Nevada Excavating, Grading, Trenching and Surfacing Contractor (A-12) Exam Book Package

Nevada Excavating, Grading, Trenching and Surfacing Contractor (A-12) Exam Book Package

Regular price $1,095.00
Sale price $1,095.00 Regular price $1,195.00
Sale Sold out
Shipping calculated at checkout.

CALL TO ASK ABOUT FINANCIAL ASSISTANCE

  • image-right
Customer Reviews
View full details

Nevada Excavating, Grading, Trenching and Surfacing Contractor (A-12) Exam Book Package

Prepare for the Nevada Excavating, Grading, Trenching and Surfacing Contractor (A-12) examination with a comprehensive study package built around the technical references used for earthwork, excavation, grading, trenching, paving, surfacing, heavy equipment, concrete, asphalt, construction safety, and underground utility awareness.

This Nevada A-12 Exam Book Package includes Standard Specifications for Road and Bridge Construction, Nevada Department of Transportation, 2001, Moving the Earth: Excavation Equipment, Method, Pipe and Excavation Contracting, Excavation and Grading Handbook, Nick Capachi, 2006, Carpentry and Building Construction, 2016, Construction Planning, Equipment, and Methods, 10th Edition, Code of Federal Regulations - 29 CFR Part 1926 (OSHA), Hot Mix Asphalt Paving Handbook, The Contractor's Guide to Quality Concrete Construction - 4th Edition, and Suggested Marking Guidelines and The Nevada One Call Law.

The Nevada A-12 trade examination is a closed-book examination. These references are study materials used to prepare before test day and are not permitted inside the examination center. That makes understanding, recall, and practical application especially important. Candidates should use the books to learn the concepts thoroughly instead of depending on reference navigation during the exam.

The A-12 classification combines excavation and grading work with trenching and the placement of pavement and surfaces made from graded mineral aggregates, asphalt, or concrete products. This broader scope makes the examination especially relevant to contractors involved in earthwork, road construction, site development, trench operations, paving, asphalt placement, concrete surfacing, and related heavy civil construction activities.

A strong preparation strategy should include repeated review of earthwork methods, equipment applications, paving procedures, trench safety, OSHA construction requirements, Nevada One Call responsibilities, asphalt practices, concrete quality, and field construction methods. The references included in this package help candidates build that knowledge across the major trade areas associated with the Nevada A-12 contractor examination.

Exam Details

The Nevada A-12 Excavating, Grading, Trenching and Surfacing Contractor trade examination contains 60 questions. Candidates are allowed 2 hours to complete the examination, and the minimum passing score is 42 correct answers.

The examination is organized into the following subject areas:

  • Earthwork Construction: 18 questions.
  • Tools and Equipment: 12 questions.
  • Paving and Surfacing Procedures: 20 questions.
  • Safety: 7 questions.
  • Nevada One-Call: 3 questions.

Paving and Surfacing Procedures is the largest portion of the exam, followed by Earthwork Construction and Tools and Equipment. Candidates should still prepare for every subject because safety and Nevada One-Call questions can have a meaningful impact on the final score.

With 60 questions and two hours available, candidates have an average of approximately two minutes per question. Since the examination is closed book, there is no opportunity to search reference material during testing. Candidates should practice recognizing the correct construction principle, equipment application, safety procedure, or paving method quickly and accurately.

The A-12 classification includes all work authorized under the A-7 Excavating and Grading classification, along with the mixing, fabrication, and placement of pavement and surfaces consisting of graded mineral aggregates, asphalt, or concrete products. Candidates should therefore prepare for both earthwork and surfacing knowledge.

Closed Book Test

The Nevada A-12 Excavating, Grading, Trenching and Surfacing examination is a closed-book test. The books included in this package are intended for study and preparation before the examination and are not allowed inside the examination center.

Closed-book testing requires a different study approach than an open-book contractor exam. Instead of focusing on where a rule appears in a reference, candidates should focus on understanding the rule, recognizing when it applies, and recalling the correct construction practice without consulting a book.

After studying a chapter or subject area, close the book and answer practice questions from memory. Then return to the reference to review missed concepts. This type of active recall is especially useful for earthwork terminology, equipment applications, paving procedures, concrete practices, OSHA safety requirements, and underground utility responsibilities.

Scenario-based study can also be effective. Consider what equipment would be appropriate for a particular excavation, how a trench should be protected, how material should be compacted, what steps are involved in asphalt placement, or what responsibilities apply before excavation begins near underground facilities.

Because candidates cannot consult these references during the exam, repeated review should continue until major trade concepts can be recognized and applied without book assistance.

Licensing Steps

The Nevada A-12 trade examination is one component of the Nevada contractor licensing process. Candidates must satisfy the applicable licensing requirements in addition to completing the trade exam.

  1. Confirm the correct classification. Determine that the A-12 Excavating, Grading, Trenching and Surfacing classification matches the work the business intends to perform.
  2. Identify the trade qualifying individual. The business must designate an individual who meets the experience requirements for the requested classification.
  3. Document qualifying experience. Prepare experience records showing applicable work in excavation, grading, trenching, surfacing, paving, earthwork, or closely related construction activities.
  4. Complete the Nevada contractor license application. Provide the required business, qualifying individual, experience, financial, and supporting information.
  5. Submit the application for review. The Nevada State Contractors Board reviews the application and experience documentation.
  6. Receive examination eligibility. Examination scheduling can proceed after the applicant receives authorization to test.
  7. Prepare for the A-12 trade examination. Study earthwork, paving, surfacing, equipment, safety, and Nevada One-Call subjects using the references in this package.
  8. Complete required examinations. The qualifying individual generally must pass the applicable trade examination and Business and Law examination unless an approved waiver applies.
  9. Complete remaining licensing requirements. Financial responsibility, bonding, and other applicable requirements must be satisfied before the contractor license is issued.

Because the A-12 examination is closed book, candidates benefit from beginning their study process early. The reference list covers a wide range of heavy civil construction topics, and consistent preparation makes it easier to build understanding across multiple subjects.

State Requirements

The Nevada A-12 Excavating, Grading, Trenching and Surfacing classification is part of the state's general engineering contractor classifications.

The A-12 scope includes all work authorized under the A-7 Excavating and Grading classification. That includes digging, moving, and placing earth material through cutting, filling, excavating, grading, backfilling, trenching, and similar operations. The A-12 classification additionally includes the mixing, fabrication, and placement of pavement and surfaces consisting of graded mineral aggregates, asphalt, or concrete products.

The trade qualifying individual generally must have at least four full years of qualifying experience within the 15 years immediately before the contractor license application is filed. The experience must be in the specific classification requested and may be established through qualifying work as a journeyman, supervising employee, or contractor.

Accepted education or training may be used toward a portion of the experience requirement under Nevada licensing rules. Applicants must also meet applicable financial responsibility and bonding requirements before a contractor license is issued.

The qualifying individual generally must pass the Nevada Business and Law examination and the applicable A-12 trade examination unless an authorized waiver applies. Examination scheduling takes place after the application is submitted, experience requirements are reviewed, and examination eligibility is issued.

Reference Books

  • Standard Specifications for Road and Bridge Construction, Nevada Department of Transportation, 2001
    This reference supports preparation involving road construction specifications, earthwork, grading, materials, embankments, pavement, aggregates, construction procedures, and related Nevada transportation construction requirements.
  • Moving the Earth: Excavation Equipment, Method
    This reference supports study of earthmoving operations, excavation methods, heavy equipment applications, production concepts, material movement, operating practices, and equipment planning.
  • Pipe and Excavation Contracting
    This book covers trenching, excavation, pipe installation, backfilling, grading, site work, equipment applications, field procedures, and practical excavation contracting concepts.
  • Excavation and Grading Handbook, Nick Capachi, 2006
    This handbook addresses site preparation, excavation, grading, soil movement, drainage, slopes, earthwork quantities, compaction, equipment, and practical grading operations.
  • Carpentry and Building Construction, 2016
    This construction reference supports general knowledge involving layout, foundations, concrete, building methods, construction terminology, and jobsite practices that may intersect with excavation and site-development work.
  • Construction Planning, Equipment, and Methods, 10th Edition
    This reference covers equipment selection, construction planning, earthmoving, excavation, compaction, productivity, hauling, material handling, and heavy construction methods.
  • Code of Federal Regulations - 29 CFR Part 1926 (OSHA)
    This construction safety reference addresses excavation and trenching hazards, protective systems, jobsite safety, equipment operations, access, material handling, personal protective equipment, and other federal construction safety requirements.
  • Hot Mix Asphalt Paving Handbook
    This handbook supports preparation involving asphalt materials, paving operations, placement, compaction, paving equipment, quality considerations, and procedures used in hot-mix asphalt construction.
  • The Contractor's Guide to Quality Concrete Construction - 4th Edition
    This reference supports preparation involving concrete materials, placement, finishing, curing, quality practices, project coordination, and construction procedures associated with concrete surfaces.
  • Suggested Marking Guidelines and The Nevada One Call Law
    This material supports preparation involving excavation notification, underground facility marking, damage prevention, utility-location practices, and responsibilities that apply before and during excavation near underground facilities.

Because the A-12 examination is closed book, these references should be used to develop understanding and recall rather than exam-room navigation skills.

Test Information and Study Materials

The A-12 exam content outline provides a useful framework for organizing study time. Candidates should divide preparation among Earthwork Construction, Tools and Equipment, Paving and Surfacing Procedures, Safety, and Nevada One-Call.

Earthwork Construction accounts for 18 questions. Study excavation methods, grading, cut-and-fill operations, backfilling, compaction, soil handling, site preparation, drainage considerations, trenching, and material movement. Candidates should understand how soil conditions and project requirements influence the methods used in the field.

Tools and Equipment accounts for 12 questions. Review excavators, loaders, bulldozers, graders, scrapers, compactors, trucks, paving machines, rollers, and other equipment commonly used in heavy construction. Understand what each machine is designed to do and how site conditions, production requirements, and haul distances influence equipment selection.

Paving and Surfacing Procedures accounts for 20 questions, making it the largest section of the exam. Candidates should review asphalt paving, aggregate surfaces, concrete surfaces, base preparation, material placement, compaction, finishing, quality control concepts, and the equipment used to create finished pavement.

The Hot Mix Asphalt Paving Handbook should be used to develop a practical understanding of asphalt paving procedures. Study material delivery, placement, paving equipment, compaction, rolling patterns, temperature-related considerations, joints, and factors that influence finished pavement quality.

The Contractor's Guide to Quality Concrete Construction should be used for concrete-related preparation. Review concrete materials, placement, consolidation, finishing, curing, construction practices, and quality considerations relevant to concrete pavement and surfaces.

Safety accounts for seven questions. OSHA 29 CFR Part 1926 is particularly important for excavation and trenching contractors because earthwork can expose employees to cave-ins, falling materials, heavy equipment, hazardous access conditions, and underground utilities.

Study trench protective systems, access and egress concepts, spoil placement, equipment hazards, inspections, personal protective equipment, and safe operating practices. Since the book cannot enter the examination, focus on understanding how safety rules apply in practical scenarios.

Nevada One-Call accounts for three questions. Although this is the smallest section, candidates should not ignore it. Excavation contractors have important responsibilities involving underground facility notification and damage prevention.

Study the Suggested Marking Guidelines and Nevada One Call Law so you understand the basic responsibilities associated with requesting utility locations, recognizing markings, protecting underground facilities, and coordinating excavation activities around known utilities.

Practice questions should be incorporated throughout preparation. After reviewing a topic, answer questions without opening the book. Record the subjects you miss and return to those areas for additional study.

Equipment questions are often easier when learned through application. Instead of simply memorizing equipment names, connect each machine to the type of job it performs. Think about what would be used to excavate material, push soil, fine-grade a surface, transport material, compact a base, or place asphalt.

Paving questions should also be studied as a process. Review how the underlying surface is prepared, how material is delivered and placed, how compaction is performed, and how quality problems can develop when one part of the sequence is incorrect.

Earthwork calculations and quantity concepts should be practiced regularly. Candidates should be comfortable with common measurements, volume concepts, slopes, grades, production considerations, and other mathematical applications used in excavation and grading work.

Because the test provides approximately two minutes per question on average, timed practice can help candidates improve decision-making. Work through sets of questions without reference books to reproduce the closed-book testing environment.

How 1 Exam Prep Helps You Reach Your Goal

1 Exam Prep supports Nevada A-12 Excavating, Grading, Trenching and Surfacing candidates through organized study guidance, trade-focused review, practice-oriented preparation, and a structured approach to closed-book exam study.

This book package brings together references covering earthwork, heavy equipment, trenching, road construction, asphalt paving, concrete construction, OSHA safety, and Nevada One-Call requirements. That combination helps candidates study the major areas represented on the A-12 examination.

Because the exam is closed book, 1 Exam Prep encourages preparation that emphasizes understanding and recall. Candidates should study a topic, practice applying it without the book, identify weaker areas, and return to the references for targeted review.

Trade-focused study also helps connect technical concepts to real construction situations. Equipment selection becomes easier to remember when connected to actual earthmoving operations. OSHA requirements become more meaningful when considered in the context of trenching and excavation hazards. Asphalt and concrete procedures become easier to understand when studied as complete construction processes.

Practice-oriented preparation can help candidates find areas where additional review is needed. A candidate who struggles with paving questions can spend more time with asphalt and concrete references, while someone who misses equipment questions can focus on construction planning and earthmoving resources.

1 Exam Prep also helps candidates organize study around the exam content outline. With Paving and Surfacing Procedures representing the largest subject area, candidates can prioritize that material while still dedicating sufficient time to earthwork, equipment, safety, and Nevada One-Call topics.

A consistent study routine can help build stronger recall, practical understanding, and confidence working through closed-book contractor exam questions. The goal is to help candidates approach the Nevada A-12 examination with a clear preparation structure and familiarity with the major technical subjects involved in excavation, grading, trenching, and surfacing work.

What books are included in the Nevada A-12 Exam Book Package?

The package includes the Nevada Department of Transportation Standard Specifications for Road and Bridge Construction, Moving the Earth, Pipe and Excavation Contracting, Excavation and Grading Handbook, Carpentry and Building Construction, Construction Planning, Equipment, and Methods, OSHA 29 CFR Part 1926, Hot Mix Asphalt Paving Handbook, The Contractor's Guide to Quality Concrete Construction, and Suggested Marking Guidelines and The Nevada One Call Law.

Is the Nevada A-12 examination open book?

No. The Nevada A-12 Excavating, Grading, Trenching and Surfacing examination is a closed-book test.

Can I bring these books into the Nevada A-12 exam?

No. The books in this package are study references for preparation before the examination and are not allowed inside the examination center.

How many questions are on the Nevada A-12 exam?

The Nevada A-12 trade examination contains 60 questions.

How much time is allowed for the A-12 exam?

Candidates have 2 hours to complete the examination.

What score is required to pass?

The minimum passing score is 42 correct answers out of 60 questions.

What is the largest subject area on the A-12 exam?

Paving and Surfacing Procedures is the largest section with 20 questions, followed by Earthwork Construction with 18 questions.

Does the A-12 classification include excavation and grading?

Yes. The A-12 classification includes the work authorized under A-7 Excavating and Grading and additionally covers the mixing, fabrication, and placement of pavement and surfaces made from graded mineral aggregates, asphalt, or concrete products.

Why is the Hot Mix Asphalt Paving Handbook included?

The handbook supports study of asphalt materials, paving operations, placement, compaction, equipment, and quality-related procedures associated with pavement construction.

Why is a concrete construction reference included?

The A-12 classification includes surfaces made from concrete products. The Contractor's Guide to Quality Concrete Construction supports preparation involving concrete placement, finishing, curing, and quality construction practices.

Why should I study Nevada One-Call requirements?

The A-12 examination includes Nevada One-Call questions, and excavation contractors must understand underground facility notification, marking, and damage-prevention responsibilities.

How should I prepare for the closed-book A-12 exam?

Study each subject thoroughly, practice questions without using the books, review incorrect answers, and repeat weaker topics until you can recognize and apply the concepts independently.

Does this exam book package guarantee a passing score?

No. The package provides study references to support structured preparation for the Nevada A-12 contractor examination. Exam results depend on each candidate's knowledge, preparation, and performance.