Washington 04 Signs Electrician: Requirements, Scope, Exam, and Study Guide

Washington's 04 Signs Electrician certificate is a specialty credential for electricians who install, connect, modify, maintain, and repair qualifying electric signs, outline lighting, electrical sign supplies, controls, related telecommunications, circuit extensions, and limited remote-sign services.

It is a focused specialty, but do not mistake focused for tiny. Sign electricians deal with outdoor wiring, grounding and bonding, disconnects, raceways, overcurrent protection, services, electrical equipment, sign-specific code rules, and plenty of weather that did not read the installation manual.

The current certification path requires 4,000 qualifying hours of electrical work experience. Because Signs 04 is a 4,000-hour specialty, trainees also need 48 hours of approved basic classroom instruction and must receive the required supervision while gaining their hours.

Start with the Washington Signs Electrician collection from 1 Exam Prep. This guide explains the current 04 scope, work-experience requirements, supervision, the 47-question examination, open-book rules, fees, renewal requirements, and a practical study strategy.

What Is the Washington 04 Signs Specialty?

Washington defines the 04 electrical specialty around electric signs and outline lighting.

The scope includes placement and electrical connection of signs and outline lighting together with their electrical supply, related telecommunications, controls, and associated circuit extensions.

The specialty also has limited authority to install an electrical service that supplies a remote sign.

Think complete sign system. The 04 specialty can involve the sign, outline lighting, controls, electrical supply, related communications, circuit extensions, and a qualifying service dedicated to a remote sign.

The Remote-Sign Service Has Specific Limits

The 04 Signs specialty may install a service supplying a remote sign, but Washington places clear limits on that service.

60 Amps Max

Service Current

The service cannot exceed 60 amperes.

120/240 Volts

Service Voltage

The qualifying remote-sign service is limited to 120/240 volts.

Single Phase

Service Phase

The remote-sign service must be single phase.

Remote Sign Only

Service Purpose

The service authority applies when the service supplies power to a remote sign only.

Memorize this for exam day: 60 amperes maximum, 120/240 volts, single phase, remote sign only.

What Kind of Sign Work Is Included?

The specialty can cover many common electric-sign installations when the work remains inside the legal 04 scope.

  • Electric cabinet signs.
  • Illuminated channel letters.
  • Wall-mounted electric signs.
  • Freestanding electric signs.
  • Remote signs.
  • Outline lighting.
  • Electrical sign supplies.
  • Sign controls.
  • Related telecommunications.
  • Associated circuit extensions.
  • Qualifying sign disconnects.
  • Electrical components forming part of listed signs.

The equipment may be different from a normal building branch circuit, but the electrician still has to apply the NEC correctly. A glowing logo does not receive diplomatic immunity from electrical code.

Electrical Certification Is Required for Electrical Sign Work

Washington specifically identifies sign tasks that require electrical licensing or certification.

Certification is required to install, modify, or maintain:

  • An electric sign.
  • A sign-supporting pole.
  • A sign face.
  • A sign ballast.
  • A lamp socket.
  • A lamp holder.
  • A disconnect switch.
  • Another electrical part of a listed electric sign.

This matters because sign projects often combine structural, mechanical, and electrical work. Knowing which part requires an electrician is part of understanding the specialty.

Some Sign Tasks Do Not Require Electrical Certification

Not every task performed by a sign company is electrical work.

Washington identifies several activities that do not require electrical licensing or certification.

  • Cleaning nonelectrical parts of an electric sign.
  • Forming or pouring a concrete pole base used to support a sign.
  • Operating machinery used to assist an electrician while mounting an electric sign or sign-supporting pole.
  • Assembling structural portions of a billboard.
The dividing line is the electrical work. Building a concrete base is different from installing the electrical components of the sign mounted on it.

Existing Exterior Luminaire Work

The 04 Signs specialty may also perform qualifying service, maintenance, repair, and retrofit-kit work inside housings of existing exterior luminaires mounted on poles or other structures.

The work must use qualifying like-in-kind components or approved retrofit-kit components as allowed by Washington's rules.

This does not mean a Signs electrician has unlimited authority to construct an entirely new site-lighting system. The permission is tied to the specific specialty scope and conditions.

LED Sign Retrofits

Washington provides rules for retrofitting listed signs and listed outline lighting to LED light sources.

A properly licensed 04 sign contractor using properly certified electricians or properly supervised trainees may perform qualifying in-place LED retrofits when the retrofit components and kit are listed and the applicable installation instructions are available for inspection.

Physical access to the retrofit components must also be available for the electrical inspector.

This is worth studying because modern sign work often involves LED conversions instead of simply replacing older lamps and ballasts forever.

NEC Article 600 Is Important

NEC Article 600 is the major code article for electric signs and outline lighting.

A Signs Electrician candidate should be familiar with how the article is organized and how it interacts with the rest of the NEC.

Review topics such as:

  • Electric-sign installation requirements.
  • Outline lighting.
  • Disconnecting means.
  • Sign electrical supplies.
  • Field wiring.
  • Grounding and bonding.
  • Servicing access.
  • Listed sign equipment.
  • Retrofit equipment.
  • Sign-related electrical components.

Article 600 matters, but it is not the whole examination. Services, grounding, wiring methods, overcurrent protection, equipment, and electrical theory are also on the current outline.

Signs 04 Requires 4,000 Hours of Qualifying Experience

Washington classifies Signs 04 as a 4,000-hour specialty.

4,000 Hours

Exam Eligibility

The current specialty table requires 4,000 qualifying work hours before examination eligibility.

4,000 Hours

Certification

The same 4,000-hour minimum applies to full Signs electrician certification.

75% Minimum

Supervision

Trainees in the 04 specialty must receive the required supervision at least 75 percent of the time.

48 Hours

Basic Classroom Training

A 4,000-hour specialty requires 48 hours of approved electrical basic trainee classroom instruction.

Unlike certain 2,000-hour specialties, Signs 04 is not eligible for the modified zero-percent-supervision trainee pathway.

Supervision While You Are Training

A trainee earning experience toward the Signs certificate must work under an electrician who is properly certified for the work being performed.

For Washington's 4,000-hour specialties, trainees must be supervised at least 75 percent of the time.

The supervising electrician may be an appropriately certified specialty electrician, master specialty electrician, journey-level electrician, or master journey-level electrician as permitted by Washington's rules.

Do not mix the specialty training rules. The 04 Signs specialty is a 4,000-hour category. The early-test and zero-percent-supervision rules used by some 2,000-hour specialties do not apply to Signs 04.

48 Hours of Basic Classroom Instruction

Washington currently requires 48 hours of approved electrical basic trainee classroom instruction for a specialty requiring 4,000 hours of work experience.

Basic classroom topics can include:

  • Electrical theory.
  • National Electrical Code fundamentals.
  • Washington electrical laws and rules.
  • Electrical safety.
  • Grounding and bonding.
  • Wiring methods.
  • Overcurrent protection.
  • Trade calculations.

Keep your classroom record current. Four thousand completed field hours are far less exciting when your paperwork says, "Nice try, you still need school."

Keep Accurate Work-Experience Records

Labor & Industries reviews qualifying experience before approving a specialty electrician candidate for the examination.

Keep records showing:

  • Your employer.
  • Dates of employment.
  • Qualifying electrical hours.
  • The type of sign electrical work performed.
  • Your supervising electrician.
  • The certification classification under which you worked.

Washington may require documentation that verifies both the number of hours and the type of work performed.

Organize those records while you are working. Reconstructing 4,000 hours two years later is a terrible scavenger hunt.

The Current 04 Signs Electrician Exam at a Glance

30 Questions

NEC & Theory

The current technical section contains approximately 30 scored questions.

2 Hours

Technical Time

Candidates currently receive two hours for NEC & Theory.

17 Questions

Washington Codes

The Washington Laws & Rules section contains approximately 17 scored questions.

1 Hour

Washington Time

Candidates currently receive one hour for Washington Codes.

The current published Signs Electrician examination totals 47 scored questions across three section-hours. The current passing score is 70 percent.

Current Signs Electrician Exam Blueprint

Knowledge Area Approx. Electrician Questions
NEC 90 - Introduction1
NEC 100-110 - General Requirements1
NEC 200-225, 280-285 - Wiring & Protection1
NEC 230 - Services3
NEC 240 - Overcurrent Protection3
NEC 250 - Grounding & Bonding4
NEC 300-398 - Wiring Methods5
NEC 400-427, 455-480 - Electrical Equipment2
NEC 430-450 - Motors, HVAC, Generators & Transformers2
NEC 600-695 - Special Equipment4
General Trade Knowledge & Theory4
NEC & Theory Total30
Washington Laws & Rules17
Total Published Scored Questions47

The number of questions in an individual category is approximate. Still, the blueprint gives you a very useful map for deciding where to spend your study time.

Wiring Methods Are the Largest NEC Category

NEC 300 through 398 contributes approximately five questions to the current Signs Electrician technical section.

Review:

  • Conductors and cables.
  • Raceways.
  • Boxes and fittings.
  • Wet and damp locations.
  • Outdoor installations.
  • Underground wiring.
  • Protection from physical damage.
  • Support and securing requirements.
  • Connections entering signs and sign structures.

Electric signs live outdoors, on buildings, on poles, and in weather. Correct wiring methods are not optional decoration.

Grounding and Bonding Are About Four Questions

NEC Article 250 contributes approximately four questions.

Study grounding and bonding for sign cabinets, metal supporting structures, electrical enclosures, raceways, service equipment, and other conductive components.

Review:

  • Equipment grounding conductors.
  • Bonding.
  • Effective fault-current paths.
  • Service bonding.
  • Grounding electrodes where applicable.
  • Grounding electrode conductors.
  • Metal raceway bonding.

Picture the actual sign and ask where fault current needs to travel if an energized conductor contacts metal. That is usually more useful than memorizing grounding vocabulary without context.

Special Equipment Is About Four Questions

NEC 600 through 695 contributes approximately four questions.

Article 600 is one of the most important areas for the Signs electrician because it deals directly with electric signs and outline lighting.

Study:

  • Electric-sign requirements.
  • Outline lighting.
  • Disconnecting means.
  • Supply requirements.
  • Grounding and bonding.
  • Field wiring.
  • Listed equipment.
  • Servicing access.
  • Retrofit work.

The specialty name is Signs. If Article 600 is still a mystery the night before the test, the study plan has taken an unexpected scenic route.

General Trade Knowledge and Theory Is About Four Questions

The current blueprint gives approximately four questions to General Trade Knowledge and Theory.

  • Voltage.
  • Current.
  • Resistance.
  • Power.
  • Ohm's law.
  • Series and parallel circuits.
  • Basic AC theory.
  • Electrical measurements.
  • Troubleshooting concepts.
  • Trade math.

Knowing common calculations without opening a reference saves time for the code questions that really need a lookup.

Services Are About Three Questions

NEC Article 230 contributes approximately three questions.

This is especially important because 04 has limited authority to install a service supplying a remote sign.

Review:

  • Service conductors.
  • Service equipment.
  • Service disconnecting means.
  • Service ratings.
  • Permitted locations.
  • Grounding and bonding.
Always combine the NEC rule with the specialty limit. Even if Article 230 explains how a service can be constructed, a Signs electrician's specialty service must still stay within Washington's 60-amp, 120/240-volt, single-phase remote-sign limitation.

Overcurrent Protection Is About Three Questions

NEC Article 240 contributes approximately three questions.

Review:

  • Conductor overcurrent protection.
  • Standard overcurrent device ratings.
  • Branch-circuit protection.
  • Equipment protection.
  • Conductor ampacity.
  • Protection associated with sign supplies and services.

Pay attention to what the question is actually asking you to size. Breaker rating, conductor ampacity, and equipment rating can appear together without meaning the same thing.

Electrical Equipment Is About Two Questions

NEC 400-427 and 455-480 contributes approximately two questions.

Review the electrical equipment categories listed in the current blueprint and pay attention to flexible cords, equipment connections, transformers, and other components that can appear in sign systems.

Some electric signs contain power supplies, transformers, lighting equipment, and other components that pull questions into code articles beyond Article 600.

Motors, Generators, and Transformers Are About Two Questions

NEC 430 through 450 contributes approximately two questions.

Signs can contain transformers, motors, rotating or moving displays, control equipment, and other devices covered by these articles.

You do not need to treat this section like the main event, but skipping it completely is an excellent way to make two questions harder than necessary.

The Washington Codes Section Has 17 Questions

The Washington Laws & Rules section contains approximately 17 questions and allows one hour.

Study:

  • Chapter 19.28 RCW.
  • Chapter 296-46B WAC.
  • WAC 296-46B-920 Signs specialty scope.
  • WAC 296-46B-945 experience requirements.
  • Electrician certification.
  • Trainee supervision.
  • Electrical contractors.
  • Permits.
  • Inspections.
  • Renewal.
  • Continuing education.
  • Sign retrofit requirements.

Seventeen questions is a large part of a 47-question exam. Washington law deserves its own study sessions instead of becoming the thing you read while driving to the testing center. Please do not do that.

The Current Exam Is Open Book

The current Washington electrical examination is open book.

The current PSI bulletin bases law, rule, and code questions on:

  • 2020 National Electrical Code.
  • Current Chapter 19.28 RCW.
  • Current Chapter 296-46B WAC.

Original copyrighted reference materials may contain highlighting, underlining, and permanent index tabs prepared before entering the exam area.

Post-It notes, repositionable tabs, sticky notes, and other removable notes are not permitted.

References may not be written in during the examination.

Printed Washington RCW and WAC material may be used when prepared according to the current PSI binder requirements. A silent, nonprinting, nonprogrammable calculator is also permitted.

Open book does not mean unlimited time. You have 30 technical questions in two hours. Knowing where the rules live matters almost as much as owning the books.

Exam NEC vs. Washington Field NEC

The current PSI licensing bulletin still identifies the 2020 NEC as the examination reference.

Washington field installations currently use the 2023 NEC.

The state has scheduled the 2026 NEC to replace the current 2023 edition on December 31, 2026.

That means the code edition used for the licensing examination and the edition enforced on current installations are not necessarily the same.

Always check the latest candidate bulletin shortly before your test. Exam references can change independently of field-code adoption.

A Practical Open-Book Exam Strategy

  1. Memorize the 04 scope. Know signs, outline lighting, supplies, controls, telecommunications, and circuit extensions.
  2. Memorize the service limit. 60 amps, 120/240 volts, single phase, remote sign only.
  3. Know what sign work requires electrical certification.
  4. Know which structural tasks do not require electrical certification.
  5. Study NEC 300-398 heavily. Wiring Methods is the largest category.
  6. Study Article 600 and Special Equipment.
  7. Practice NEC 250 Grounding & Bonding.
  8. Review Article 230 Services and Article 240 Overcurrent Protection.
  9. Practice basic theory without a reference book.
  10. Study Washington experience and supervision rules.
  11. Take 30-question technical practice sections in two hours.
  12. Take 17-question Washington Codes practice sections in one hour.

Apply Through Labor & Industries Before PSI

Signs Electrician candidates must first qualify through Washington Labor & Industries.

L&I reviews your qualifying experience and education before providing examination eligibility.

Once your application is approved, you receive the information needed to schedule the correct examination with PSI.

Make sure the state has accurate work-experience affidavits and classroom records before applying.

For help organizing licensing paperwork, review 1 Exam Prep application services.

Retesting Rules

If you fail the examination or a required section, current testing rules impose a waiting period before another attempt.

The normal waiting period is at least 14 days.

After a third failed attempt, the waiting period increases to approximately 90 days between future attempts until the examination is successfully completed.

Approved candidates also need to complete the required examination sections within the applicable eligibility period.

Use failed-attempt diagnostic information as a study tool instead of immediately retaking the same test with the same preparation plan.

Current Exam and Certification Fees

$65

Current PSI Exam

The Signs Electrician examination totals three section-hours.

$114.60

Specialty Application

Current Washington specialty electrician application including original certificate and application processing fee.

$92.60

Online Renewal

Current online journey-level or specialty electrician certificate renewal fee.

$106.40

Other Renewal

Current specialty electrician renewal by mail, fax, or in person.

Fees can change, so verify the amounts in effect when you apply, test, or renew.

For core electrical references, review the Washington General Electrician Book Package.

For books, exam costs, and licensing expenses, review 1 Exam Prep financing options.

Renewal and Continuing Education

Washington specialty electrician certificates normally renew on a three-year cycle and expire on the certificate holder's birthdate according to the state's certification rules.

A normal three-year certification period requires 24 hours of approved continuing education.

  • At least 8 hours must cover changes in the currently adopted electrical code.
  • At least 4 hours must cover current Chapter 19.28 RCW and/or related WAC requirements.
  • The remaining 12 hours may cover other approved industry-related electrical subjects.

Do not leave continuing education until the certificate is already expiring. The code has enough deadlines without adding your own dramatic finale.

A Practical Washington Signs Electrician Study Plan

  1. Start with WAC 296-46B-920. Learn the exact Signs specialty scope.
  2. Memorize 60 amps, 120/240 volts, single phase.
  3. Learn which sign tasks require electrical certification.
  4. Learn which structural tasks do not require electrical certification.
  5. Study Article 600 thoroughly.
  6. Study NEC 300-398 Wiring Methods.
  7. Study NEC 250 Grounding & Bonding.
  8. Study NEC 240 Overcurrent Protection.
  9. Review Article 230 Services.
  10. Practice electrical theory and trade math.
  11. Study WAC 296-46B-945 work-experience rules.
  12. Practice RCW and WAC navigation.
  13. Take timed technical practice exams.
  14. Take timed Washington-law practice exams.

Use the Washington Signs Electrician collection from 1 Exam Prep to organize your preparation around the current 04 examination.

Study Like a Signs Electrician

A useful way to prepare is to imagine an actual sign project and follow the electrical installation from beginning to end.

Start with the scope. Is the project an electric sign, outline lighting installation, control system, related telecommunications system, or permitted circuit extension? If a separate remote-sign service is involved, does it remain within 60 amps, 120/240 volts, single phase, and supply only the remote sign?

Next look at the electrical supply. Is there a service? What disconnect is required? What overcurrent protection applies? What size conductors are needed? How is the equipment grounded and bonded?

Then examine the sign itself. What does Article 600 require? Is the equipment listed? Are raceways and conductors suitable for the location? Is servicing access provided? Are the electrical components properly connected?

Finally, check the job from the Washington licensing side. Is the person doing the electrical work properly certified? Is a trainee being supervised correctly? Is a task electrical or purely structural? Are permits and inspections being handled correctly?

That process turns exam preparation into the same kind of thinking you will use on a real sign installation.

Frequently Asked Questions

A Washington Signs Electrician is a specialty electrician certified to perform qualifying electrical work involving signs, outline lighting, sign supplies, controls, related telecommunications, circuit extensions, and permitted remote-sign services.

Washington currently requires 4,000 qualifying work-experience hours before examination eligibility for the 04 Signs specialty.

Full 04 Signs specialty electrician certification currently requires 4,000 qualifying work-experience hours.

Trainees working in the 04 Signs specialty must receive the required appropriate supervision at least 75 percent of the time.

A 4,000-hour specialty currently requires 48 hours of approved electrical basic trainee classroom instruction.

The Signs specialty may install a service of up to 60 amperes at 120/240 volts single phase when that service supplies power to a remote sign only.

Washington requires appropriate electrical licensing or certification to install, modify, or maintain a sign, sign-supporting pole, sign face, ballast, lamp socket, lamp holder, disconnect switch, or other electrical part of a listed electric sign.

Examples include cleaning nonelectrical sign parts, forming or pouring a concrete pole base, operating machinery to assist an electrician with mounting, and assembling structural parts of a billboard.

A properly licensed 04 sign contractor using properly certified individuals or properly supervised trainees may perform qualifying listed LED retrofit work when Washington's retrofit requirements are met.

The current published outline contains approximately 30 NEC and Theory questions plus 17 Washington Codes questions, for 47 scored questions.

The current examination allows two hours for NEC and Theory and one hour for Washington Codes.

Yes. The current PSI bulletin identifies Washington electrical examinations as open book, subject to the rules for reference materials, permanent tabs, markings, and calculators.

The current PSI bulletin identifies the 2020 National Electrical Code together with current RCW 19.28 and WAC 296-46B. Check the latest bulletin before testing because exam references can change.

The current passing score is 70 percent.

Start with the Washington Signs Electrician collection from 1 Exam Prep. You can also review the Washington General Electrician Book Package for core electrical references.

Conclusion

The Washington 04 Signs Electrician certificate is a specialty credential for electricians who work with electric signs, outline lighting, sign electrical supplies, controls, related telecommunications, circuit extensions, and limited remote-sign services. It gives an electrician a focused area of authority without turning the certificate into a general electrical license.

The scope is worth learning carefully because signs involve more electrical work than many people expect. A sign project may include outdoor raceways, conductors, grounding, bonding, overcurrent protection, disconnects, transformers, power supplies, controls, telecommunications, and even a dedicated service.

The remote-sign service is one of the easiest scope limits to memorize. Washington allows the Signs specialty to install a service supplying a remote sign when that service does not exceed 60 amperes, is 120/240 volts single phase, and supplies the remote sign only.

Washington also distinguishes structural sign work from electrical sign work. Cleaning nonelectrical parts, pouring a concrete pole base, operating machinery to assist an electrician, and assembling structural billboard components do not require electrical certification.

Installing or maintaining electrical portions is different. Washington requires electrical licensing or certification for installing, modifying, or maintaining an electric sign, sign-supporting pole, sign face, ballast, lamp socket, lamp holder, disconnect switch, or other electrical portion of a listed electric sign.

The specialty also includes certain service, maintenance, repair, and retrofit-kit work involving existing exterior luminaire housings. In-place LED sign and outline-lighting retrofits may also be performed under the proper 04 contractor and certification conditions when listed components and required installation information are available.

The path to certification currently requires 4,000 qualifying work-experience hours. Candidates must complete those qualifying hours before becoming eligible for the specialty examination and before obtaining full certification.

Because Signs is a 4,000-hour specialty, trainees must receive appropriate supervision at least 75 percent of the time. They also need 48 hours of approved basic classroom instruction.

The current examination contains approximately 30 NEC and Theory questions and 17 Washington Laws and Rules questions. Candidates receive two hours for the technical section and one hour for the Washington section. That produces 47 published scored questions across three section-hours.

Wiring Methods is the largest technical NEC category with approximately five questions. Grounding and Bonding contributes about four questions. Special Equipment contributes about four, and Article 600 is especially important. General Trade Knowledge and Theory contributes another four questions.

Services and Overcurrent Protection each contribute approximately three questions. Electrical Equipment and Motors, HVAC, Generators and Transformers contribute about two questions each. General Requirements and Wiring and Protection make up the remaining technical areas.

The Washington Codes section is a major part of the examination. Candidates should understand the Signs specialty scope, work-experience requirements, trainee supervision, electrician certification, electrical contractor requirements, permits, inspections, renewal, and continuing education.

The current examination is open book. PSI currently identifies the 2020 National Electrical Code, current Chapter 19.28 RCW, and current Chapter 296-46B WAC as the core code and law references.

The current passing score is 70 percent. Permanent tabs, highlighting, and underlining are currently allowed in original copyrighted references when prepared before entering the examination area. Removable notes and repositionable tabs are prohibited.

Washington field installations currently use the 2023 NEC, while the current licensing examination still references the 2020 NEC. Washington plans for the 2026 NEC to replace the 2023 field edition on December 31, 2026, so candidates should always confirm the current PSI bulletin near their examination date.

The licensing process begins with Labor & Industries. L&I reviews the candidate's qualifying hours and education before issuing exam eligibility. After approval, the candidate schedules the examination through PSI.

The current three-hour PSI examination fee is $65. Washington currently charges $114.60 for the specialty electrician application including the original certificate and processing fee.

Specialty electrician certificates normally renew on a three-year cycle. Current renewal is $92.60 online or $106.40 by mail, fax, or in person.

A normal three-year certification period requires 24 hours of approved continuing education. At least eight hours must cover electrical-code changes and at least four hours must cover Washington RCW or WAC requirements.

The best preparation connects all of these subjects to an actual sign installation. Start by checking whether the job is inside the 04 scope. Then follow the electrical system from the service or circuit through overcurrent protection, wiring methods, grounding, bonding, disconnecting equipment, controls, and the sign itself.

Finally, check the Washington licensing rules. Ask whether the person performing the work is properly certified, whether trainee supervision is correct, and whether permits and inspections are being handled properly.

When that process becomes familiar, the examination begins to look less like 47 unrelated questions and more like the electrical sign work you are training to perform.

Key Takeaways

  • Washington Signs 04 requires 4,000 qualifying work hours for exam eligibility and full certification, plus 48 hours of approved basic classroom instruction.
  • Trainees in this 4,000-hour specialty must receive appropriate supervision at least 75 percent of the time.
  • The 04 scope covers electric signs, outline lighting, supplies, controls, telecommunications, circuit extensions, and a remote-sign service limited to 60 amps at 120/240 volts single phase.
  • The current exam contains 30 NEC/Theory questions in two hours plus 17 Washington Codes questions in one hour, for 47 scored questions.
  • Focus on Wiring Methods, Article 600, grounding and bonding, services, overcurrent protection, electrical theory, specialty scope, and Washington licensing rules.

Plain-Language Summary

The Washington 04 Signs Electrician certificate is for electricians who perform qualifying electrical work on electric signs and outline lighting.

The specialty includes the placement and electrical connection of signs, sign electrical supplies, controls, related telecommunications, and associated circuit extensions.

It also allows a limited electrical service for a remote sign. That service cannot exceed 60 amps, must be 120/240 volts single phase, and must supply the remote sign only.

Sign projects can involve more than connecting a few wires. Electricians may work with raceways, conductors, disconnects, grounding and bonding, overcurrent protection, power supplies, transformers, controls, outdoor wiring, and listed sign equipment.

Washington requires electrical certification for installing, modifying, or maintaining electric signs and their electrical parts. This includes sign-supporting poles, sign faces, ballasts, lamp sockets, lamp holders, disconnect switches, and other electrical components of listed electric signs.

Some structural tasks do not require electrical certification. Examples include cleaning nonelectrical parts of a sign, pouring a concrete pole base, operating machinery to help a certified electrician mount a sign, and assembling structural portions of a billboard.

The Signs specialty can also perform certain maintenance and retrofit work inside existing exterior luminaire housings mounted on poles or structures. Qualifying LED sign retrofits may also be performed when the state's listing, installation, contractor, certification, and inspection requirements are followed.

Washington currently requires 4,000 qualifying work-experience hours before a candidate can become eligible for the Signs electrician examination. Full certification also requires 4,000 qualifying hours.

Trainees in Signs 04 must receive appropriate supervision at least 75 percent of the time. Because this is a 4,000-hour specialty, trainees also need 48 hours of approved basic electrical classroom instruction.

The current Signs Electrician examination has two sections. NEC and Theory contains approximately 30 questions and allows two hours. Washington Codes contains approximately 17 questions and allows one hour. That gives a published total of 47 scored questions.

Wiring Methods is the largest technical category with approximately five questions. Grounding and Bonding contributes about four. Special Equipment contributes about four, with Article 600 being especially important. General Trade Knowledge and Theory contributes another four.

Services and Overcurrent Protection contribute about three questions each. Electrical Equipment and Motors, HVAC, Generators and Transformers contribute about two questions each.

The Washington Codes section tests specialty scope, experience, supervision, electrician certification, contractor requirements, permits, inspections, renewal, continuing education, and other state rules.

The current exam is open book. PSI currently identifies the 2020 National Electrical Code, current RCW Chapter 19.28, and current WAC Chapter 296-46B as the main references.

The current passing score is 70 percent. Permanent tabs, highlighting, and underlining are allowed under the current exam rules, but removable notes and repositionable tabs are not.

Electrician candidates must first qualify through Washington Labor & Industries. L&I verifies qualifying work experience and education before the candidate schedules the examination through PSI.

The current three-hour examination costs $65 through PSI. Washington currently charges $114.60 for the specialty electrician application including the original certificate and processing fee.

Current renewal is $92.60 online or $106.40 by mail, fax, or in person. A normal three-year certification period requires 24 hours of approved continuing education, including eight hours of code update and four hours of Washington RCW/WAC education.

For exam preparation, begin with the legal scope. Memorize the 60-amp, 120/240-volt single-phase remote-sign service limit. Then study Article 600, Wiring Methods, grounding and bonding, services, overcurrent protection, electrical theory, and Washington law.

Use the Washington Signs Electrician collection from 1 Exam Prep to organize your preparation around the current 04 specialty and examination.