Mississippi Municipal Contractor Book Package

Mississippi Municipal Contractor Book Package

Regular price $895.00
Sale price $895.00 Regular price $995.00
Sale Sold out
Shipping calculated at checkout.
Choose Your Option

CALL TO ASK ABOUT FINANCIAL ASSISTANCE

  • image-right
Customer Reviews
View full details

Mississippi Municipal Contractor Book Package

Build a complete technical reference library for the Mississippi Municipal contractor examination with this coordinated collection of municipal and public works construction books. The Mississippi Municipal Contractor Book Package includes ten references covering concrete construction, reinforcing steel, federal construction safety, ductile iron pipe, concrete pipe, box culverts, excavation, formwork, post-tensioning, steel joists, and work near underground utility facilities.

Municipal construction involves more than one limited trade. Contractors may work with water and sewer pipelines, storm drainage systems, underground utilities, excavations, concrete structures, pipe bedding, backfill, reinforcing steel, formwork, and related public infrastructure. Candidates preparing for the examination need to understand how these subjects connect throughout a project.

This package gives experienced contractors, qualifying parties, utility professionals, supervisors, and project personnel access to the listed references in one convenient set. Purchasing the books together reduces the need to locate each title individually and creates an organized foundation for independent exam preparation.

The books support study of common municipal construction subjects, including concrete placement and quality, reinforcing-bar practices, excavation safety, ductile iron pipe installation, concrete pipe and box culvert installation, trenching, formwork, post-tensioning systems, steel joist erection, and underground utility damage prevention.

Candidates should use the package as an active study library. Review every book’s table of contents, index, diagrams, tables, terminology, and chapter organization. Practice identifying which reference applies to a question before searching for the answer. Efficient open-book testing depends on both technical knowledge and familiarity with the reference set.

This product includes the ten listed municipal trade references. Highlighting, tabbing, online course access, Application Service, business formation, EIN filing, licensing assistance, and the Mississippi Business and Law reference are not included unless purchased separately through another package.

Exam Details

Municipal and Public Works is a major contractor classification recognized by the Mississippi State Board of Contractors. The classification involves water and sewer pipelines and plants, automated meter-reading equipment for water meters, associated excavation, grading and paving, storm drains, sewage-disposal structures, drainage systems, and camera inspection of sewer lines.

The Municipal and Public Works contractor examination may address several connected areas of construction knowledge. Candidates should prepare for subjects involving excavation, underground utilities, ductile iron pipe, concrete pipe, box culverts, concrete materials, reinforcing steel, formwork, post-tensioning, steel joists, and construction safety.

Questions may require practical field knowledge, interpretation of technical diagrams, application of recommended construction practices, or efficient use of the references. A candidate may need to identify an installation procedure, determine a suitable method, locate a safety requirement, or recognize which publication covers a specific construction condition.

The Contractor’s Guide to Quality Concrete Construction supports preparation involving concrete materials, mixing, preparation, placement, consolidation, finishing, curing, durability, and quality-control practices. Concrete questions may involve both the finished product and the procedures used throughout construction.

Placing Reinforcing Bars supports study involving bar identification, handling, supports, ties, bends, laps, spacing, cover, tolerances, and field placement. Reinforcing-steel knowledge is closely connected with formwork, concrete placement, structural drawings, and project quality.

The Code of Federal Regulations, 29 CFR Part 1926, supports preparation involving federal construction-safety requirements. Relevant subjects may include excavation, protective systems, personal protective equipment, tools, equipment, material handling, electrical hazards, fall protection, access, and concrete operations.

The ductile iron pipe installation guide supports study involving pipe handling, trench preparation, foundations, bedding, joining, alignment, installation, testing, backfill, and field practices. The concrete pipe and box culvert reference addresses installation considerations involving excavation, foundations, bedding, placement, joints, backfill, and compaction.

Pipe and Excavation Contracting provides field-oriented information involving trenching, excavation, underground utility work, pipe installation, equipment, production, job planning, safety, and contracting practices. This reference helps connect individual technical subjects with the complete sequence of underground construction.

SP-4 supports preparation involving concrete formwork, loads, shores, bracing, construction, tolerances, stripping, and related practices. Formwork is an important part of concrete construction because it establishes dimensions, supports fresh concrete, and affects the quality of the finished structure.

The post-tensioning field-fundamentals reference supports review involving unbonded post-tensioning components, handling, installation, field procedures, stressing awareness, and safety. Technical Digest No. 9 addresses handling, unloading, storage, placement, erection, bridging, and stability practices for steel joists and joist girders.

The Mississippi excavation regulation supports preparation involving work near underground utility facilities. Contractors should understand notification, markings, planning, damage-prevention responsibilities, and the procedures that apply before and during excavation.

Mississippi contractor applicants must also prepare for the Mississippi Law and Business Management examination. The applicable Business and Law reference is not included in this trade-only package and must be obtained separately.

Open Book Test

Mississippi contractor examinations administered through PSI are open book. Candidates are responsible for bringing the references permitted for their scheduled examinations and following the current testing rules concerning book titles, editions, markings, highlighting, tabs, notes, and supplemental materials.

An open-book format does not eliminate the need for preparation. The Municipal reference set covers several technical subjects, and candidates can lose valuable time by searching an unfamiliar book or selecting the wrong publication.

Begin each lookup by identifying the main subject of the question. Determine whether the question concerns concrete, reinforcing steel, OSHA safety, ductile iron pipe, concrete pipe, excavation, formwork, post-tensioning, steel joists, or underground utility regulations.

Concrete-quality and placement questions may lead to The Contractor’s Guide to Quality Concrete Construction. Questions involving reinforcing-bar supports, laps, ties, bends, spacing, or cover may require Placing Reinforcing Bars.

Construction-safety questions may require 29 CFR Part 1926, particularly when the topic involves trenches, worker protection, personal protective equipment, access, equipment, tools, material handling, or concrete operations.

Ductile iron pipe questions may lead to the installation guide. Concrete pipe and box culvert questions may require the applicable installation reference. Excavation, trenching, underground utility work, equipment, and general pipe-contracting questions may involve Pipe and Excavation Contracting.

Questions involving concrete forms, shores, bracing, form loads, tolerances, or stripping may require SP-4. Post-tensioning questions may lead to the Level 1 Field Fundamentals reference, while steel-joist handling and erection questions may involve Technical Digest No. 9.

Questions involving excavation near underground utility facilities may require the Mississippi excavation regulation. Candidates should become familiar with terminology associated with notifications, markings, underground facilities, excavation responsibilities, and damage prevention.

Practice related index terms because the wording used in an examination question may differ from the language used in the book. A trench-safety question may require searches involving excavation, soil, protective systems, shielding, shoring, sloping, access, or egress.

Review the current PSI Candidate Information Bulletin before testing. The bulletin provides current examination instructions, content information, approved references, scheduling procedures, and testing-center rules.

Licensing Steps

  1. Select the appropriate classification. Confirm that Mississippi Municipal and Public Works matches the water, sewer, drainage, underground utility, excavation, concrete, or infrastructure services the business intends to provide.
  2. Choose the applicant structure. Determine whether the application will be submitted by an individual, corporation, limited liability company, partnership, or another accepted business entity.
  3. Select the qualifying party. Identify the person who will qualify the business and complete the examinations required for the requested classification.
  4. Document relevant experience. Organize detailed project information showing municipal, water, sewer, excavation, underground utility, pipe, drainage, concrete, or related public works experience.
  5. Complete the contractor application. Provide the requested business, ownership, qualifying-party, experience, reference, financial, insurance, and supporting information.
  6. Submit the application. Send the completed contractor application to the Mississippi State Board of Contractors before attempting to schedule the examinations.
  7. Respond to application requests. Provide missing documents, corrections, explanations, or additional information requested during the review process.
  8. Receive examination eligibility. After the application is reviewed and the qualifying party is approved to test, eligibility information is sent to PSI.
  9. Schedule the examinations. Follow the testing provider’s instructions to select an available examination date and location.
  10. Obtain the correct references. Secure the books and editions required for the applicable Municipal trade examination.
  11. Study the trade material. Review concrete, reinforcing steel, pipe installation, excavation, formwork, post-tensioning, steel joists, utility protection, and safety.
  12. Prepare for Business and Law. Obtain the separate Mississippi Business and Law reference and complete the required preparation.
  13. Take the required examinations. Bring acceptable identification and only the books and materials permitted under the current testing rules.
  14. Complete outstanding requirements. Submit any remaining information or corrections requested during the licensing process.
  15. Receive final Board review. Passing the examinations does not automatically issue a license. The completed application and supporting documentation must also be reviewed and approved.
  16. Maintain the license. After issuance, the contractor is responsible for renewal, insurance, taxes, business records, permits, safety obligations, and ongoing compliance.

State Requirements

The Mississippi State Board of Contractors administers the applicable commercial contractor licensing process. Municipal and Public Works is a tested major classification.

Applicants should select the classification that accurately reflects the services the business plans to provide. Municipal work may involve water and sewer systems, pipelines, treatment plants, drainage, underground utilities, excavation, grading, paving, and related public infrastructure.

The qualifying party must have a relationship with the applicant accepted by the Board. Depending on the company structure, the qualifying party may be an owner, officer, executive staff member, or responsible managing employee.

The contractor application may require business-registration records, ownership information, qualifying-party documentation, detailed project experience, references, financial information, insurance records, and other supporting materials. Information should be accurate and consistent with the company’s official records.

The Mississippi Law and Business Management examination is required for applicants. The Municipal and Public Works trade examination is also required unless an applicable examination waiver is approved through the licensing process.

Reciprocity or examination credit does not automatically issue a Mississippi contractor license. Applicants must still complete the Mississippi application process, satisfy the remaining requirements, and receive final Board approval.

Passing the examinations is one part of licensing. Candidates should not represent themselves or their businesses as licensed Mississippi contractors until the applicable credential has been approved and issued.

Municipal and public works projects may involve additional obligations beyond the contractor license. Depending on the project, contractors may need engineering documents, public bidding compliance, bonds, environmental approvals, utility coordination, permits, inspections, traffic-control plans, insurance, and local registrations.

Reference Books

  • Included Book: The Contractor’s Guide to Quality Concrete Construction, 4th Edition
    A practical concrete reference covering materials, preparation, placement, consolidation, finishing, curing, quality control, durability, and recommended construction practices.
  • Included Book: Placing Reinforcing Bars
    A reinforcing-steel reference addressing bar identification, handling, supports, ties, bends, laps, spacing, cover, tolerances, detailing, and field placement practices.
  • Included Book: Code of Federal Regulations—29 CFR Part 1926 (OSHA)
    A federal construction-safety reference covering excavation, personal protective equipment, fall protection, electrical hazards, tools, equipment, concrete operations, and material handling.
  • Included Book: Installation Guide for Ductile Iron Pipe
    A technical guide addressing ductile iron pipe handling, trench preparation, bedding, joining, alignment, installation, testing, backfilling, and field practices.
  • Included Book: Concrete Pipe and Box Culvert Installation, 2019
    An installation reference covering concrete pipe and box culvert handling, foundations, bedding, placement, joints, backfill, compaction, and field considerations.
  • Included Book: Pipe and Excavation Contracting
    A field-oriented reference addressing trenching, excavation, underground utilities, pipe installation, equipment, job planning, production, safety, and contracting practices.
  • Included Book: SP-4 Formwork for Concrete, 2014, 8th Edition
    A technical formwork reference covering materials, loads, shores, bracing, construction, tolerances, stripping, and concrete-forming practices.
  • Included Book: Training and Certification of Field Personnel for Unbonded Post-Tensioning—Level 1 Field Fundamentals
    A field reference addressing unbonded post-tensioning components, handling, installation procedures, field practices, stressing awareness, and safety fundamentals.
  • Included Book: Technical Digest No. 9—Handling and Erection of Steel Joists and Joist Girders, 3rd Edition
    A technical guide covering unloading, storage, handling, placement, erection, bridging, stability, and safety practices for steel joists and joist girders.
  • Included Book: State of Mississippi Regulation of Excavation, Chapter 13—Regulation of Excavations Near Underground Utility Facilities
    A Mississippi regulatory reference addressing excavation near underground utilities, notification procedures, markings, responsibilities, planning, and damage prevention.

This package includes standard copies of the listed books. Highlighting and tabbing are not included in the product information provided.

Test Information and Study Materials

Create a study schedule that separates the material into concrete construction, reinforcing steel, OSHA safety, ductile iron pipe, concrete pipe, box culverts, excavation, formwork, post-tensioning, steel joists, and underground utility protection.

Study pipe installation as a complete process. Review planning, utility location, excavation, trench preparation, bedding, pipe handling, joining, alignment, testing, backfill, compaction, restoration, and safety.

Review concrete construction together with reinforcing steel and formwork. Understand how formwork establishes dimensions, reinforcement supports structural performance, and placement and curing procedures affect finished concrete quality.

Use the OSHA reference when studying excavation safety, protective systems, access and egress, personal protective equipment, material handling, tools, and equipment. Connect the safety requirements with the field procedures described in the pipe and excavation reference.

Complete timed reference searches with the entire book set. Identify the primary subject, select the most appropriate reference, locate an effective index term, and find the supporting section. Repeat searches that take too long and practice using alternative terminology.

When reviewing an incorrect practice answer, determine whether the difficulty resulted from limited trade knowledge, selecting the wrong reference, using an ineffective search term, overlooking a technical detail, or misreading the question.

How 1 Exam Prep Helps You Reach Your Goal

1 Exam Prep helps Mississippi Municipal contractor candidates begin their preparation with an organized technical library covering the major subjects associated with municipal and public works construction.

Purchasing the references together reduces the need to locate each title separately and gives candidates a coordinated set for studying concrete, reinforcement, excavation, pipe installation, formwork, structural components, safety, and utility protection.

Trade-focused review helps candidates connect practical construction experience with the terminology used in technical guides, safety regulations, installation manuals, and contractor examination questions.

Practice-oriented preparation encourages candidates to use the books actively. Timed reference searches, technical review, and repeated navigation can help candidates become more comfortable selecting the correct book and locating supporting information.

An organized study structure also makes a broad examination easier to manage. Candidates can divide preparation into individual subject areas and revisit topics that require additional attention.

This book package does not guarantee a passing score, examination eligibility, licensing approval, or license issuance. Results depend on the candidate’s experience, preparation, technical knowledge, reference-navigation skills, examination performance, and completion of Mississippi licensing requirements.

Frequently Asked Questions

What is included in the Mississippi Municipal Contractor Book Package?

The package includes ten municipal trade references covering concrete construction, reinforcing steel, safety, pipe installation, excavation, formwork, post-tensioning, steel joists, and underground utility regulations.

Are the books highlighted and tabbed?

No. This standard package includes the listed books without highlighting or tabbing.

Is the Mississippi Municipal contractor examination open book?

Yes. Mississippi contractor examinations administered through PSI are open book. Candidates must follow current rules for approved references, editions, markings, and materials.

Does the package include the Mississippi Business and Law book?

No. This is a Municipal trade-reference package. The applicable Mississippi Business and Law reference must be obtained separately.

Does this package include online course access?

No. This product includes the listed books only.

Is Application Service included?

No. Application Service and licensing assistance are not included with this book package.

How should I study with the books?

Learn the purpose of every reference, review each index and table of contents, complete timed searches, and connect the written material with practical municipal construction experience.

Can I bring the books into the examination room?

Candidates must follow the current PSI Candidate Information Bulletin for approved titles, editions, markings, and examination-center requirements.

Does purchasing the books guarantee a passing score?

No. Examination results depend on the candidate’s experience, preparation, technical understanding, reference-navigation ability, and performance on test day.

Does passing the examination automatically issue a contractor license?

No. Passing the examinations is one part of the licensing process. The completed application and supporting documentation must also receive Board approval.