Important exam-number correction: Chicago 307 is the Concrete Masonry Contractor C Card examination. Chicago 302 is the separate Brick Masonry Contractor B Card exam.

Chicago 307 Concrete Masonry Contractor Exam Overview

The Chicago 307 C Card examination is administered through Continental Testing Services for the City of Chicago. Candidates are tested on practical concrete construction, reinforcing steel, materials, tools, estimating, safety, quality control and formwork.

Unlike many contractor licensing exams, the Chicago Concrete Masonry Contractor exam is closed book. That means your exam prep needs to move beyond reference lookup and toward real recall, calculation practice and timed testing.

Classification: Chicago 307

License Card: Concrete Masonry Contractor C Card

Testing time: 3 hours

Passing score: 70 or higher

Format: multiple choice, closed book

Official Exam Chicago 307 Concrete Masonry Contractor
Card C Card
Testing Administrator Continental Testing Services
Exam Length 3 hours
Passing Score 70 or higher
Format Closed-book multiple-choice examination
Calculator Non-programmable, non-printing portable calculator allowed
Minimum Age 21
Related Exam Chicago 302 Brick Masonry Contractor B Card
A Card Path Passing both B Card and C Card examinations can support qualification for the broader Masonry Contractor A Card

Chicago 307 C Card Exam Weighting

These percentages follow Continental Testing Services' published Concrete Masonry Contractor examination outline. The published values total 101% because of rounding.

Reinforcing & Installing Steel 20%
Concrete Methods & Installations 18%
Concrete Materials 14%
Concrete Tools, Equipment & Fasteners 14%
Quantity Surveying & Estimating 12%
Safety, Inspection & Quality Control 12%
Formwork 11%

Reinforcing & Installing Steel Exam Prep

Reinforcing and Installing Steel is the largest published Chicago 307 C Card exam category, so it deserves serious study time.

Reinforcing Fundamentals

  • Purpose of reinforcing steel
  • Reinforcing-bar placement
  • Bar spacing
  • Supports and chairs
  • Splices
  • Development and placement principles

Field Applications

  • Footing reinforcement
  • Beam reinforcement
  • Girder reinforcement
  • Handling reinforcing steel
  • Hoisting and placement safety
  • Installation sequencing

Concrete Methods & Installation Exam Prep

Placement & Finishing

  • Concrete placement
  • Consolidation
  • Vibration
  • Finishing operations
  • Joints
  • Surface preparation

Curing & Conditions

  • Concrete curing
  • Weather conditions
  • Hot-weather placement
  • Cold-weather considerations
  • Handling procedures
  • Site preparation

Concrete Materials Exam Prep

Concrete Materials accounts for 14% of the published examination. Candidates should understand how concrete ingredients and mix decisions affect workability, strength and durability.

Concrete Components

  • Portland cement and cementitious materials
  • Water
  • Fine aggregate
  • Coarse aggregate
  • Admixtures
  • Ready-mixed concrete

Material Performance

  • Water-cementitious material ratio
  • Workability
  • Concrete strength
  • Durability
  • Temperature
  • Mix consistency

Concrete Estimating & Construction Math

Quantity Surveying and Estimating represents 12% of the official outline, so construction math should be practiced, not merely admired from a safe distance.

Volume Calculations

  • Length Ɨ width Ɨ depth
  • Cubic feet
  • Cubic-yard conversion
  • Slab quantities
  • Footing quantities
  • Wall quantities

Estimating Skills

  • Material quantities
  • Waste allowances
  • Dimensions
  • Production calculations
  • Concrete ordering
  • Quantity review

Safety, Inspection & Quality Control

Safety, Inspection and Quality Control accounts for 12% of the examination, and OSHA 29 CFR Part 1926 is one of the official study references.

Jobsite Safety

  • Personal protective equipment
  • Reinforcing-steel safety
  • Material handling
  • Equipment safety
  • Scaffolding awareness
  • Concrete-placement hazards

Inspection & Quality

  • Concrete temperature
  • Sampling
  • Inspection procedures
  • Concrete quality
  • Placement quality control
  • Jobsite documentation concepts

Formwork Exam Prep

Formwork represents 11% of the official Chicago C Card outline. Candidates should understand both form construction and safe removal.

  • Form materials
  • Form construction
  • Shoring
  • Bracing
  • Alignment
  • Form pressure
  • Form-release procedures
  • Concrete strength before stripping
  • Safe form removal

Closed-book reminder: Continental's recommended books are study references. They are not test-day reference books because the Chicago 307 Concrete Masonry Contractor C Card examination is closed book.

Official C Card Study References

Core Masonry & Safety References

  • Masonry Skills
  • Concrete Masonry Handbook for Architects, Engineers and Builders
  • OSHA 29 CFR Part 1926
  • ASTM C94/C94M Ready-Mixed Concrete

Concrete-Specific References

  • Formwork for Concrete
  • Design and Control of Concrete Mixtures
  • Concrete Finisher's Guide
  • Placing Reinforcing Bars

Chicago B Card, C Card & A Card

Chicago 302 B Card

  • Brick Masonry Contractor
  • Separate examination
  • Focuses on brick masonry work
  • Not the Concrete Masonry C Card exam

Chicago 307 C Card

  • Concrete Masonry Contractor
  • Focuses on concrete masonry work
  • 3-hour closed-book exam
  • Passing both B and C exams can support A Card qualification

Chicago 307 C Card Exam Prep Roadmap

Move from exam-outline review into focused topic study, calculations and closed-book simulation.

1

Learn the official exam weighting

Start with the seven published subject categories so your study time reflects the actual Continental outline.

2

Prioritize reinforcing steel

Reinforcing and Installing Steel is the largest exam category at 20 percent.

3

Review concrete methods and materials

Study placement, consolidation, finishing, curing, ready-mixed concrete and concrete properties.

4

Practice estimating and concrete math

Work cubic feet, cubic yards, slabs, walls, footings and material-quantity calculations.

5

Review OSHA and quality control

Study jobsite safety, reinforcing hazards, equipment safety, inspection and concrete-quality concepts.

6

Study formwork

Review form construction, shoring, bracing, concrete pressure and safe stripping procedures.

7

Finish with closed-book simulations

Stop relying on references and practice completing full three-hour exam simulations from memory and calculation skill.

Six-Week Chicago C Card Exam Prep Plan

Week 1

Reinforcing Steel

  • Bar placement
  • Spacing
  • Splices
  • Safety
Week 2

Concrete Methods

  • Placement
  • Consolidation
  • Finishing
  • Curing
Week 3

Concrete Materials

  • Cement
  • Aggregates
  • Admixtures
  • Water-cementitious ratio
Week 4

Estimating

  • Cubic feet
  • Cubic yards
  • Footings
  • Material quantities
Week 5

Safety & Formwork

  • OSHA
  • Inspection
  • Form construction
  • Form removal
Week 6

Closed-Book Simulation

  • Timed practice exams
  • Three-hour simulations
  • Missed-question review
  • Final math drills

Chicago 307 Concrete Masonry Contractor C Card FAQ

Exam Basics

Chicago 307 is the Concrete Masonry Contractor C Card examination.
Chicago 302 is the separate Brick Masonry Contractor B Card exam.
Candidates receive three hours.
Candidates must earn a score of 70 or higher.
No. The Chicago 307 Concrete Masonry Contractor exam is closed book.
Continental Testing Services administers the examination for the City of Chicago.

Exam Topics

Reinforcing and Installing Steel is the largest published category at 20 percent.
Concrete Methods and Installations represents 18 percent of the published exam outline.
Concrete Materials represents 14 percent of the published exam outline.
Yes. Quantity Surveying and Estimating represents 12 percent of the published examination outline.
Yes. Safety, Inspection and Quality Control represents 12 percent, and OSHA 29 CFR Part 1926 is one of the official study references.
Yes. Formwork represents 11 percent of the published examination outline.

Calculations & Reinforcing

Practice length, width and depth calculations, cubic feet, cubic-yard conversions, slab quantities, footing quantities, wall quantities and waste allowances.
Study reinforcing-bar placement, spacing, supports, splicing, beam and footing reinforcement, handling and safe installation.

Study References

Study references include Masonry Skills, Concrete Masonry Handbook, OSHA 29 CFR 1926, ASTM C94/C94M, Formwork for Concrete, Design and Control of Concrete Mixtures, Concrete Finisher's Guide and Placing Reinforcing Bars.
No. They are study references. The Chicago 307 Concrete Masonry examination is closed book.

Chicago Masonry Cards

Chicago 302 B Card is the Brick Masonry Contractor exam. Chicago 307 C Card is the Concrete Masonry Contractor exam.
Passing both the B Card and C Card examinations can support qualification for the broader Masonry Contractor A Card, subject to applicable City licensing requirements.

Prepare for the Chicago 307 Concrete Masonry C Card Exam

Build reinforcing-steel knowledge, concrete-method confidence, material understanding, estimating skill, OSHA awareness, formwork knowledge and closed-book test stamina for the Chicago Concrete Masonry Contractor examination.