Current Minnesota Class A Master format: 80 questions, 5.5 hours, and 70% required to pass. Current licensing examinations use the 2026 NEC, and Master preparation adds advanced calculations, planning, layout, supervision, and contractor responsibility.

What Is the Minnesota Class A Master Electrician Exam?

The Minnesota Class A Master Electrician license is the advanced personal electrical credential administered by the Minnesota Department of Labor and Industry. Master electricians may perform and supervise electrical work within the statewide scope of the Class A license.

The Master exam requires strong NEC knowledge, calculations, theory, system planning, installation judgment, and familiarity with Minnesota electrical laws and rules.

Exam answer: 80 questions, 5.5 hours, and a 70% passing score.

Code answer: current Minnesota electrical licensing examinations use the 2026 National Electrical Code.

Contractor answer: a Minnesota electrical contractor must designate a responsible licensed individual who holds an active Master Electrician license.

The Class A Master credential is therefore both an advanced electrician license and the key personal license behind Minnesota electrical contractor responsibility.

Minnesota Master Electrician Exam Domains

DLI does not publish an official fixed percentage-by-domain blueprint, so the table follows the current Master-level knowledge areas without inventing weights.

Exam Area What to Study Study Focus
General NEC Requirements Definitions, listings, approvals, working space, identification, equipment ratings, and general rules Core foundation
Services and Feeders Services, feeders, disconnects, load calculations, demand factors, and conductor sizing Master calculation priority
Branch Circuits Branch circuits, loads, receptacles, GFCI/AFCI, and conductor requirements High priority
Grounding and Bonding Grounding electrodes, bonding, equipment grounding, separately derived systems, and sizing High priority
Overcurrent Protection Breakers, fuses, conductor protection, OCPD sizing, and tap rules High priority
Conductors and Wiring Methods Ampacity, adjustment, correction, raceways, cables, boxes, fill, support, and protection High priority
Motors and Transformers Motor circuits, controls, overloads, transformer sizing, protection, and separately derived systems Advanced calculation area
Special Occupancies and Equipment Hazardous locations, healthcare, pools, PV, energy storage, generators, emergency systems, and other special installations Broad NEC scope
Advanced Electrical Calculations Services, feeders, loads, voltage drop, conductors, motors, transformers, box fill, and raceway fill Highest priority
Planning, Layout and Supervision Planning electrical work, laying out systems, supervising installations, and code-compliance responsibility Master-level distinction
Minnesota Laws and Contractor Rules Licensing, supervision, permits, inspections, responsible licensed individual duties, and contractor requirements Required state review

Minnesota Master Electrician Exam Breakdown

Official LicenseClass A Master Electrician
Exam AbbreviationAM
Exam Questions80 questions
Exam Time5.5 hours | 330 minutes
Passing Score70%
Licensing AuthorityMinnesota Department of Labor and Industry
Current Exam Code2026 National Electrical Code
Exam ReferencesNEC, Laws and Rules Booklet, and calculator provided by DLI
Experience Requirement60 months of qualifying electrical experience
Master-Level ExperiencePlanning, layout, supervision, and installation experience required within the qualifying total

Minnesota Master Electrician and Contractor Licensing Path

The Class A Master Electrician license is directly connected to Minnesota electrical contractor responsibility.

Total experience: 60 months of qualifying electrical experience under the current DLI experience table.

Planning: minimum two months.

Layout: minimum two months.

Supervision: minimum two months.

Installation: minimum 12 months wiring for and installing electrical wiring, apparatus, and equipment.

Contractor role: an electrical contractor must designate an active Master Electrician as its responsible licensed individual.

What Should You Prioritize for the Minnesota Master Electrician Exam?

These bars show Master-level study priorities, not official DLI exam percentages.

Advanced Load, Service and Feeder CalculationsHighest priority

2026 NEC Navigation and Wiring MethodsHighest priority

Grounding, Bonding and Overcurrent ProtectionHigh priority

Planning, Layout and SupervisionMaster-level focus

Motors, Transformers and EquipmentHigh priority

Special Occupancies and Special SystemsCore topic

Minnesota Laws and Contractor ResponsibilitiesRequired review

Current Minnesota Master Electrician Exam References

DLI supplies the exam references, so personal tabbed books remain study tools rather than exam-room materials.

Reference Primary Use Exam-Day Rule
2026 National Electrical Code Core code questions, advanced calculations, services, grounding, motors, transformers, and special installations Softcover NEC provided by DLI
Minnesota Laws and Rules Booklet Licensing, supervision, contractor duties, permits, and inspections Provided by DLI
Electronic Calculator Service, feeder, motor, transformer, voltage-drop, conductor, and fill calculations Provided by DLI
Personal Study Materials Study, tabs, highlighting, calculations, and practice before test day Not permitted in the examination building

Your Minnesota Master Electrician Licensing Roadmap

Confirm Master eligibility, apply through DLI, study the 2026 NEC, sharpen advanced calculations, practice planning and supervision, pass the Class A Master exam, and prepare for contractor responsibility.

1

Confirm Master eligibility

Review the current Master qualification routes and 60-month detailed experience standard.

2

Apply through Minnesota DLI

Submit your Class A Master examination application and required experience documentation.

3

Master 2026 NEC navigation

Build speed with the index, articles, tables, exceptions, and cross-references without depending on personal tabs.

4

Strengthen advanced calculations

Practice services, feeders, loads, conductors, motors, transformers, voltage drop, box fill, and raceway fill.

5

Study planning and supervision

Review system planning, layout, installation supervision, and code-compliance responsibility.

6

Take the Class A Master exam

Complete 80 questions within 5.5 hours and earn at least 70 percent.

7

Prepare for contractor responsibility

Understand the responsible licensed individual, insurance, bonding, business-disclosure, permit, and inspection responsibilities of a Minnesota electrical contractor.

Six-Week Minnesota Master Electrician Exam Prep Plan

Week 1

2026 NEC Navigation

  • Definitions and code structure
  • Index and article lookup
  • Tables and exceptions
  • Diagnostic Master exam
Week 2

Services, Feeders and Loads

  • Service calculations
  • Feeder calculations
  • Demand factors
  • Branch-circuit requirements
Week 3

Grounding and Protection

  • Grounding and bonding
  • Overcurrent protection
  • Conductor sizing
  • Separately derived systems
Week 4

Motors and Transformers

  • Motor circuits and controls
  • Overloads and protection
  • Transformer calculations
  • Equipment requirements
Week 5

Master Responsibilities

  • Planning and layout
  • Supervision
  • Minnesota laws and rules
  • Contractor responsibilities
Week 6

Full DLI Master Simulation

  • 80-question timed exams
  • Advanced calculations
  • Clean NEC navigation
  • Final weak-area review

Minnesota Master Electrician Exam Reference Strategy

Do this during exam prep

  • Study directly from the 2026 NEC
  • Practice with an unmodified code book
  • Build fast article, table, and index navigation
  • Memorize advanced calculation workflows
  • Review Minnesota laws and contractor rules
  • Complete full 5.5-hour-style sessions

Avoid these mistakes

  • Depending completely on personal tabs
  • Planning to bring personal study guides into the exam
  • Studying only Journeyworker-level material
  • Skipping Master-level calculations
  • Ignoring planning, supervision, and contractor responsibilities
  • Practicing only short quizzes

Timing strategy: 80 questions in 5.5 hours averages about 4.1 minutes per question. Reserve additional time for multi-step calculations and difficult code-navigation problems.

Minnesota Master Electrician Exam Prep Options

Instructor-Led Master Exam Prep

Guided 2026 NEC Master Prep
  • 2026 NEC study
  • Master Electrician Study Guide
  • Calculations Study Guide
  • Instructor-led NEC course
  • Simulated practice exams
View Instructor-Led Master Prep

Master + Calculations + 2026 NEC Combo

Advanced Calculation and Code Prep
  • Minnesota Master study guide
  • Electrician Calculations Study Guide
  • 2026 NEC
  • Advanced calculation practice
  • Master-level code navigation
View Master Calculations Combo
Minnesota Master Electrician contractor exam prep

Master Electrician and Electrical Contractor Are Connected Minnesota Credentials

The Class A Master Electrician license is the advanced personal credential required for the responsible licensed individual of a Minnesota electrical contractor.

· Master exam: 80 questions

· 5.5-hour testing limit

· 70% minimum passing score

· Current exam code: 2026 NEC

· Master experience framework: 60 months

· Master Electrician can serve as contractor responsible licensed individual

Minnesota Master Electrician Contractor Exam Prep FAQ

Minnesota Class A Master Exam Basics

The Minnesota Department of Labor and Industry administers the Class A Master Electrician licensing examination.
The current DLI electrical licensing examination guide lists 80 questions for the Class A Master Electrician examination.
Candidates receive five and one-half hours, or 330 minutes, to complete the examination.
A minimum score of 70 percent is required to pass the examination.
Current Minnesota electrical licensing examinations use the 2026 National Electrical Code.
Minnesota provides the exam references. DLI supplies a softcover NEC, the current Laws and Rules Booklet, and an electronic calculator.
No. Current DLI guidance says personal reference books, study guides, phones, and other electronic devices are not permitted in the examination building.
Study NEC fundamentals, services, feeders, branch circuits, grounding and bonding, protection, conductors, wiring methods, motors, transformers, special occupancies, equipment, advanced calculations, planning, layout, supervision, and Minnesota laws and rules.
Yes. Practice service and feeder calculations, conductor sizing, voltage drop, motors, transformers, box fill, raceway fill, and load calculations.
Master-level preparation should include planning, laying out, and supervising electrical installations, along with code compliance and responsible licensed-person duties.

Minnesota Master Experience and Licensing

The current DLI experience table lists a minimum total of 60 months of qualifying electrical experience.
The current experience table lists a minimum of two months of qualifying planning experience.
The current experience table lists a minimum of two months laying out electrical wiring, apparatus, and equipment.
The current experience table lists a minimum of two months supervising the installation of electrical wiring, apparatus, and equipment.
The current experience table lists at least 12 months wiring for and installing electrical wiring, apparatus, and equipment.
Minnesota licensing guidance lists one year of experience working as a journeyworker electrician as one route to qualify for the Master exam, subject to DLI approval.
Minnesota licensing guidance lists an accredited electrical engineering degree as another Master examination qualification route, subject to DLI review.
The current DLI examination guide says an applicant may submit another exam application 30 days after notification of the failed examination.

Minnesota Electrical Contractor Responsibilities

A Minnesota electrical contractor must designate a responsible licensed individual who holds an active Master Electrician license and is responsible for the company's electrical work.
No. Current DLI contractor guidance says the responsible licensed individual may not act as the responsible licensed individual for another electrical contractor or employer.
Current DLI contractor requirements include liability insurance, workers' compensation compliance, a surety bond, business ownership or officer disclosures, and the contractor-license application.
The contractor must notify DLI and follow the current process for designating a new responsible Class A Master Electrician.
DLI supplies the exam-room NEC, so candidates should be able to navigate articles, tables, notes, and exceptions without depending on personal tabs.
Start with 2026 NEC navigation, services and feeders, grounding and bonding, overcurrent protection, advanced calculations, motors, transformers, planning, supervision, and Minnesota laws and contractor rules.

1 Exam Prep Minnesota Master Electrician Exam Prep Video

Ready to Prepare for the Minnesota Class A Master Electrician Exam?

Build 2026 NEC navigation speed, advanced calculation accuracy, service and feeder knowledge, grounding and bonding confidence, motor and transformer skill, planning and supervision knowledge, Minnesota contractor awareness, and full-length DLI exam endurance.

Questions? Call 877-775-9400
or email sales@1examprep.com

Minnesota Master Electrician Exam Prep