Now you are eligible FREE SHIPPING
The Washington, DC Second Class Stationary Boilers examination is tied to the District's Steam Engineer, Class 2 credential. The 1ExamPrep collection uses the phrase "Second Class Stationary Boilers Contractor," but the District credential associated with Exam 314 is an individual Class 2 Steam Engineer license.
Class 2 is a major step above Class 3. Current District regulations authorize a Class 2 Steam Engineer to take charge of and operate a high-pressure steam plant where the total horsepower of the boilers and engines or refrigeration machinery does not exceed 750 horsepower. The experience requirement builds on the Class 3 foundation and adds one year as an assistant engineer in charge of a third-class plant.
Start with the Washington DC Second Class Stationary Boilers Contractor collection from 1ExamPrep. This guide explains Class 2 scope, experience requirements, Exam 314, turbine study, boiler systems, pollution control, electrical systems, controls, HVACR, closed-book preparation, fees, renewal, and the technical reference library used for exam preparation.
Washington, DC regulates steam and stationary engineers through the Board of Industrial Trades. Class 2 is an individual plant-operations credential within that licensing program.
A Class 2 Steam Engineer is expected to understand high-pressure boiler plants and the machinery around them. That can include steam turbines, engines, refrigeration equipment, feedwater systems, pumps, condensate systems, electrical equipment, controls, burners, water treatment, auxiliary equipment, and other plant systems.
Current D.C. Municipal Regulations state that a Class 2 Steam Engineer must have the experience and knowledge to take charge of and operate a high-pressure steam plant where the total horsepower of the boilers and engines or refrigeration machinery is not more than 750 horsepower.
This broader plant authority helps explain why the exam contains turbines, refrigeration, electrical systems, controls, pumps, environmental systems, and engineering calculations in addition to boilers.
The regulation sets the Class 2 high-pressure plant authority at no more than 750 total horsepower.
Class 2 is built around operation of a high-pressure steam plant.
Class 2 experience is built on the experience required for the Class 3 examination.
An additional year as assistant engineer in charge of a third-class plant is required.
Class 2 does not start from zero. Current District regulations require the applicant to first satisfy the experience required for examination for the Class 3 Steam Engineer license.
The applicant then needs one additional year of experience as an assistant engineer in charge of a third-class plant.
That makes Class 2 a progression license. The District is looking for both the broader stationary engineering foundation associated with Class 3 and documented higher-level responsibility in a third-class plant.
The Class 2 regulation specifically points back to the experience required for the Class 3 examination. The Class 3 requirement currently provides two major experience routes.
The Class 3 rule also allows one year of that underlying experience requirement to be waived for a graduate mechanical engineer from a duly recognized school of technology or a graduate of an approved engineer apprentice training program.
For Class 2, however, the regulation separately adds the one year as assistant engineer in charge of a third-class plant. Applicants should document both the underlying Class 3 qualification and the added Class 2 experience.
The District's current Stationary Engineers application instructions state that there is no general waiver or reciprocity for stationary engineers.
An out-of-jurisdiction Class 2 or stationary-engineer license should not be assumed to replace the District's experience review, examination, or licensing requirements.
The separate one-year Class 3 experience reduction for qualifying mechanical-engineering or approved engineer-apprentice graduates remains part of the underlying Class 3 rule.
Current District Stationary Engineers instructions require an Employment Verification Letter, along with the standard application materials.
For licensing paperwork support, review 1ExamPrep application services.
The current Second Class Stationary Boilers exam contains 80 multiple-choice questions.
Candidates currently receive three hours to complete Exam 314.
The current PSI bulletin identifies Exam 314 as closed book.
The current PSI bulletin lists a $52 computer-based testing fee.
| Content Area | Published Weight | Approximate Share of 80 Questions |
|---|---|---|
| Turbines, Design Auxiliaries, and Operations | 15% | About 12 |
| Boiler Operations, Maintenance, and Safety | 9% | About 7 |
| Waste to Energy Plants and Environmental/Pollution Control | 7% | About 6 |
| Water Treatment | 8% | About 6 |
| Boiler Combustion and Fuels | 7% | About 6 |
| Boiler Accessories and Auxiliary Equipment | 8% | About 6 |
| Engineering Calculations | 7% | About 6 |
| Electrical | 8% | About 6 |
| Controls, Pneumatic and Electronic | 7% | About 6 |
| Pumps, Feed, Hydronic, and Condensate Systems | 8% | About 6 |
| Refrigeration, Air Conditioning, and Cooling Towers | 8% | About 6 |
| Boiler Design and Principles | 8% | About 6 |
Turbines, Design Auxiliaries, and Operations is the largest single category at 15 percent. The rest of the exam is spread across eleven additional plant subjects, so balanced preparation is essential.
Turbines are the largest individual topic on Exam 314. Candidates should understand basic steam-turbine construction, operating principles, auxiliaries, lubrication, governing, condensers, startup, shutdown, and abnormal conditions.
Turbine study should include the auxiliaries. A turbine is not just a spinning wheel with excellent confidence. It depends on oil, steam conditions, condenser performance, controls, and protection.
Boiler operations remain central even though Class 2 covers a much broader plant. Review safe operating sequences, water level, pressure, combustion, blowdown, inspections, maintenance, and emergency response.
Water treatment affects boiler efficiency, heat transfer, corrosion, steam quality, and equipment life.
Study the symptom, cause, and operating effect. That approach is easier to remember on a closed-book exam.
Class 2 engineers need to understand the equipment that supports boiler operation and plant efficiency.
The Electrical category is the same weight as several mechanical subjects. Review the electrical systems that support pumps, fans, compressors, burners, chillers, cooling towers, controls, and plant auxiliaries.
Pumps and fluid systems connect nearly every part of a central plant. Study feedwater, condensate, hydronic circulation, pump operation, valves, and piping relationships.
Class 2 scope can include refrigeration machinery, so HVACR knowledge is not optional.
Boiler Design and Principles asks you to understand why the equipment is built the way it is and how design affects circulation, heat transfer, pressure containment, combustion, and operation.
Exam 314 includes a dedicated environmental and pollution-control section. That reflects the broader responsibilities of advanced plant operators.
Study what the equipment is trying to remove or control and where it fits in the plant process.
Combustion questions can involve fuel properties, burners, air-fuel ratios, draft, flue gases, efficiency, and safe operation.
Closed-book calculations reward repetition. Practice common stationary-engineering relationships until the setup becomes familiar.
Track units carefully. A beautiful formula with the wrong units is still a wrong answer wearing a tie.
Modern stationary plants depend on controls for boilers, burners, turbines, pumps, chillers, cooling towers, and auxiliary systems.
The current PSI bulletin identifies Exam 314 as closed book. The District's Stationary Engineers instructions also state that the stationary-engineer exams are closed book.
That means your reference library stays in the study room. Use the books to build understanding, then practice without them.
PSI currently identifies ten reference families for Exam 314 preparation. With the exception of the specified 2014 Ugly's Electrical Reference, PSI states that any edition of the other listed references is acceptable.
Because Exam 314 is closed book, these are preparation resources rather than exam-room references.
The Washington DC Second Class Stationary Boilers Contractor Book Package bundles ten technical references to cover the broad Exam 314 subject list.
The current package includes study resources for high-pressure and low-pressure boilers, stationary engineering, steam-plant operation, boiler operation, refrigeration and air conditioning, electrical fundamentals, motor controls, and HVAC controls.
Because the examination is closed book, use the package as a technical training library. Build understanding first, then shift toward recall, calculations, and full-length practice without the books.
| Credential | Plant Scope | Experience Structure | Current Exam |
|---|---|---|---|
| Steam Engineer, Class 3 | Qualifying plants within Class 3 limits, including high-pressure configurations up to 400 HP | Class 3 qualifying experience routes | Exam 323, 70 questions, 2.5 hours, closed book |
| Steam Engineer, Class 2 | High-pressure steam plant up to 750 total HP of boilers and engines or refrigeration machinery | Class 3 experience foundation plus 1 year as assistant engineer in charge of a third-class plant | Exam 314, 80 questions, 3 hours, closed book |
The Board of Industrial Trades currently lists a $65 application fee for Steam and Other Operating Engineers.
The current license fee is $110 for up to two years. The current renewal fee is also $110, and the Board lists a $50 late-renewal fee.
Steam and Other Operating Engineer licenses currently expire on September 30 of even-numbered years.
PSI separately lists a current $52 CBT fee for Exam 314.
Second Class preparation works best when you stop treating every chapter as a separate island. Boilers, turbines, feedwater, condensate, pumps, motors, controls, chillers, cooling towers, water treatment, combustion, and environmental equipment all affect one another.
Follow energy and fluid through the plant. Ask what happens if feedwater fails, condenser vacuum drops, a pump cavitates, water chemistry goes out of control, a burner loses proper air-fuel ratio, a control signal fails, or a refrigeration system loses heat-rejection capacity.
Review the Washington DC Second Class Stationary Boilers Contractor collection at 1ExamPrep for exam-focused study materials.
For the full technical library, review the Second Class Stationary Boilers Contractor Book Package.
For licensing support, review 1ExamPrep application services. For books, exam preparation, licensing expenses, and related professional costs, review 1ExamPrep financing options.
The District credential associated with Exam 314 is Steam Engineer, Class 2. The 1ExamPrep product name includes "Contractor," but the license itself is an individual Steam Engineer credential.
Current District regulations authorize Class 2 operation of a high-pressure steam plant where the total horsepower of the boilers and engines or refrigeration machinery does not exceed 750 horsepower.
The applicant must satisfy the experience required for examination for the Class 3 Steam Engineer license and then complete one additional year as an assistant engineer in charge of a third-class plant.
Class 2 builds on the Class 3 experience foundation. The Class 3 rule provides a one-year experience reduction for certain mechanical-engineering or approved engineer-apprentice graduates. The Class 2 rule separately adds one year as assistant engineer in charge of a third-class plant.
The District's current Stationary Engineers instructions state that there is no general waiver or reciprocity for stationary engineers.
The current PSI examination is 314 Washington DC Second Class Stationary Boilers.
The current examination contains 80 multiple-choice questions.
Candidates currently receive three hours.
No. The current Second Class Stationary Boilers examination is closed book.
Turbines, Design Auxiliaries, and Operations is the largest published category at 15 percent.
Yes. Refrigeration, Air Conditioning, and Cooling Towers represent 8 percent of the current exam blueprint.
Yes. Waste to Energy Plants and Environmental/Pollution Control represent 7 percent of the current exam outline.
PSI lists ten reference families covering boilers, stationary engineering, steam-plant operation, refrigeration and air conditioning, electrical reference material, motor controls, and HVAC controls. The current bulletin specifically lists 2014 Ugly's Electrical Reference.
Steam and Other Operating Engineer licenses currently expire September 30 of even-numbered years.
The Washington, DC Second Class Stationary Boilers examination is the testing path associated with the individual Steam Engineer, Class 2 credential. Although the 1ExamPrep collection name includes the word "Contractor," the District license tied to Exam 314 is an individual stationary-engineer credential.
Class 2 is a major progression from Class 3. Current District regulations authorize a Class 2 Steam Engineer to take charge of and operate a high-pressure steam plant where the total horsepower of boilers and engines or refrigeration machinery does not exceed 750 horsepower.
The experience rule also builds directly on Class 3. A Class 2 applicant must first satisfy the experience required for examination for the Class 3 Steam Engineer license. The applicant then needs one additional year as an assistant engineer in charge of a third-class plant.
That structure is worth documenting carefully. The underlying Class 3 experience and the added Class 2 year should be clear in the Employment Verification Letter or related records. Plant size, job title, dates, and responsibilities help show the Board exactly how the applicant qualifies.
The underlying Class 3 rules currently recognize more than one experience pathway and also provide a one-year experience reduction for certain graduate mechanical engineers and graduates of approved engineer apprentice training programs. The Class 2 regulation separately adds its one-year assistant-engineer requirement.
The District's current Stationary Engineers instructions state that there is no general waiver or reciprocity for stationary engineers. Applicants holding licenses elsewhere should still expect to complete the District's Class 2 licensing process.
The current licensing examination is Exam 314 Washington DC Second Class Stationary Boilers. It contains 80 multiple-choice questions, allows three hours, is closed book, and currently carries a $52 computer-based testing fee.
Turbines, Design Auxiliaries, and Operations is the largest individual category at 15 percent. Boiler Operations, Maintenance, and Safety is 9 percent. Water Treatment, Boiler Accessories and Auxiliary Equipment, Electrical, Pumps and Condensate Systems, Refrigeration/Air Conditioning/Cooling Towers, and Boiler Design and Principles are each 8 percent.
Waste to Energy Plants and Environmental/Pollution Control is 7 percent. Boiler Combustion and Fuels is 7 percent. Engineering Calculations is 7 percent. Pneumatic and Electronic Controls are also 7 percent.
The broad blueprint means candidates should not study Class 2 as a boiler-only exam. Turbines, electrical systems, refrigeration, cooling towers, pumps, controls, environmental systems, and engineering calculations are all part of the tested knowledge.
The closed-book format makes active recall especially important. Study with the technical references, then put the books away and explain the system from memory. Draw turbine steam paths, feedwater systems, condensate systems, refrigeration cycles, control loops, and plant arrangements. Practice calculations until the setup is familiar without needing a worked example beside you.
PSI currently lists ten reference families for Exam 314, including boiler, stationary-engineering, steam-plant, refrigeration, electrical, motor-control, and HVAC-control resources. Except for the specifically listed 2014 Ugly's Electrical Reference, PSI currently accepts any edition of the other listed references.
The 1ExamPrep Second Class Stationary Boilers Contractor Book Package collects ten technical references into one study library. Because the exam is closed book, the value of the package is in building technical knowledge, calculation skill, recall, and understanding before exam day.
Steam and Other Operating Engineer licenses currently expire September 30 of even-numbered years. The Board currently lists a $65 application fee, $110 license fee, and $110 renewal fee, along with a $50 late-renewal fee.
Strong Class 2 preparation should feel like learning an entire plant, not memorizing one boiler. Understand how steam, feedwater, turbines, condensate, pumps, motors, controls, chillers, cooling towers, fuel systems, water treatment, and environmental equipment connect. That systems-level understanding matches both the Class 2 operating responsibility and the current Exam 314 blueprint.
Washington, DC's Second Class Stationary Boilers exam is connected to the Steam Engineer, Class 2 license. The 1ExamPrep collection includes the word "Contractor," but the District credential itself is an individual Class 2 Steam Engineer license.
A Class 2 Steam Engineer can take charge of and operate a high-pressure steam plant where the total horsepower of the boilers and engines or refrigeration machinery does not exceed 750 horsepower.
To qualify for Class 2, you first need to satisfy the experience required for the Class 3 Steam Engineer examination. You then need one additional year of experience as an assistant engineer in charge of a third-class plant.
The Class 3 foundation has its own experience routes. It also includes a one-year experience reduction for certain mechanical-engineering graduates and graduates of approved engineer apprentice training programs. Class 2 still adds the separate assistant-engineer year.
Steam Engineer applicants currently need an Employment Verification Letter. Keep records that show your plant size, plant type, dates, position, and duties. This is especially important because Class 2 is a progression license.
The District currently says there is no general waiver or reciprocity for stationary engineers. An outside license should not be treated as an automatic substitute for the DC process.
The current test is Exam 314 Washington DC Second Class Stationary Boilers. It has 80 multiple-choice questions and gives you three hours. The exam is closed book, and PSI currently lists a $52 computer-based exam fee.
Turbines, Design Auxiliaries, and Operations is the biggest section at 15 percent. Boiler Operations, Maintenance, and Safety is 9 percent. Water Treatment is 8 percent. Boiler Accessories and Auxiliary Equipment is 8 percent. Electrical is 8 percent. Pumps and Condensate Systems are 8 percent. Refrigeration, Air Conditioning, and Cooling Towers are 8 percent. Boiler Design and Principles are also 8 percent.
Waste-to-Energy and Environmental/Pollution Control is 7 percent. Boiler Combustion and Fuels is 7 percent. Engineering Calculations is 7 percent. Pneumatic and Electronic Controls are another 7 percent.
Because the exam is closed book, study for recall. Learn the systems first, then close the book and explain them. Draw turbine systems, boiler systems, feedwater systems, controls, pumps, condensate loops, chillers, and cooling towers from memory.
Practice calculations too. Exam 314 gives you about 2.25 minutes per question on average. You should be comfortable setting up common engineering calculations without needing to search a reference.
PSI currently lists ten reference families for preparing for Exam 314. They cover boilers, stationary engineering, steam plants, refrigeration, electrical systems, motor controls, and HVAC controls. The bulletin specifically lists 2014 Ugly's Electrical Reference.
The 1ExamPrep Second Class Stationary Boilers Contractor Book Package combines these subjects into one broad study library. Since the examination is closed book, use the references to build knowledge before the test rather than expecting to use them during the test.
Steam and Other Operating Engineer licenses currently expire September 30 of even-numbered years. The Board currently lists a $65 application fee, $110 license fee, and $110 renewal fee.
Use the Washington DC Second Class Stationary Boilers Contractor collection from 1ExamPrep to review study materials for Exam 314, turbines, boiler operation, water treatment, controls, pumps, refrigeration, electrical systems, environmental controls, calculations, and closed-book preparation.