Prepare for the Nevada Photovoltaics Contractor (C-2G) licensing examination with a Books & Course Rental package built around the approved electrical code reference, Nevada business and law preparation, and structured course access. This package includes the NFPA 70 - National Electrical Code, 2017 edition and the Construction Business and Law Manual for Nevada, with supplied books highlighted and tabbed to support organized study and faster reference navigation.
The Nevada C-2G Photovoltaics classification focuses on the installation, alteration, and repair of photovoltaic cells, batteries, and inverters used to convert solar energy into electricity. Candidates preparing for this classification should be comfortable with photovoltaic theory, electrical interconnection, system components, installation methods, calculations, design considerations, permitting, utility interconnection, and safety.
The C-2G trade examination is an open-book test, and the NFPA 70 - National Electrical Code, 2017 edition is the code reference allowed in the examination center. Candidates should use the NEC throughout preparation so they become familiar with its layout, terminology, articles, tables, definitions, and index before test day.
The Construction Business and Law Manual for Nevada is included to support preparation for Nevada's contractor management and business and law examination. Nevada requires contractor applicants to satisfy applicable business and law and trade examination requirements unless an authorized waiver applies.
This rental package also includes 6 months of course access, giving candidates a structured period for reviewing photovoltaic trade material, practicing NEC navigation, studying business and law topics, and working through practice-oriented preparation.
The rental cost is $789, plus a refundable book deposit of $200, for a total due today of $989. The $200 deposit is refundable when the books are returned within the rental period in similar condition.
Please allow up to 15 business days for Book & Course Rental - Exam Room Approved Package orders.
The highlighted and tabbed format is designed to help candidates spend more study time working with important material and less time becoming familiar with the physical organization of the books. Repeated use of the tabs and highlighted sections can help build a consistent reference-navigation routine before the examination.
The Nevada C-2G Photovoltaics trade examination is administered through PSI for the Nevada State Contractors Board. Candidates must first complete the applicable contractor licensing process and receive examination eligibility before scheduling the required examination.
The official C-2G examination content outline includes the following subject areas:
Estimating, calculations, and design represent the largest portion of the examination, followed by electrical interconnection and photovoltaic components. Candidates should build a study plan that reflects the weighting of these areas while still reviewing every subject on the official outline.
The Nevada C-2G Photovoltaics examination is an open-book test. The approved reference included in this rental package for the C-2G trade examination is the NFPA 70 - National Electrical Code, 2017 edition.
PSI permits approved reference material to be highlighted, underlined, and indexed before the examination. References may not contain additional loose or attached papers. Permanent tabs are allowed, while temporary tabs such as Post-it notes are not permitted.
The highlighted and tabbed NEC supplied with this package helps candidates prepare using the same code edition identified for the examination. Candidates should practice finding requirements involving photovoltaic systems, conductors, overcurrent protection, grounding and bonding, wiring methods, disconnecting means, electrical equipment, services, and other code areas related to photovoltaic installations.
An open-book exam still requires technical knowledge. Searching the NEC for every question can consume valuable testing time. A stronger approach is to understand the photovoltaic or electrical concept first and then use the NEC to confirm a specific requirement, calculation method, exception, definition, or table value.
With 75 questions and 150 minutes, candidates have an average of about two minutes per question. Regular timed code-navigation practice can help build familiarity with the book and reduce unnecessary searching during the examination.
The C-2G examination is one part of the Nevada contractor licensing process. Candidates must complete the applicable licensing requirements in addition to preparing for the trade examination.
Nevada classifies C-2G Photovoltaics as a specialty area within electrical contracting. The classification authorizes the installation, alteration, and repair of photovoltaic cells, batteries, and inverters used in the conversion of solar energy into electricity.
The scope does not extend to the installation, alteration, or repair of electrical wires beyond the service panel under the C-2G classification. The classification is directed toward qualifying photovoltaic work rather than unrestricted electrical contracting.
Because photovoltaic systems combine electrical equipment with solar-energy technology, candidates should understand both the electrical-code requirements and the practical operation of photovoltaic components. Modules, conductors, inverters, batteries, disconnects, grounding components, overcurrent protection, and system interconnection all work together as part of the complete installation.
Nevada contractor licensing includes requirements beyond passing the trade examination. The Nevada State Contractors Board determines applicant qualifications and examination eligibility, and applicants must satisfy applicable business, experience, financial, examination, and licensing requirements.
For the Nevada C-2G Photovoltaics trade examination, the exam-room-approved reference included with this package is:
The 2017 NEC should be used regularly throughout preparation. Candidates should learn how to navigate by article, subject, table, definition, and index term rather than depending on memorized page numbers.
The Construction Business and Law Manual for Nevada is included for Nevada business and law preparation and is the approved reference used for the open-book Nevada contractor management examination.
Because the books supplied with this package are highlighted and tabbed, candidates can use the same prepared references throughout their study period to develop a repeatable navigation method.
A strong C-2G study plan should combine photovoltaic trade knowledge, electrical theory, NEC navigation, calculations, system design, safety, and Nevada business and law preparation.
Photovoltaic Theory should include the fundamental principles involved in converting solar energy into electrical energy. Candidates should understand the relationships among photovoltaic modules, arrays, voltage, current, power, and system output.
Electrical Interconnection represents a major examination category. Preparation should include how photovoltaic equipment interfaces with electrical systems, along with applicable conductors, overcurrent protection, disconnecting means, grounding, bonding, and code requirements.
Photovoltaic Components should be studied as parts of a complete system. Candidates should understand the purpose and interaction of modules, inverters, batteries, conductors, combiner equipment, disconnects, protective devices, and other system components.
Photovoltaic Installation should include practical system assembly, conductor routing, equipment installation, electrical connections, protection, grounding, mounting considerations, and proper installation methods.
Estimating, Calculations, and Design account for 20 examination questions, making this the largest content area. Candidates should devote meaningful study time to calculations and system-design concepts rather than depending solely on code-book lookup skills.
Permitting, Inspection, and Utility Interconnections should also be part of preparation. Photovoltaic work must integrate technical installation knowledge with applicable inspection and interconnection considerations.
Safety should be reviewed throughout preparation rather than treated as a separate final topic. Photovoltaic work presents electrical hazards and can involve energized equipment, stored energy, rooftop work, tools, and other jobsite risks.
For NEC preparation, practice identifying the subject before opening the book. If a question involves grounding, determine whether it concerns equipment grounding, bonding, grounding electrodes, or another grounding concept. If it involves conductors, identify whether the issue relates to ampacity, sizing, protection, routing, or another requirement.
The included 6 months of course access gives candidates time to work through these subjects in a structured format while repeatedly using the highlighted and tabbed references. Practice-oriented study can help identify weaker areas so additional time can be directed toward calculations, electrical interconnection, components, code navigation, or business and law.
The Construction Business and Law Manual for Nevada should also be incorporated into the regular study schedule. Alternating trade preparation with business and law review can help candidates maintain a balanced approach to the overall contractor licensing process.
1 Exam Prep supports Nevada Photovoltaics Contractor candidates through organized study guidance, trade-focused review, practice-oriented preparation, reference navigation, and a structured approach to both C-2G technical material and Nevada contractor business and law.
This Books & Course Rental package provides the NFPA 70 - National Electrical Code, 2017 edition and the Construction Business and Law Manual for Nevada in highlighted and tabbed format. The prepared references can help candidates spend their study time learning how to locate and apply important material efficiently.
The included 6 months of course access provides a structured period for reviewing photovoltaic theory, electrical interconnection, components, installation, calculations, design, safety, NEC navigation, and Nevada business and law topics.
Reference navigation is particularly important for the open-book C-2G trade examination. Candidates can practice with the 2017 NEC before exam day and develop familiarity with its index, definitions, articles, tables, cross-references, and photovoltaic-related requirements.
1 Exam Prep encourages candidates to combine reference navigation with actual trade knowledge. Understanding the technical issue before searching the NEC can help make code research more focused and efficient.
The goal is to provide an organized study structure that supports stronger familiarity with the exam-room reference, photovoltaic trade concepts, calculations, business and law material, and the broader Nevada contractor licensing process.
The package includes the NFPA 70 - National Electrical Code, 2017 edition; Construction Business and Law Manual for Nevada; highlighted and tabbed book preparation; and 6 months of course access.
Yes. The Nevada C-2G Photovoltaics trade examination is open book with the approved 2017 National Electrical Code reference.
The C-2G Photovoltaics trade examination contains 75 questions.
Candidates are allowed 150 minutes to complete the examination.
The minimum passing score is 56 correct answers.
Yes. The supplied books are highlighted and tabbed to support organized review and reference navigation.
The package includes 6 months of course access.
The rental cost is $789, plus a $200 refundable book deposit, for a total due today of $989.
Yes. The $200 deposit is refundable when the books are returned within the rental period in similar condition.
Please allow up to 15 business days for Book & Course Rental - Exam Room Approved Package orders.
The official exam outline covers photovoltaic theory, electrical interconnection, permitting, inspection and utility interconnections, photovoltaic components, photovoltaic installation, estimating, calculations and design, and safety.
Regular NEC navigation practice helps candidates become familiar with the structure of the approved reference so they can locate applicable electrical requirements more efficiently during the timed open-book examination.