New Jersey UST Decommissioning - (ICC - U2) Exam Book Package

New Jersey UST Decommissioning - (ICC - U2) Exam Book Package

Regular price $1,545.00
Sale price $1,545.00 Regular price $1,645.00
Sale Sold out
Shipping calculated at checkout.

CALL TO ASK ABOUT FINANCIAL ASSISTANCE

  • image-right
Customer Reviews
View full details

New Jersey UST Decommissioning - (ICC - U2) Exam Book Package

The New Jersey UST Decommissioning - (ICC - U2) Exam Book Package is designed for candidates preparing for the ICC U2 Underground Storage Tank Decommissioning exam. This package brings together the UST installation, closure, federal regulatory, safety, and environmental compliance references used to study underground storage tank removal, closure in place, site safety, tank cleaning, vapor control, excavation, environmental protection, corrective action requirements, and documentation responsibilities.

UST decommissioning is a specialized area of environmental and petroleum equipment work. Candidates preparing for this exam need to understand the procedures and safety practices used when an underground storage tank system is taken out of service, closed, removed, cleaned, made safe, or abandoned in place according to applicable requirements. Decommissioning work can involve flammable vapors, petroleum residue, contaminated soil, excavation hazards, confined-space concerns, utility conflicts, regulatory reporting, disposal requirements, and detailed site documentation.

This exam book package is useful for New Jersey candidates who work in UST removal, environmental compliance, petroleum equipment contracting, tank closure, site remediation support, facility maintenance, inspection, and related construction or environmental services. The package is also helpful for contractors, technicians, supervisors, inspectors, and compliance personnel who need a structured reference set for studying UST decommissioning requirements.

The ICC U2 exam focuses on decommissioning knowledge for underground storage tank systems. Candidates should be prepared to study accepted practices for planning tank closure work, obtaining required approvals, controlling hazards, removing product and sludge, inerting or vapor-freeing tanks, managing excavation conditions, handling contaminated materials, protecting workers, documenting closure activities, and following applicable federal, state, and local requirements.

Because this examination is closed book, candidates must study the references thoroughly before exam day. The books and standards in this package should be used to build working knowledge, not simply as materials to bring into the testing room. A strong preparation plan should include careful review, topic-based study, repeated self-quizzing, and a clear understanding of UST closure procedures from planning through final documentation.

What You Get

  • Included Book: RP100 UST Installation: Recommended Practices for Installation of Underground Liquid Storage Systems (RP100), 2017
  • Included Book: PEI/RP 1700-18 Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems, PEI, 2018
  • Included Book: EPA 40 C.F.R. Part 280.10-280.74 and Subpart J, July 2015
  • Included Book: Health and Safety Training for Underground Storage Tank Inspectors Instructor's and Student Guide, June 1992
  • Exam-Focused Reference Package: A UST decommissioning book package designed for candidates preparing for the ICC U2 exam.
  • Closure and Safety Study Support: References covering underground storage tank systems, tank closure, decommissioning procedures, federal UST requirements, corrective action concepts, operator training provisions, and safety practices.

Exam Details

The ICC U2 UST Decommissioning exam is designed for candidates who need to demonstrate knowledge of underground storage tank closure and decommissioning practices. The exam covers the technical, environmental, and safety concepts involved when UST systems are removed from service, closed in place, or removed from the ground.

Exam preparation should include both regulatory knowledge and practical field understanding. Candidates should study how UST systems are planned, installed, operated, closed, and documented. Even though this product focuses on decommissioning, understanding basic UST system layout is important because removal and closure work require knowledge of tanks, piping, vents, spill containment, dispensers, sumps, monitoring equipment, backfill, corrosion protection, and surrounding site conditions.

Important study areas include closure planning, permit coordination, site assessment, tank cleaning, product removal, sludge handling, vapor hazards, atmospheric testing, excavation safety, tank inerting, tank removal, closure in place, contaminated soil handling, waste disposal, release reporting, corrective action, site restoration, and project documentation. Candidates should also understand that UST decommissioning work must be performed according to applicable federal, state, and local requirements.

PEI/RP 1700-18 is a central reference for this exam area because it addresses recommended practices for the closure of underground storage tank and shop-fabricated aboveground storage tank systems. Candidates should study this reference carefully for closure procedures, safety considerations, tank removal practices, abandonment in place, site assessment concepts, and documentation expectations.

EPA 40 C.F.R. Part 280.10-280.74 and Subpart J support study of federal UST technical standards, corrective action requirements, and operator training provisions. Candidates should understand how federal requirements connect to closure work, release response, corrective action, reporting, records, and compliance responsibilities.

Closed Book Test

The ICC U2 UST Decommissioning examination is a closed book test. Candidates should not plan to rely on reference lookup during the exam. Preparation should focus on understanding the material well enough to answer questions from memory and apply the concepts to practical decommissioning situations.

Closed book preparation requires a different study strategy than open book preparation. Candidates should read the references actively, take organized notes, create topic summaries, and review the major steps involved in tank closure from start to finish. Key topics should be reviewed repeatedly until the candidate can explain the procedure, safety concern, or regulatory concept without needing to look it up.

A strong closed book study routine should include memorizing major process sequences. For example, candidates should understand the order of planning, approvals, site preparation, utility review, product removal, vapor control, excavation, tank cleaning, tank removal or closure in place, waste management, sampling or assessment activities when required, backfilling, site restoration, and final documentation.

Candidates should also practice scenario-based thinking. UST decommissioning questions may involve field conditions such as flammable vapors, petroleum contamination, damaged piping, failed atmospheric testing, unexpected groundwater, nearby structures, unsafe excavation conditions, or improper disposal practices. Candidates should study how to recognize hazards and select the safest, most compliant response.

Licensing Steps

Candidates preparing for the New Jersey UST Decommissioning exam should begin by confirming that the ICC U2 exam matches their professional goal, employer requirement, regulatory requirement, or contractor qualification need. UST decommissioning work is regulated and may involve state-specific requirements, local permits, environmental reporting, health and safety procedures, and contractor responsibilities.

A practical preparation path starts with reviewing the exam title and gathering the required reference books. Candidates should then study the closure and regulatory references in a structured order. Begin with basic UST system concepts, then move into closure procedures, safety practices, environmental requirements, excavation concerns, corrective action concepts, and documentation responsibilities.

After reviewing the references, candidates should build a topic checklist. The checklist should include UST components, closure planning, tank removal, closure in place, product and sludge removal, vapor-freeing or inerting, flammable vapor hazards, atmospheric monitoring, excavation safety, contaminated soil handling, groundwater concerns, waste disposal, reporting, and final records. This approach helps candidates track progress and avoid missing major exam areas.

Candidates should also review New Jersey-specific UST requirements before performing decommissioning work. New Jersey projects may involve regulatory notifications, permits, certified contractor requirements, local fire code coordination, environmental sampling, waste disposal documentation, site remediation responsibilities, and records required by the applicable agency or authority.

After passing the exam, candidates should follow the requirements that apply to their role, employer, and project type. Passing an exam can support qualification, but UST decommissioning work must still be performed in compliance with applicable laws, permits, safety standards, environmental rules, and project-specific requirements.

State Requirements

This exam book package is written for New Jersey candidates preparing for the ICC U2 UST Decommissioning exam. New Jersey UST closure work may involve state environmental requirements, local requirements, project documentation, safety procedures, and coordination with the appropriate authorities.

New Jersey candidates should understand that underground storage tank closure is not simply a construction task. It is also an environmental compliance activity. A UST closure project may require notification, approved procedures, proper waste handling, contaminated soil management, site assessment, release reporting, and documentation of closure activities. Requirements can depend on the tank contents, tank condition, facility type, project scope, site history, and the authority having jurisdiction.

Candidates should study with New Jersey field conditions in mind. UST decommissioning work may occur at gasoline stations, fleet facilities, commercial properties, industrial sites, municipal facilities, or former petroleum storage locations. Each site can present different hazards and documentation needs. Candidates should be prepared to think through safe work practices and compliance responsibilities before any tank is uncovered, entered, cut, removed, transported, or abandoned in place.

Owners, operators, contractors, and workers involved in UST decommissioning should maintain records related to permits, notifications, testing, sampling, tank disposal, waste disposal, backfill, site restoration, release response, and final closure. Proper documentation is essential because tank closure activities may be reviewed by regulators, facility owners, environmental consultants, insurers, or future property stakeholders.

Reference Books

  • Included Book: RP100 UST Installation: Recommended Practices for Installation of Underground Liquid Storage Systems (RP100), 2017
    This recommended practice supports study of underground liquid storage system components and installation practices. It is useful for decommissioning preparation because candidates need to understand tank system layout, piping, excavation, backfill, anchoring, corrosion protection, venting, containment, and other system features encountered during removal or closure work.
  • Included Book: PEI/RP 1700-18 Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems, PEI, 2018
    This recommended practice is a key study reference for tank closure. It supports review of closure planning, tank cleaning, vapor control, removal procedures, closure in place, safety practices, site assessment, waste handling, and documentation for UST and shop-fabricated AST closure work.
  • Included Book: EPA 40 C.F.R. Part 280.10-280.74 and Subpart J, July 2015
    This federal regulatory reference covers UST technical standards, corrective action requirements, and operator training provisions. It supports study of regulated UST systems, performance standards, operating requirements, release detection, release reporting, corrective action, closure-related responsibilities, and compliance concepts.
  • Included Book: Health and Safety Training for Underground Storage Tank Inspectors Instructor's and Student Guide, June 1992
    This safety training reference supports study of hazards associated with underground storage tank inspection and related field work. It is useful for candidates reviewing petroleum vapor hazards, flammability, toxic exposure, personal protective equipment, site safety, atmospheric testing, excavation hazards, and safe work practices.

Test Information and Study Materials

The UST Decommissioning exam requires candidates to understand how underground storage tank systems are safely and properly removed from service. A strong study plan should begin with basic UST system knowledge. Candidates should know the function of tanks, piping, vents, fill pipes, spill containment, dispensers, overfill prevention equipment, leak detection components, corrosion protection, sumps, secondary containment, and associated electrical or monitoring systems.

Closure planning is one of the most important study areas. Before decommissioning begins, the work should be planned carefully. Candidates should understand the need to identify the tank system, review site history, coordinate required notifications, obtain applicable permits, locate utilities, evaluate surrounding structures, establish safety controls, prepare equipment, and confirm how product, sludge, contaminated materials, and the tank itself will be handled.

Product removal and tank cleaning should receive focused attention. Tanks that once held petroleum or other regulated substances can contain liquid product, sludge, residue, and flammable or toxic vapors. Candidates should study how product and residue are removed, how tanks are cleaned, how vapors are controlled, and why cutting or handling tanks without proper preparation can create serious fire, explosion, or exposure hazards.

Vapor control is a major safety topic. Candidates should understand flammable vapor hazards, lower explosive limit concepts, atmospheric testing, ventilation, inerting, vapor-freeing, ignition-source control, and the importance of confirming safe conditions before work proceeds. UST decommissioning can become dangerous when vapors are underestimated or when tanks are handled before they are properly cleaned and tested.

Excavation safety is also important. Tank removal can involve excavation around buried tanks and piping. Candidates should study hazards related to cave-ins, equipment movement, unstable soils, nearby utilities, groundwater, contaminated soil, confined work areas, and access control. Safe excavation practices protect workers, nearby property, and the environment.

Closure in place should be studied separately from tank removal. Some projects may involve abandoning a tank in place when removal is not practical or when allowed by applicable requirements. Candidates should understand that closure in place requires proper cleaning, safety controls, filling with approved inert material, documentation, and compliance with all applicable requirements.

Environmental protection and release response are central to UST decommissioning. Candidates should understand how petroleum contamination may be identified, why contaminated soil and water must be handled properly, and how suspected or confirmed releases may trigger reporting and corrective action requirements. The federal UST regulations and project-specific requirements should be studied for release response concepts.

Documentation should be treated as a core exam topic. A properly completed decommissioning project may involve records of permits, notifications, tank cleaning, atmospheric testing, waste disposal, contaminated soil handling, sampling, tank disposal, closure in place, backfill, site restoration, and final reports. Good documentation helps demonstrate that the work was completed properly and supports future regulatory or property review.

Because this is a closed book examination, candidates should use active study methods. After reading each reference, candidates should write summaries in their own words, create flashcards for major terms, review process steps, and practice answering questions without looking at the books. Study sessions should focus on both facts and procedures. Candidates should be able to explain what must be done, why it must be done, and what hazard or compliance issue the step is intended to control.

How 1 Exam Prep Helps You Reach Your Goal

1 Exam Prep helps candidates prepare for the New Jersey UST Decommissioning exam with organized, safety-focused, and compliance-focused study support. UST decommissioning can be challenging because candidates must understand tank systems, closure procedures, petroleum hazards, environmental requirements, excavation concerns, federal regulations, and field documentation.

This exam book package gives candidates a focused reference foundation. Instead of preparing from scattered materials, candidates can work directly with the recommended practices, federal regulatory material, and safety guidance connected to UST decommissioning. That makes preparation more structured and easier to manage.

1 Exam Prep encourages candidates to study in a practical way. Since the exam is closed book, preparation should include careful reading, repeated review, process memorization, and scenario-based practice. Candidates should be able to describe the major steps in tank closure, recognize common hazards, and understand how safe work practices and regulatory requirements work together.

For candidates already working around UST systems, this package helps connect field experience to written procedures and regulatory requirements. Many workers understand tank sites in practice but need a stronger study structure for exam preparation. For newer candidates, the package provides a starting point for learning UST system components, decommissioning procedures, safety concerns, and compliance responsibilities.

The goal is to help candidates approach preparation with stronger organization, better subject familiarity, and more confidence in UST decommissioning concepts. 1 Exam Prep does not guarantee exam results, regulatory approval, contractor licensing, site closure approval, or project compliance outcomes, but it supports candidates with focused materials and a realistic study structure.

FAQ: What books are included in this package?

This package includes RP100 UST Installation: Recommended Practices for Installation of Underground Liquid Storage Systems, 2017, PEI/RP 1700-18 Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems, 2018, EPA 40 C.F.R. Part 280.10-280.74 and Subpart J, July 2015, and Health and Safety Training for Underground Storage Tank Inspectors Instructor's and Student Guide, June 1992.

FAQ: Is the ICC U2 UST Decommissioning exam open book or closed book?

The ICC U2 UST Decommissioning exam is a closed book examination. Candidates should study the references before exam day and prepare to answer questions without using the books during the test.

FAQ: What topics should I study for the UST Decommissioning exam?

Important topics include UST system components, closure planning, tank cleaning, product removal, sludge handling, vapor control, atmospheric testing, excavation safety, tank removal, closure in place, contaminated soil handling, release response, waste disposal, documentation, and federal UST requirements.

FAQ: Why is PEI/RP 1700-18 included?

PEI/RP 1700-18 addresses recommended practices for closing underground storage tank and shop-fabricated aboveground storage tank systems. It is a central reference for studying tank closure procedures, safety practices, removal, closure in place, and documentation.

FAQ: Why is RP100 included in a decommissioning package?

RP100 supports study of underground liquid storage system installation practices and system components. Understanding how UST systems are installed helps candidates recognize the tanks, piping, containment, backfill, corrosion protection, venting, and site conditions encountered during decommissioning work.

FAQ: Why is EPA 40 C.F.R. Part 280 included?

EPA 40 C.F.R. Part 280 includes federal technical standards and corrective action requirements for regulated UST systems. It supports study of compliance responsibilities, release reporting, corrective action, closure-related requirements, and operator training provisions.

FAQ: How should I study for a closed book UST exam?

Study by topic, summarize each reference, memorize major procedure sequences, and practice answering questions without looking at the books. Focus on understanding the reasons behind each safety step and compliance requirement.

FAQ: Does passing the ICC U2 exam automatically authorize me to perform UST decommissioning work in New Jersey?

No. Passing an exam can support qualification, but UST decommissioning work in New Jersey must still comply with applicable state, local, environmental, safety, permit, documentation, and project-specific requirements.