Florida Window and Door Installation Specialty Contractor License Exam Highlighted & Tabbed Book Set

  • $1,195.00
  • Save $133
Shipping calculated at checkout.

Call to ask about financial assistance

100% safasfaction

FLORIDA WINDOW AND DOOR INSTALLATION SPECIALTY CONTRACTOR LICENSE EXAM HIGHLIGHTED & TABBED BOOK SET

The Florida Window and Door Installation Specialty Contractor License Exam Highlighted & Tabbed Book Set from 1 Exam Prep provides a complete collection of state-approved references for the Florida Construction Industry Licensing Board (CILB) trade and business exams. Each book in this set is professionally highlighted and tabbed to guide candidates through critical topics including window and door system installation, glazing requirements, code compliance, fastener standards, and safety procedures under the Florida Building Code. This resource is specifically designed for individuals pursuing the Window and Door Specialty Contractor License, supporting HVAC and general contractor education programs, contractor schools, and licensing exam preparation aligned with Florida contractor certification standards.


Artfully and skillfully tabbed and highlighted by hand, with tabs that are easy to read and navigate and vibrant highlights.

The Florida State Window and Door Installation Contractor trade exam book package includes the following tabbed and highlighted references allowed into the exam:

  1. Walker’s Building Estimator’s Reference Book, 33rd Edition, 2024
  2. Florida Contractors Manual, 2021
  3. Code of Federal Regulations, (OSHA) 29 Part 1926
  4. Residential Windows: A Guide to New Technologies and Energy Performance, 2007 (3rd ed.)
  5. Florida Building Code - Building, 2023
  6. Florida Building Code - Residential, 2023

A “window and door installation contractor” is qualified and certified by the board to install, replace, adjust, repair, and service, when not prohibited by law, in accordance with accepted engineering data and or according to manufacturers’ specification of exterior windows and doors, hurricane protection devices, shutters, and hardware in connection therewith which do not affect structural changes, except the replacement of window bucks in retrofit.

*Please allow an additional 15 business days on tabbed and highlighted trade book package orders.*


We Also Recommend