump and irrigation electrical work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe books should be studied as an integrated set. The NEC provides broad technical requirements, while Washington laws and rules establish certification responsibilities, specialty limitations, and state-specific electrical provisions.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2020 NEC is permitted for Washington electrical examinations. Permanent index tabs, highlighting, and underlining are allowed under examination rules, while handwritten notes, removable tabs, and sticky notes are prohibited.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003ePrinted copies of Washington electrical law may be used during the examination when prepared according to Labor \u0026amp; Industries testing requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003ePrinted copies of Washington electrical rules may be used during the examination and should be hole-punched and organized in a three-ring binder.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eBecause these references are permitted during testing, candidates should practice with the same materials they intend to use on examination day. Familiarity with the location of frequently used provisions can make open book testing more efficient.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eMotors, Controls, Generators, and Transformers:\u003c\/strong\u003e Pump and irrigation work frequently involves motors and motor controls. Review NEC motor conductor sizing, overload protection, short-circuit and ground-fault protection, controllers, disconnecting means, motor circuits, generators, and transformer requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eGrounding and Bonding:\u003c\/strong\u003e Study grounding electrode systems, equipment grounding conductors, bonding, service grounding, separately derived systems, and grounding requirements affecting motors and water-related equipment.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWiring Methods:\u003c\/strong\u003e Review raceways, cables, conductor protection, boxes, fittings, wet-location requirements, underground installations, supports, and wiring methods commonly associated with pump houses and outdoor systems.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eServices and Feeders:\u003c\/strong\u003e Study service equipment, disconnects, feeder sizing, conductor ampacity, overcurrent protection, and electrical distribution supplying pumps, controls, and water-system equipment.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOvercurrent Protection:\u003c\/strong\u003e Review circuit breaker and fuse requirements, conductor protection, equipment protection, motor circuit protection, and coordination between overload protection and short-circuit protection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eHazardous and Special Conditions:\u003c\/strong\u003e Pump installations can involve environments that require additional electrical consideration. Review applicable hazardous-location rules, special conditions, outdoor installations, wet locations, and equipment protection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eGeneral Trade Knowledge and Theory:\u003c\/strong\u003e Practice electrical theory, Ohm's law, power calculations, voltage, current, resistance, motor-related calculations, conductor calculations, and other trade math associated with electrical installations.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWashington Specialty Scope:\u003c\/strong\u003e Review the precise work permitted under the 03 Pump \u0026amp; Irrigation classification. Specialty-scope questions can test whether a particular installation is authorized under the certificate.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWashington Laws and Rules:\u003c\/strong\u003e Study certification requirements, contractor responsibilities, examination procedures, permits, inspections, specialty boundaries, continuing education, and Washington amendments contained in RCW 19.28 and WAC 296-46B.\u003c\/p\u003e\n\n\u003cp\u003eA productive study routine combines technical review with timed reference lookup. Identify the subject of each practice question before opening a book. Decide whether the issue belongs in the NEC, RCW, or WAC, then locate and apply the controlling requirement.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps Washington Pump \u0026amp; Irrigation Master Electrician candidates organize preparation around the three core references used for the examination: the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e, \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e, and \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThis package supports trade-focused review of the subjects most closely connected with Pump \u0026amp; Irrigation electrical work, including motors, controls, services, feeders, grounding and bonding, wiring methods, overcurrent protection, water-system equipment, and Washington specialty requirements.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep encourages candidates to combine technical study with practical reference navigation. Open book examinations reward candidates who can recognize the topic of a question, select the correct book, and locate the applicable rule quickly.\u003c\/p\u003e\n\n\u003cp\u003eWashington-specific preparation is especially important for specialty master candidates. Even electricians with extensive pump and irrigation experience need familiarity with the legal scope of the 03 classification, certification requirements, contractor rules, inspection procedures, and state amendments.\u003c\/p\u003e\n\n\u003cp\u003ePractice-oriented preparation can also help identify weak areas. If motor calculations, grounding, Washington Codes, or specialty-scope questions consistently take longer, candidates can devote additional study time to those subjects before test day.\u003c\/p\u003e\n\n\u003cp\u003eThe goal is to combine practical pump and irrigation experience with organized code review, efficient reference navigation, and a strong understanding of Washington electrical requirements. This book package provides the core materials needed to build that preparation structure.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the Washington Pump \u0026amp; Irrigation Master Electrician classification?\u003c\/h2\u003e\n\n\u003cp\u003eIt is the master-level certification associated with Washington's \u003cstrong\u003e03 Pump \u0026amp; Irrigation specialty\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat books are included in this package?\u003c\/h2\u003e\n\n\u003cp\u003eThis package includes \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e, \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e, and the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Washington Pump \u0026amp; Irrigation Master Electrician exam open book?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Washington electrical examinations are open book, subject to Labor \u0026amp; Industries testing rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the exam?\u003c\/h2\u003e\n\n\u003cp\u003eThe published examination outline lists approximately \u003cstrong\u003e50 NEC \u0026amp; Theory questions\u003c\/strong\u003e and \u003cstrong\u003e20 Washington Codes questions\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\n\u003cp\u003eThe NEC \u0026amp; Theory section allows 3 hours, and the Washington Codes section allows 1 hour.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\n\u003cp\u003eWashington requires a minimum score of \u003cstrong\u003e70%\u003c\/strong\u003e on each required examination section.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long must I hold the 03 specialty before qualifying for the master exam?\u003c\/h2\u003e\n\n\u003cp\u003eWashington requires a specialty master electrician candidate to have held the applicable specialty electrician certification for at least \u003cstrong\u003etwo years\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much experience is required for the underlying 03 Pump \u0026amp; Irrigation electrician certification?\u003c\/h2\u003e\n\n\u003cp\u003eThe 03 Pump \u0026amp; Irrigation specialty requires \u003cstrong\u003e4,000 hours of qualifying specialty experience\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich NEC edition is used?\u003c\/h2\u003e\n\n\u003cp\u003eWashington currently identifies the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e for its electrical licensing examination program.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I use permanent NEC tabs?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Permanent index tabs are permitted. Removable tabs, sticky notes, and handwritten notes are prohibited.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I bring RCW 19.28 and WAC 296-46B into the exam?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Printed copies of Washington electrical laws and rules may be used when prepared according to Labor \u0026amp; Industries examination requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat work is included in the Pump \u0026amp; Irrigation specialty?\u003c\/h2\u003e\n\n\u003cp\u003eThe specialty covers specified electrical connections involving circuits, feeders, controls, low-voltage systems, related telecommunications, and services supplying qualifying domestic water, public water, pump, irrigation, pressurization, filtration, treatment, and pump-house equipment.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes a Pump \u0026amp; Irrigation Master Electrician have unrestricted electrical authority?\u003c\/h2\u003e\n\n\u003cp\u003eNo. It is a specialty master certification, and electrical work must remain within the scope of the 03 Pump \u0026amp; Irrigation classification unless the individual holds another certification that authorizes additional work.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho administers the Washington exam?\u003c\/h2\u003e\n\n\u003cp\u003eWashington electrical licensing examinations are administered through \u003cstrong\u003ePSI\u003c\/strong\u003e following the applicable Labor \u0026amp; Industries approval process.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat should I focus on while studying?\u003c\/h2\u003e\n\n\u003cp\u003eFocus on motors and controls, grounding and bonding, wiring methods, services, feeders, overcurrent protection, electrical theory, Pump \u0026amp; Irrigation specialty scope, and Washington-specific electrical laws and rules.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eAre you ready for the SEO metadata?\u003c\/strong\u003e\u003c\/p\u003e\n\u003ch1 style=\"color: #d32f2f;\"\u003eWashington Pump \u0026amp; Irrigation Master Electrician Book Package\u003c\/h1\u003e\n\n\u003cp\u003ePrepare for the Washington Pump \u0026amp; Irrigation Master Electrician examination with a focused book package built around the primary electrical code, Washington electrical law, and state administrative rules used for the \u003cstrong\u003e03 Pump \u0026amp; Irrigation specialty\u003c\/strong\u003e. This package includes the \u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e, \u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e, and the \u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe Washington Pump \u0026amp; Irrigation Master Electrician certification is a specialty master credential. It is designed for experienced electricians who already hold the Washington 03 Pump \u0026amp; Irrigation specialty electrician certificate and are ready to move into the master-level classification. Preparation requires familiarity with electrical installations associated with pumps, water systems, controls, feeders, services, motors, grounding and bonding, wiring methods, and Washington-specific electrical laws and rules.\u003c\/p\u003e\n\n\u003cp\u003eWashington electrical examinations are \u003cstrong\u003eopen book\u003c\/strong\u003e. Candidates may bring approved reference materials into the testing center under Labor \u0026amp; Industries examination rules. That makes efficient navigation of the NEC, RCW, and WAC an important part of preparation. Candidates should know which reference applies to a question and how to locate the governing requirement without spending unnecessary time searching.\u003c\/p\u003e\n\n\u003cp\u003eThe Pump \u0026amp; Irrigation specialty is limited to specified electrical work associated with domestic water systems, public water systems, irrigation systems, pumps, pressurization, filtration, treatment equipment, controls, pump houses, and related installations. Because the specialty involves motors, controls, electrical services, feeders, and equipment exposed to demanding operating environments, candidates should be comfortable applying both general NEC rules and specialty-specific Washington requirements.\u003c\/p\u003e\n\n\u003cp\u003eThis package gives candidates the three core references needed to build an organized study routine. The NEC provides national electrical installation requirements, RCW 19.28 establishes Washington electrical law, and WAC 296-46B contains detailed state rules, specialty scopes, certification requirements, inspections, permits, and Washington-specific electrical provisions.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat You Get\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eWashington's electrical law covering electricians, master electricians, electrical contractors, electrical installations, certification, enforcement, responsibilities, and other statutory requirements governing electrical work throughout the state.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eWashington's detailed electrical safety, administration, licensing, examination, certification, inspection, permit, and installation rules. This reference also defines the scope of the 03 Pump \u0026amp; Irrigation specialty and other Washington electrical classifications.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe NEC edition identified by Washington Labor \u0026amp; Industries for the current examination program. It provides national requirements covering services, feeders, motors, controls, grounding and bonding, overcurrent protection, wiring methods, equipment, special conditions, and other installations relevant to pump and irrigation work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThese references are most effective when studied together. A pump or irrigation installation may involve a general NEC requirement, a Washington state amendment, and a specialty-scope limitation at the same time. Candidates should practice moving between the three books and identifying which requirement controls the situation described in an exam question.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Details\u003c\/h2\u003e\n\n\u003cp\u003eWashington identifies this classification as the \u003cstrong\u003e03 Pump \u0026amp; Irrigation Master Electrician\u003c\/strong\u003e. The master examination is divided into two sections: \u003cstrong\u003eNEC \u0026amp; Theory\u003c\/strong\u003e and \u003cstrong\u003eWashington Codes\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNEC \u0026amp; Theory:\u003c\/strong\u003e Approximately 50 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed for NEC \u0026amp; Theory:\u003c\/strong\u003e 3 hours\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Codes:\u003c\/strong\u003e Approximately 20 questions\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTime Allowed for Washington Codes:\u003c\/strong\u003e 1 hour\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Questions:\u003c\/strong\u003e Approximately 70 questions across both sections\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTotal Testing Time:\u003c\/strong\u003e Approximately 4 hours across both sections\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePassing Score:\u003c\/strong\u003e 70% on each required examination section\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eExam Type:\u003c\/strong\u003e Open book\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eTesting Provider:\u003c\/strong\u003e PSI\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNEC Edition:\u003c\/strong\u003e 2020 National Electrical Code\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe published examination outline places significant emphasis on grounding and bonding, wiring methods, motors and related equipment, services, overcurrent protection, wiring and protection, electrical equipment, special conditions, and general trade knowledge and theory. The Washington Codes section tests Washington electrical laws and rules contained in RCW 19.28 and WAC 296-46B.\u003c\/p\u003e\n\n\u003cp\u003eThe approximate NEC \u0026amp; Theory distribution includes questions from NEC introduction and general requirements, wiring and protection, services, overcurrent protection, grounding and bonding, wiring methods, electrical equipment, motors, HVAC equipment, generators and transformers, equipment over 600 volts, hazardous locations, special equipment, special conditions, and general trade knowledge and theory.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eOpen Book Test\u003c\/h2\u003e\n\n\u003cp\u003eThe Washington Pump \u0026amp; Irrigation Master Electrician examination is an \u003cstrong\u003eopen book test\u003c\/strong\u003e. Candidates may bring approved reference materials into the testing center under Washington Labor \u0026amp; Industries rules.\u003c\/p\u003e\n\n\u003cp\u003eThe \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e may be used. Permanent index tabs are acceptable, but removable tabs, sticky notes, and handwritten notes are prohibited. Original copyrighted reference materials may contain highlighting, underlining, and permanent index tabs when they otherwise comply with examination requirements.\u003c\/p\u003e\n\n\u003cp\u003ePrinted copies of \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e and \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e are also permitted. Washington requires printed copies of its electrical laws and rules to be hole-punched and placed in a three-ring binder.\u003c\/p\u003e\n\n\u003cp\u003eCandidates may use a silent, nonprinting, nonprogrammable calculator that complies with testing rules. Calculators designed for preprogrammed electrical calculations are not permitted.\u003c\/p\u003e\n\n\u003cp\u003eOpen book preparation should focus on navigation as well as technical understanding. Candidates should become familiar with the NEC index, article organization, tables, exceptions, definitions, and cross-references. The same practice should be applied to Washington rules so specialty scope, licensing provisions, and state amendments can be located efficiently.\u003c\/p\u003e\n\n\u003cp\u003eQuestions involving motors, disconnects, branch-circuit and feeder conductors, grounding and bonding, overcurrent protection, or services will generally require the NEC. Questions involving the legal scope of the 03 specialty, certification, contractor responsibilities, permits, inspections, or Washington-specific requirements may require RCW 19.28 or WAC 296-46B.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eLicensing Steps\u003c\/h2\u003e\n\n\u003cp\u003eWashington Pump \u0026amp; Irrigation Master Electrician certification is administered by the \u003cstrong\u003eWashington State Department of Labor \u0026amp; Industries\u003c\/strong\u003e. Candidates follow the specialty master electrician pathway.\u003c\/p\u003e\n\n\u003col\u003e\n  \u003cli\u003e\n\u003cstrong\u003eHold the 03 Pump \u0026amp; Irrigation electrician certification.\u003c\/strong\u003e Candidates must first be certified by Washington Labor \u0026amp; Industries in the applicable specialty.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMeet the specialty master experience period.\u003c\/strong\u003e Washington requires a specialty master electrician candidate to have held the applicable specialty electrician certificate for at least two years.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eApply for the Master Electrician examination.\u003c\/strong\u003e Submit the required master examination application through Washington Labor \u0026amp; Industries.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eReceive examination approval.\u003c\/strong\u003e Candidates should not schedule the examination with PSI until Labor \u0026amp; Industries approves the request.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePrepare for both examination sections.\u003c\/strong\u003e Study the NEC \u0026amp; Theory portion and the Washington Codes portion using the approved references.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eSchedule with PSI.\u003c\/strong\u003e After approval, schedule the required examination sections through the authorized testing provider.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003ePass each required section.\u003c\/strong\u003e Washington requires a score of at least 70% on each section.\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eComplete master certification requirements.\u003c\/strong\u003e After successful examination completion, follow Labor \u0026amp; Industries procedures for issuance of the specialty Master Electrician certificate.\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003cp\u003eWhen Washington issues the master certificate in the same category, it replaces the existing electrician certificate for that classification. The holder does not carry both an electrician certificate and a master electrician certificate for the same specialty at the same time.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eState Requirements\u003c\/h2\u003e\n\n\u003cp\u003eThe Pump \u0026amp; Irrigation specialty is identified as \u003cstrong\u003e03\u003c\/strong\u003e under Washington electrical rules. It is one of the state's recognized specialty electrician classifications.\u003c\/p\u003e\n\n\u003cp\u003eTo qualify for the Pump \u0026amp; Irrigation Master Electrician examination, a candidate must have been certified by Washington Labor \u0026amp; Industries in the applicable specialty for at least \u003cstrong\u003etwo years\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe underlying 03 Pump \u0026amp; Irrigation electrician certification requires \u003cstrong\u003e4,000 hours of qualifying work experience\u003c\/strong\u003e in the specialty. Washington also requires the applicable basic classroom instruction for candidates pursuing a 4,000-hour specialty examination pathway.\u003c\/p\u003e\n\n\u003cp\u003eThe scope of the 03 specialty is limited to the electrical connection of circuits, feeders, controls, low-voltage systems, related telecommunications, and services supplying specified water-related equipment and systems. These can include domestic water systems, public water systems, pumps, pressurization equipment, filtration systems, treatment equipment, irrigation water pumps, circular irrigation system pumps, pump houses, and associated controls.\u003c\/p\u003e\n\n\u003cp\u003eBecause the scope is specific, candidates should study the exact specialty boundaries in WAC 296-46B. Master-level certification does not convert the 03 specialty into unrestricted general electrical authority. Work must remain within the scope of the specialty unless the individual holds another applicable certification.\u003c\/p\u003e\n\n\u003cp\u003eWashington master electrician certificates are renewed periodically and continuing education requirements apply. Washington rules also provide specific continuing education treatment for Pump \u0026amp; Irrigation and Domestic Pump certificate holders because the work can overlap with the pumping and plumbing industry.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eReference Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains Washington electrical statutes governing master electricians, specialty electricians, electrical contractors, installations, certification, enforcement, supervision, and related legal requirements. It supports preparation for the Washington Codes section of the examination.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThis reference contains Washington electrical safety standards, examination requirements, specialty scopes, certification rules, permits, inspections, contractor requirements, state amendments, and installation provisions. Candidates should pay close attention to the rules defining the 03 Pump \u0026amp; Irrigation specialty.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2020 NEC provides national electrical requirements covering services, feeders, branch circuits, grounding and bonding, conductor sizing, wiring methods, overcurrent protection, motors, controllers, equipment, hazardous locations, special conditions, and other installations relevant to pump and irrigation electrical work.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eThe books should be studied as an integrated set. The NEC provides broad technical requirements, while Washington laws and rules establish certification responsibilities, specialty limitations, and state-specific electrical provisions.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eExam Room Approved Books\u003c\/h2\u003e\n\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eNational Electrical Code, NEC, 2020 Edition\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003eThe 2020 NEC is permitted for Washington electrical examinations. Permanent index tabs, highlighting, and underlining are allowed under examination rules, while handwritten notes, removable tabs, and sticky notes are prohibited.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eRevised Code of Washington (RCW) Chapter 19.28\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003ePrinted copies of Washington electrical law may be used during the examination when prepared according to Labor \u0026amp; Industries testing requirements.\u003c\/span\u003e\n\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eWashington Administrative Code (WAC) Chapter 296-46B\u003c\/strong\u003e\u003cbr\u003e\u003cspan\u003ePrinted copies of Washington electrical rules may be used during the examination and should be hole-punched and organized in a three-ring binder.\u003c\/span\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003cp\u003eBecause these references are permitted during testing, candidates should practice with the same materials they intend to use on examination day. Familiarity with the location of frequently used provisions can make open book testing more efficient.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eTest Information and Study Materials\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eMotors, Controls, Generators, and Transformers:\u003c\/strong\u003e Pump and irrigation work frequently involves motors and motor controls. Review NEC motor conductor sizing, overload protection, short-circuit and ground-fault protection, controllers, disconnecting means, motor circuits, generators, and transformer requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eGrounding and Bonding:\u003c\/strong\u003e Study grounding electrode systems, equipment grounding conductors, bonding, service grounding, separately derived systems, and grounding requirements affecting motors and water-related equipment.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWiring Methods:\u003c\/strong\u003e Review raceways, cables, conductor protection, boxes, fittings, wet-location requirements, underground installations, supports, and wiring methods commonly associated with pump houses and outdoor systems.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eServices and Feeders:\u003c\/strong\u003e Study service equipment, disconnects, feeder sizing, conductor ampacity, overcurrent protection, and electrical distribution supplying pumps, controls, and water-system equipment.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOvercurrent Protection:\u003c\/strong\u003e Review circuit breaker and fuse requirements, conductor protection, equipment protection, motor circuit protection, and coordination between overload protection and short-circuit protection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eHazardous and Special Conditions:\u003c\/strong\u003e Pump installations can involve environments that require additional electrical consideration. Review applicable hazardous-location rules, special conditions, outdoor installations, wet locations, and equipment protection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eGeneral Trade Knowledge and Theory:\u003c\/strong\u003e Practice electrical theory, Ohm's law, power calculations, voltage, current, resistance, motor-related calculations, conductor calculations, and other trade math associated with electrical installations.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWashington Specialty Scope:\u003c\/strong\u003e Review the precise work permitted under the 03 Pump \u0026amp; Irrigation classification. Specialty-scope questions can test whether a particular installation is authorized under the certificate.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eWashington Laws and Rules:\u003c\/strong\u003e Study certification requirements, contractor responsibilities, examination procedures, permits, inspections, specialty boundaries, continuing education, and Washington amendments contained in RCW 19.28 and WAC 296-46B.\u003c\/p\u003e\n\n\u003cp\u003eA productive study routine combines technical review with timed reference lookup. Identify the subject of each practice question before opening a book. Decide whether the issue belongs in the NEC, RCW, or WAC, then locate and apply the controlling requirement.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow 1 Exam Prep Helps You Reach Your Goal\u003c\/h2\u003e\n\n\u003cp\u003e1 Exam Prep helps Washington Pump \u0026amp; Irrigation Master Electrician candidates organize preparation around the three core references used for the examination: the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e, \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e, and \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThis package supports trade-focused review of the subjects most closely connected with Pump \u0026amp; Irrigation electrical work, including motors, controls, services, feeders, grounding and bonding, wiring methods, overcurrent protection, water-system equipment, and Washington specialty requirements.\u003c\/p\u003e\n\n\u003cp\u003e1 Exam Prep encourages candidates to combine technical study with practical reference navigation. Open book examinations reward candidates who can recognize the topic of a question, select the correct book, and locate the applicable rule quickly.\u003c\/p\u003e\n\n\u003cp\u003eWashington-specific preparation is especially important for specialty master candidates. Even electricians with extensive pump and irrigation experience need familiarity with the legal scope of the 03 classification, certification requirements, contractor rules, inspection procedures, and state amendments.\u003c\/p\u003e\n\n\u003cp\u003ePractice-oriented preparation can also help identify weak areas. If motor calculations, grounding, Washington Codes, or specialty-scope questions consistently take longer, candidates can devote additional study time to those subjects before test day.\u003c\/p\u003e\n\n\u003cp\u003eThe goal is to combine practical pump and irrigation experience with organized code review, efficient reference navigation, and a strong understanding of Washington electrical requirements. This book package provides the core materials needed to build that preparation structure.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat is the Washington Pump \u0026amp; Irrigation Master Electrician classification?\u003c\/h2\u003e\n\n\u003cp\u003eIt is the master-level certification associated with Washington's \u003cstrong\u003e03 Pump \u0026amp; Irrigation specialty\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat books are included in this package?\u003c\/h2\u003e\n\n\u003cp\u003eThis package includes \u003cstrong\u003eRCW Chapter 19.28\u003c\/strong\u003e, \u003cstrong\u003eWAC Chapter 296-46B\u003c\/strong\u003e, and the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eIs the Washington Pump \u0026amp; Irrigation Master Electrician exam open book?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Washington electrical examinations are open book, subject to Labor \u0026amp; Industries testing rules.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow many questions are on the exam?\u003c\/h2\u003e\n\n\u003cp\u003eThe published examination outline lists approximately \u003cstrong\u003e50 NEC \u0026amp; Theory questions\u003c\/strong\u003e and \u003cstrong\u003e20 Washington Codes questions\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much time is allowed?\u003c\/h2\u003e\n\n\u003cp\u003eThe NEC \u0026amp; Theory section allows 3 hours, and the Washington Codes section allows 1 hour.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat score is required to pass?\u003c\/h2\u003e\n\n\u003cp\u003eWashington requires a minimum score of \u003cstrong\u003e70%\u003c\/strong\u003e on each required examination section.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow long must I hold the 03 specialty before qualifying for the master exam?\u003c\/h2\u003e\n\n\u003cp\u003eWashington requires a specialty master electrician candidate to have held the applicable specialty electrician certification for at least \u003cstrong\u003etwo years\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eHow much experience is required for the underlying 03 Pump \u0026amp; Irrigation electrician certification?\u003c\/h2\u003e\n\n\u003cp\u003eThe 03 Pump \u0026amp; Irrigation specialty requires \u003cstrong\u003e4,000 hours of qualifying specialty experience\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhich NEC edition is used?\u003c\/h2\u003e\n\n\u003cp\u003eWashington currently identifies the \u003cstrong\u003e2020 National Electrical Code\u003c\/strong\u003e for its electrical licensing examination program.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I use permanent NEC tabs?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Permanent index tabs are permitted. Removable tabs, sticky notes, and handwritten notes are prohibited.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eCan I bring RCW 19.28 and WAC 296-46B into the exam?\u003c\/h2\u003e\n\n\u003cp\u003eYes. Printed copies of Washington electrical laws and rules may be used when prepared according to Labor \u0026amp; Industries examination requirements.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat work is included in the Pump \u0026amp; Irrigation specialty?\u003c\/h2\u003e\n\n\u003cp\u003eThe specialty covers specified electrical connections involving circuits, feeders, controls, low-voltage systems, related telecommunications, and services supplying qualifying domestic water, public water, pump, irrigation, pressurization, filtration, treatment, and pump-house equipment.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eDoes a Pump \u0026amp; Irrigation Master Electrician have unrestricted electrical authority?\u003c\/h2\u003e\n\n\u003cp\u003eNo. It is a specialty master certification, and electrical work must remain within the scope of the 03 Pump \u0026amp; Irrigation classification unless the individual holds another certification that authorizes additional work.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWho administers the Washington exam?\u003c\/h2\u003e\n\n\u003cp\u003eWashington electrical licensing examinations are administered through \u003cstrong\u003ePSI\u003c\/strong\u003e following the applicable Labor \u0026amp; Industries approval process.\u003c\/p\u003e\n\n\u003ch2 style=\"color: #d32f2f;\"\u003eWhat should I focus on while studying?\u003c\/h2\u003e\n\n\u003cp\u003eFocus on motors and controls, grounding and bonding, wiring methods, services, feeders, overcurrent protection, electrical theory, Pump \u0026amp; Irrigation specialty scope, and Washington-specific electrical laws and rules.\u003c\/p\u003e\n\n","brand":"1 Exam Prep","offers":[{"title":"Default Title","offer_id":46531946840121,"sku":null,"price":295.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1789\/0861\/files\/WA-PUMPMASTERELECTRICIAN-BOOKS.jpg?v=1789677677","url":"https:\/\/1examprep.com\/products\/washington-pump-irrigation-master-electrician-book-package","provider":"1 Exam Prep","version":"1.0","type":"link"}