Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam Book Package

Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam Book Package

Regular price $1,745.00
Sale price $1,745.00 Regular price $1,845.00
Sale Sold out
Shipping calculated at checkout.

CALL TO ASK ABOUT FINANCIAL ASSISTANCE

  • image-right
Customer Reviews
View full details

Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam Book Package

The Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam Book Package is designed for contractors, qualifying parties, underground utility professionals, excavation contractors, pipe laying crews, sewer and storm drain installers, water and gas line contractors, septic system installers, welding professionals, and business owners preparing for the Arizona A-12 Sewers, Drains and Pipe Laying contractor trade exam. This package brings together the key references used to study commercial sewer systems, storm drains, water piping, gas piping, general piping, septic systems, excavation, backfilling, welding, pipe installation, underground utility awareness, and OSHA construction safety.

The A-12 classification is a commercial sewers, drains, and pipe laying contractor classification in Arizona. This classification applies to the installation and repair of projects involving sewer access holes, storm drain pipe, water lines, gas lines, irrigation lines, and sewers. It also includes connecting sewer collector lines to building drains, installing septic tanks, leaching lines, dry wells, necessary connections, and related excavation and backfilling.

Commercial pipe laying work requires technical knowledge, field judgment, safe excavation practices, and accurate use of reference materials. Contractors working in this trade must understand trenching, bedding, pipe materials, utility layout, slope, grade, backfill, compaction, welding, ductile iron pipe installation, concrete pipe installation, septic systems, plumbing code requirements, gas piping requirements, and jobsite safety. The Arizona A-12 exam reflects this broad trade responsibility by testing both technical knowledge and reference-based problem solving.

This book package supports preparation for the major exam areas, including water piping, gas piping, sewers and storm drain systems, general piping, septic systems, excavation and backfilling, safety, and welding. The references include approved exam-room books for code and standard lookup, along with study-only references that help candidates build the practical field knowledge needed for underground utility and pipe laying work.

The Arizona A-12 exam is an open-book test with specific rules about which references may be brought into the examination center. Candidates are responsible for bringing their own approved references. The remaining books in this package are important study materials that help build excavation, pipe installation, welding, ductile iron, concrete pipe, and Blue Stake knowledge before exam day, even though they are not allowed in the testing room.

Exam Details

The Arizona A-12 Sewers, Drains and Pipe Laying Commercial Contractor trade exam contains 80 questions. Candidates must earn a minimum passing score of 70%, and the time allowed for the exam is 210 minutes.

The exam content outline includes the following subject areas:

  • Water Piping
  • Gas Piping
  • Sewers and Storm Drain Systems
  • General Piping
  • Septic Systems
  • Excavation and Backfilling
  • Safety
  • Welding

Water piping questions may involve ductile iron water main installation, pipe materials, appurtenances, fittings, valves, joints, thrust restraint, bedding, trench preparation, pressure considerations, testing awareness, and installation practices. Candidates should understand the relationship between pipe materials, installation conditions, jointing methods, backfill, and system performance.

Gas piping questions may involve gas transmission and distribution system concepts, pipe materials, joining, welding, protection, pressure, trench conditions, safety, and applicable standards. Gas piping work requires attention to safety and proper installation practices because underground gas systems present serious hazards when installed or repaired incorrectly.

Sewers and storm drain systems are a major portion of the exam. Questions may involve sewer access holes, storm drain pipe, sewer collector lines, drainage pipe, concrete pipe, box culvert installation, grade, slope, bedding, backfilling, alignment, connections, pipe support, and inspection readiness. Contractors should understand how underground drainage and sewer systems are installed to maintain flow, structural support, and long-term serviceability.

Excavation and backfilling questions may involve trench layout, trench protection, soil conditions, bedding, pipe zone backfill, compaction, equipment, dewatering awareness, utility locating, access, spoil placement, and field sequencing. Since pipe laying depends heavily on trench preparation and backfill quality, this topic should receive significant study time.

Safety questions may involve OSHA construction standards, excavation and trenching hazards, protective systems, personal protective equipment, ladders, equipment, material handling, hazard communication, underground utilities, and safe jobsite practices. Welding questions may involve pipe welding procedures, welding terminology, preparation, joints, safety, and trade practices used in pipe installation.

Open Book Test

The Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam is an open-book test. Candidates are responsible for bringing their own approved references to the examination center. The testing center does not provide the reference materials.

The approved exam-room references include:

  • Code of Federal Regulations - 29 CFR Part 1926 (OSHA), with latest available amendments, or Code of Federal Regulations - 29 CFR Part 1926 Selections by PSI
  • International Plumbing Code, 2018
  • NFPA 30, Flammable and Combustible Liquids Code, 2015
  • AWWA C600-99, Installation of Ductile Iron Water Mains and Their Appurtenances
  • ASME B31.8 - Gas Transmission and Distribution Systems, 2007
  • On-site Wastewater Treatment Facility Provisions in Unified Water Quality Permit Rule, Arizona Administrative Code Title 18, Chapter 9, 2006

The following references are listed for study but are not allowed in the examination center:

  • Excavation and Grading Handbook, Nick Capachi, 2006
  • Installation Guide for Ductile Iron Pipe
  • Modern Welding, 2020, 12th Edition
  • Pipefitter's Handbook
  • Concrete Pipe and Box Culvert Installation, 2019
  • Pipe Welding Procedures, 2003
  • IPT’s Pipe Trades Handbook, Robert A. Lee, 2016
  • Pipe and Excavation Contracting
  • Arizona 811 - Arizona Blue Stake Brochure

Candidates may use a silent, nonprinting, non-programmable calculator during the exam. Approved references may be highlighted, underlined, annotated, and indexed before the examination session. Candidates may not write, highlight, underline, or index references during the exam.

Additional papers are not allowed with approved references. This includes loose papers and attached papers. References may be tabbed or indexed with permanent tabs only. Permanent tabs are tabs that would tear the page if removed. Temporary tabs, including removable sticky notes or Post-It style tabs, are not allowed and must be removed before the exam begins.

Downloaded reference materials may be brought into the testing center only when properly bound. Spiral binding or hole-punching and placing the material in a binder are acceptable binding methods. Candidates should prepare all approved exam-room references before test day so the books meet testing-center rules.

Because the A-12 exam includes several approved references, preparation should include both trade study and reference navigation. Candidates should know how to locate information quickly in OSHA, the International Plumbing Code, NFPA 30, AWWA C600, ASME B31.8, and the Arizona onsite wastewater provisions. The study-only books should be used to build the field knowledge needed for excavation, ductile iron pipe, concrete pipe, welding, pipe fitting, Blue Stake procedures, and practical underground utility work.

Licensing Steps

Arizona contractor licensing is handled by the Arizona Registrar of Contractors. A candidate pursuing the A-12 Sewers, Drains and Pipe Laying Commercial Contractor classification should review the current state licensing requirements and application instructions before applying.

The qualifying party for the license must complete the applicable examination requirements for the classification. Arizona contractor applicants may also need to complete the Arizona Statutes and Rules Exam, which covers state-specific contractor laws, rules, and regulatory responsibilities.

After the required examination process is completed, the applicant submits the contractor license application and supporting documents to the Arizona Registrar of Contractors. The application process may include business entity information, qualifying party information, experience documentation, bonding, financial responsibility, background-related forms, and other state-required documents.

Applicants should apply for the classification that matches the work they intend to perform. The A-12 classification is a commercial classification. Contractors who plan to perform residential or dual residential/commercial sewer, drain, and pipe laying work should review the available Arizona classifications and choose the correct licensing path.

Passing the trade exam does not automatically issue a contractor license. The exam supports the trade competency portion of the process, but the license is issued only after the Arizona Registrar of Contractors approves the complete application for the applicable classification.

State Requirements

Arizona uses contractor license classifications to define the type of work a contractor may legally contract for and perform. The A-12 Sewers, Drains and Pipe Laying classification allows the licensee to install and repair any project involving sewer access holes, the laying of pipe for storm drains, water and gas lines, irrigation, and sewers.

The classification also includes connecting sewer collector lines to building drains and installing septic tanks, leaching lines, dry wells, all necessary connections, liners, and related excavating and backfilling. This makes the A-12 classification relevant for commercial underground utility contractors, pipe laying contractors, sewer and storm drain contractors, septic installation contractors, and site utility contractors working within the classification scope.

Contractors should stay within the scope of the license issued to them. Sewers, drains, and pipe laying work can overlap with plumbing, gas piping, excavation, grading, paving, concrete, welding, septic systems, utility locating, and general engineering activities. Contractors should understand the limits of the A-12 classification before bidding or performing work and should use properly licensed subcontractors when work falls outside the classification scope.

Commercial pipe laying projects may involve coordination with general contractors, property owners, municipalities, inspectors, engineers, utility owners, suppliers, traffic control crews, testing agencies, and other site contractors. Projects may also require utility location, trench safety planning, excavation permits, traffic control, bedding and backfill inspection, compaction control, pressure or leakage testing, welding quality control, and careful documentation.

The exam book package supports study for the trade exam, while the state licensing process is handled separately through the Arizona Registrar of Contractors. Applicants should follow the state process for application timing, examination requirements, bonding, entity documentation, and final license approval.

Reference Books

This Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam Book Package includes the following references:

  • Code of Federal Regulations - 29 CFR Part 1926 (OSHA)
    This OSHA construction safety reference covers federal construction industry safety standards. It supports preparation for safety-related questions involving excavation, trenching, protective systems, personal protective equipment, ladders, tools, equipment, material handling, hazard communication, and safe jobsite practices. This is one of the approved references allowed in the examination center.
  • International Plumbing Code, 2018
    This plumbing code reference supports preparation for drainage systems, building drains, sewer connections, piping materials, cleanouts, fixtures, joints, fittings, venting, storm drainage, sanitary drainage, and plumbing provisions related to sewer and drain work. This is one of the approved references allowed in the examination center.
  • NFPA 30, Flammable and Combustible Liquids Code, 2015
    This fire safety code supports preparation for flammable and combustible liquid storage, handling, piping-related hazards, fuel safety, and safety requirements that may affect underground utility or construction work. This is one of the approved references allowed in the examination center.
  • AWWA C600-99
    This American Water Works Association standard supports preparation for installation of ductile iron water mains and appurtenances, including trench preparation, pipe handling, jointing, fittings, valves, bedding, backfill, thrust restraint, and installation practices. This is one of the approved references allowed in the examination center.
  • ASME B31.8 - Gas Transmission and Distribution Systems, 2007
    This gas piping standard supports preparation for gas transmission and distribution system requirements, pipe materials, joining, testing awareness, corrosion protection, operating considerations, and safety concepts related to gas piping work. This is one of the approved references allowed in the examination center.
  • On-site Wastewater Treatment Facility Provisions in Unified Water Quality Permit Rule, Arizona Administrative Code Title 18, Chapter 9, 2006
    This Arizona onsite wastewater reference supports preparation for septic tanks, leaching lines, dry wells, onsite wastewater treatment facilities, system provisions, wastewater compliance topics, and installation requirements. This is one of the approved references allowed in the examination center.
  • Excavation and Grading Handbook, Nick Capachi, 2006
    This excavation reference supports study of site work, grading, trenching, excavation planning, soil movement, equipment use, backfill, compaction, slopes, and practical earthwork procedures. It is listed for study but is not allowed in the examination center.
  • Installation Guide for Ductile Iron Pipe
    This ductile iron pipe reference supports study of pipe handling, unloading, trench preparation, laying pipe, joint assembly, fittings, appurtenances, cutting, tapping awareness, restraint, bedding, and backfilling. It is listed for study but is not allowed in the examination center.
  • Modern Welding, 2020, 12th Edition
    This welding reference supports study of welding processes, joint preparation, weld quality, tools, symbols, safety, cutting, metal work, and shop or field welding practices used in pipe and utility work. It is listed for study but is not allowed in the examination center.
  • Pipefitter's Handbook
    This pipe trades reference supports study of pipe dimensions, fittings, threading, flanges, valves, calculations, offsets, layout, pipe data, and practical field information used by pipefitters and utility installers. It is listed for study but is not allowed in the examination center.
  • Concrete Pipe and Box Culvert Installation, 2019
    This concrete pipe reference supports study of concrete pipe and box culvert handling, bedding, installation, joining, alignment, grade, backfilling, compaction, inspection, and field practices for drainage and stormwater systems. It is listed for study but is not allowed in the examination center.
  • Pipe Welding Procedures, 2003
    This welding procedure reference supports study of pipe welding methods, weld preparation, passes, positions, inspection awareness, safety, and practical procedures used in pipe work. It is listed for study but is not allowed in the examination center.
  • IPT’s Pipe Trades Handbook, Robert A. Lee, 2016
    This pipe trades handbook supports study of pipe data, fittings, flanges, valves, measurements, formulas, tables, materials, threading, layout, and calculations used in piping work. It is listed for study but is not allowed in the examination center.
  • Pipe and Excavation Contracting
    This excavation and pipe installation reference supports study of trenching, pipe laying, bedding, backfill, compaction, underground construction, equipment, grading, safety, and practical field methods used in sewer, storm drain, water, gas, irrigation, and septic work. It is listed for study but is not allowed in the examination center.
  • Arizona 811 - Arizona Blue Stake Brochure
    This underground utility awareness reference supports study of Arizona Blue Stake procedures, utility notification, safe digging practices, damage prevention, excavation planning, and jobsite awareness before digging. It is listed for study but is not allowed in the examination center.

Test Information and Study Materials

Preparation for the Arizona A-12 exam should begin with the exam content outline. The exam covers water piping, gas piping, sewers and storm drain systems, general piping, septic systems, excavation and backfilling, safety, and welding. This is a broad commercial underground utility exam, so candidates should create a study plan that balances code lookup, pipe installation knowledge, excavation methods, and safety.

For water piping, candidates should study ductile iron pipe installation, water main appurtenances, fittings, valves, thrust restraint, pipe handling, trench preparation, bedding, jointing, alignment, backfill, and testing awareness. AWWA C600 and the ductile iron installation guide are especially useful for this part of preparation.

For gas piping, candidates should study gas distribution concepts, materials, joining, protection, trenching, pressure-related safety, welding awareness, and applicable gas piping standards. ASME B31.8 should be organized carefully because it is one of the approved exam-room references.

For sewers and storm drain systems, candidates should study sanitary sewer pipe, storm drain pipe, sewer access holes, collector lines, building drain connections, concrete pipe, box culverts, slope, grade, bedding, backfill, joints, inspection, and installation sequencing. Pipe laying questions often combine trade knowledge with careful reading of standards and installation guidance.

For septic systems, candidates should review the Arizona onsite wastewater provisions, septic tanks, leaching lines, dry wells, disposal areas, connections, excavation, backfill, and system installation requirements. The A-12 scope includes septic tanks, leaching lines, dry wells, and necessary connections, so candidates should not skip this topic.

For excavation and backfilling, candidates should study trench preparation, excavation planning, soil conditions, protective systems, bedding, pipe zone backfill, compaction, equipment use, dewatering awareness, spoil placement, access, and utility protection. Excavation and backfilling is one of the largest exam areas and should receive extra preparation time.

For welding, candidates should study Modern Welding and Pipe Welding Procedures to understand welding terminology, joint preparation, welding processes, pipe welding procedures, safety, equipment, and weld quality. Welding questions may also connect to gas piping, steel pipe, fabrication, and field repair work.

For Arizona 811 and Blue Stake awareness, candidates should understand the importance of locating underground utilities before excavation begins. Commercial pipe laying work requires digging near existing utilities, so damage prevention and safe excavation planning are essential.

For OSHA safety, candidates should become familiar with OSHA 29 CFR Part 1926. Sewer, drain, and pipe laying work may involve open excavations, trench collapse hazards, confined-space awareness, underground utilities, heavy equipment, welding, lifting, pipe handling, ladders, traffic exposure, and hazardous materials. Candidates should practice locating OSHA topics quickly because safety questions may require reference lookup during the open-book exam.

Strong preparation includes organizing the approved references and using the study-only books to build field knowledge. Highlight important sections in OSHA, the International Plumbing Code, NFPA 30, AWWA C600, ASME B31.8, and the Arizona onsite wastewater provisions. Add permanent tabs and practice looking up information quickly. With 80 questions and 210 minutes, candidates should manage time carefully and avoid spending too long on any single question.

How 1 Exam Prep Helps You Reach Your Goal

1 Exam Prep helps Arizona contractor candidates prepare with organized study guidance, trade-focused review, reference navigation support, and confidence-building exam preparation structure. For the Arizona Sewers, Drains and Pipe Laying Commercial Contractor (A-12) Exam, preparation should include underground utility trade knowledge, pipe installation methods, excavation safety, welding awareness, and efficient use of the approved exam-room references.

This exam covers a wide range of commercial pipe laying subjects, including water piping, gas piping, sewers, storm drains, general piping, septic systems, excavation, backfilling, safety, and welding. 1 Exam Prep helps students organize preparation around the actual exam categories instead of studying randomly.

For open-book exams, reference navigation is one of the most important skills to develop. Candidates should know how to move through OSHA, the International Plumbing Code, NFPA 30, AWWA C600, ASME B31.8, and the Arizona onsite wastewater provisions quickly. The study-only books in the package help build the field knowledge needed for excavation, ductile iron pipe, concrete pipe, pipe fitting, welding, Blue Stake, and practical underground utility work.

1 Exam Prep supports students by encouraging practical preparation habits. That includes reviewing the exam outline, reading the references, organizing approved books, practicing timed lookups, and strengthening weak areas before test day. The goal is to help candidates understand the materials and approach the Arizona contractor exam process with a clearer plan.

1 Exam Prep does not guarantee passing, licensing approval, state approval, or exam outcomes. The value of preparation comes from consistent study, correct reference materials, and a focused approach to learning the sewer, drain, and pipe laying trade content tested on the exam.

FAQ Section

What is included in the Arizona A-12 Sewers, Drains and Pipe Laying Exam Book Package?

This package includes OSHA 29 CFR Part 1926, International Plumbing Code 2018, NFPA 30 2015, AWWA C600-99, ASME B31.8 2007, Arizona onsite wastewater provisions, Excavation and Grading Handbook, Installation Guide for Ductile Iron Pipe, Modern Welding, Pipefitter's Handbook, Concrete Pipe and Box Culvert Installation, Pipe Welding Procedures, IPT’s Pipe Trades Handbook, Pipe and Excavation Contracting, and Arizona 811 - Arizona Blue Stake Brochure.

Is the Arizona A-12 Sewers, Drains and Pipe Laying exam open book?

Yes. The Arizona A-12 Sewers, Drains and Pipe Laying Commercial Contractor exam is an open-book test, but only approved references may be brought into the examination center.

Which books are allowed in the A-12 exam room?

The approved exam-room references are OSHA 29 CFR Part 1926, International Plumbing Code 2018, NFPA 30 2015, AWWA C600-99, ASME B31.8 2007, and On-site Wastewater Treatment Facility Provisions in Unified Water Quality Permit Rule, Arizona Administrative Code Title 18, Chapter 9, 2006.

Are all books in this package allowed into the testing center?

No. The excavation, ductile iron installation, welding, pipe trades, concrete pipe, pipe welding, pipe and excavation, and Arizona 811 references are study-only materials and are not allowed in the examination center.

How many questions are on the Arizona A-12 exam?

The Arizona A-12 Sewers, Drains and Pipe Laying exam contains 80 questions. The minimum passing score is 70%, and candidates are allowed 210 minutes.

What topics are covered on the Arizona A-12 exam?

The exam covers water piping, gas piping, sewers and storm drain systems, general piping, septic systems, excavation and backfilling, safety, and welding.

Can I highlight and tab my approved books before the exam?

Yes. Approved references may be highlighted, underlined, annotated, and indexed before the examination. Permanent tabs are allowed. Temporary tabs, loose papers, attached papers, and writing in the books during the exam are not allowed.

Can I use a calculator during the exam?

Yes. Candidates may use a silent, nonprinting, non-programmable calculator during the Arizona A-12 exam.

What work is covered by the Arizona A-12 Sewers, Drains and Pipe Laying classification?

The A-12 classification allows installation and repair of projects involving sewer access holes, storm drains, water and gas lines, irrigation, and sewers. It also includes connecting sewer collector lines to building drains, installing septic tanks, leaching lines, dry wells, necessary connections, liners, and related excavation and backfilling.

How should I study for the Arizona A-12 exam?

Start with the exam content outline, then study each topic using the appropriate reference. Organize the approved books for fast lookup, and use the study-only references to build practical knowledge in excavation, pipe laying, welding, ductile iron pipe, concrete pipe, pipe fitting, Blue Stake procedures, and underground utility installation.