Two exams, 70 percent to pass, one statewide CUC license
Prepare for both required Florida certified underground utility and excavation contractor examinations with current reference books, book-navigation training, practice questions, timed simulations, and licensing support.
To earn Florida's certified underground utility and excavation contractor license, commonly called the CUC license, you must pass the Underground Utility Trade Knowledge examination (80 scored questions, five hours) and the Business and Finance examination (120 scored questions, 6.5 hours), each with at least 70 percent, then meet the Construction Industry Licensing Board requirements for experience, financial responsibility, fingerprinting, insurance, and fees.
Both examinations are computer based and open book, using only the references approved for the examination year. This is a Division II license, so candidates take two parts rather than the three-part examination used for general, building, and residential contractors.
The numbers candidates ask for most. Verify each against the current DBPR materials before you register, apply, or order books.
| Exam | Scored questions | Time | Format | Passing score |
|---|---|---|---|---|
| Underground Utility Trade Knowledge | 80 | 5 hours | Computer based, open book | 70% |
| Business and Finance | 120 | 6.5 hours | Computer based, open book | 70% |
Underground utility is a Division II category, so applicants take Trade Knowledge and Business and Finance rather than the three-part examination used for general, building, and residential contractors. Do not plan from a general contractor product table or three-exam description.
A certified underground utility and excavation contractor may contract statewide within the scope established by section 489.105, Florida Statutes.
The license covers specified main water, sanitary sewer, and storm sewer systems on public or private property, including open excavation and multiple trenchless installation methods. The certified credential is statewide, while a registered contractor is limited to the jurisdictions supported by the local certificate of competency.
Construction, installation, and repair involving:
Termination points are defined precisely. Water lines run through the meter location for an individual occupancy. Sewer collection lines run through the property-line termination for residential or single-occupancy commercial property, and multioccupancy sewer lines run through the manhole or engineered wye-lateral termination. Storm sewer systems run through storm sewer structures.
Yes. Certified underground utility and excavation contractors may perform clearing, grubbing, grading, excavation, and other site work for construction projects under section 489.113, subject to other applicable laws and scopes.
That is worth knowing before you bid, because sitework and underground utility are not the same thing. Sitework is a broad commercial term covering grading, clearing, paving preparation, drainage, and utilities. The license is tied specifically to main utility systems and the continuation points above. When the classification is unclear, confirm it with DBPR rather than assume.
Only empty conduit, and only under specific conditions. The license permits installation of empty underground conduits in rights-of-way, easements, and platted rights-of-way in new site development, plus sleeves for parking-lot crossings no smaller than two inches in diameter, when all of the following apply:
No. The license does not authorize installation of piping that becomes an integral part of a fire-protection system, from the point where the piping is used exclusively for that system. That work belongs to a fire protection contractor.
Eight steps, in the order DBPR and the board expect them. Note that examination registration and licensing eligibility are handled by different bodies.
Compare your intended water, sanitary sewer, storm sewer, excavation, and trenchless work with the statutory scope. Identify the excluded fire-protection and energized-electrical work before you plan around it.
Select a qualification pathway and map your employment records to the five underground utility experience areas. Confirm at least one year of foreman experience when the pathway requires it.
Construction candidates apply through Professional Testing, Inc. Professional Testing registers candidates and develops and scores the examinations, but it does not issue licenses or determine final licensing eligibility.
Use the DBPR reference list for your exact examination year. The trade list on this page is valid January through December 2026. See the reference list below.
Prepare separately for Trade Knowledge and Business and Finance. Practice with the same legal books and tab layout you plan to carry on exam day.
After approval, schedule the computer-based examinations through Pearson VUE. Current construction examinations other than plumbing are offered in computer-based format.
Earn at least 70 percent on Trade Knowledge and Business and Finance. The four-year examination period begins with the first scheduled examination date, and all required parts must be passed within it.
After passing, submit the correct CILB 5-N or CILB 6-N application with experience, credit, fingerprint, insurance, workers' compensation, background, and fee documentation. Application assistance is available.
The five-hour trade examination contains 80 equally weighted questions. The official content outline allocates them approximately as follows, and DBPR notes each percentage may vary by up to three points.
| Content area | Weight | What to study |
|---|---|---|
| Pre-Installation | 20% | Site inspection, estimating, shop drawings, codes, utility location, soil, groundwater, erosion control, material handling |
| Excavating, Backfill, and Compaction | 20% | Trenching, shoring, dewatering, pavement removal, backfill, compaction, soil testing |
| Pipe Installation and Repairs | 15% | Ductile iron, PVC, concrete, and other piping systems, directional boring, jacking and boring, slip lining |
| Piping, Valves, and Fittings | 15% | Taps, restraints, thrust blocks, hydrants, meters, valves, fittings, supports, cathodic protection |
| Testing, Disinfecting, and Job Closeout | 10% | Gravity and pressure testing, leakage, infiltration, flushing, disinfection, bacteriological sampling, as-builts, operating manuals |
| Equipment | 10% | Excavators, trenchers, compactors, pumps, loaders, cranes, rigging, boring equipment, safety |
| Traffic Control | 5% | Maintenance of traffic, signage, barriers, flagging, roadway safety |
| Drainage Systems | 5% | Storm drainage systems, structures, slopes, capacities, connections |
Candidates must also read plans, specifications, and codes and perform basic mathematics involving area, volume, fractions, decimals, percentages, triangles, square roots, powers, and simple algebra. Pre-installation and excavation together are 40 percent of the exam, and pipe installation plus piping and fittings add another 30 percent.
The examination contains 120 scored questions and allows 6.5 hours. The major content areas are:
Within those areas, study bidding, contracts, lien law, insurance, payroll, taxes, project scheduling, purchasing, safety records, accounting, financial statements, employment practices, and regulatory compliance. This is the same examination other Division II contractors take, so passing it also counts if you later add another classification. Full detail sits on the Business and Finance exam prep page.
Not always. A trade-reference set alone is not the complete library for both examinations.
Before buying anything described as covering everything required, confirm whether it includes both the trade references and the Business and Finance references, or whether the business books are sold separately.
The DBPR trade list valid January through December 2026 includes the titles below. Several are permitted as bound PDFs, so review the official list for exact binding requirements before you print anything.
| Trade Knowledge reference (2026) | Used for | Study priority |
|---|---|---|
| Pipe and Excavation Contracting, 2011 | Core trade fundamentals across excavation and pipe work | Very high |
| OSHA 29 CFR Part 1926, July 1, 2025 | Trenching, excavation, equipment, and jobsite safety | Very high |
| Installation Guide for Ductile Iron Pipe, 2024 | Ductile iron pipe installation | High |
| AWWA C900, PVC Pressure Pipe and Fabricated Fittings, 4 to 60 inches, 2022 | PVC pressure pipe and fittings | High |
| Handbook of PVC Pipe Design and Construction, 5th Edition, 2012 | PVC pipe design and construction | High |
| Walker's Building Estimator's Reference Book, 33rd Edition, 2024 | Quantities, estimating, production | High |
| Damage Prevention Guide, with Florida Statutes Chapter 556, 2020 | Utility location and safe digging | High |
| FDOT 555-Directional Bore, 2025-2026 | Directional bore work | High |
| FDOT 556-Jack and Bore, 2025-2026 | Jack and bore work | High |
| Concrete Pipe and Box Culvert Installation, 2007-2019 | Concrete drainage systems and culverts | Medium |
| Utility Accommodation Manual, 2017 | Right-of-way utility work | Medium |
| Florida Building Code, Plumbing, 2023 | Code interpretation and crossover topics | Medium |
Candidates are strongly encouraged to use every approved reference relevant to the tested content. Confirm the complete list and editions before buying, since edition changes alter tables, sections, and page numbers.
The official list says earlier or later editions may be brought at the candidate's risk, while exam answers are based on the listed editions. Testing with the listed editions is the safer strategy.
No. Permanent tabs are allowed, but pre-tabbed and highlighted books are a product option rather than a state requirement. You can prepare compliant books yourself. What a prepared set buys you is time, not eligibility.
Open book does not mean unrestricted. These are the rules for 2026 construction examinations.
On a timed open-book exam, reference routing decides outcomes as much as trade knowledge does. Build both.
Edition changes can alter tables, sections, and page numbers. Use the references valid for your planned examination date, and give yourself time to learn how each one is organized before you start memorizing anything.
For each topic, know which book is most likely to contain the answer. Practice moving from the question to the reference, then to the standard, table, or specification. A ductile iron question and a PVC pressure question go to different books, and knowing that instantly is the skill being tested.
Study trench quantities, excavation volume, backfill, compaction, pipe slope, invert elevation, flow, pressure, thrust restraint, concrete quantities, production rates, and estimating. Check your units before selecting an answer, because unit errors are a common way to lose points you should have earned.
Trade Knowledge averages 3.75 minutes per scored question and Business and Finance averages 3.25 minutes. Practice reserving time for calculations and multi-step lookups, since those run well past the average.
Know the permitted main systems, the termination points, the empty-conduit conditions, and the fire-protection exclusion. Scope questions appear on the exam and they matter in the field.
Use permanent tabs and legal highlighting. Remove all notes and removable markers before exam day, because losing the use of a key reference on the trade exam is close to disqualifying.
Applicants for initial certification generally must satisfy all of the following. Verify the current application instructions for your exact pathway.
| Requirement | Detail |
|---|---|
| Age | At least 18 years old |
| Examinations | Pass both state examination parts with at least 70 percent |
| Experience | Meet one approved education and experience pathway, with documented underground utility experience |
| Fingerprints | Submit electronic fingerprints after the licensure application, through an FDLE-registered Livescan provider |
| Credit report | A qualifying credit report for active status, with a FICO-derived score |
| Public records | Address liens, judgments, or bankruptcy records when applicable |
| Insurance | At least $100,000 public liability and $25,000 property damage for this category |
| Workers' compensation | Coverage or a valid exemption, with an attestation to obtain it within 30 days if not in place at issuance |
| Fees and application | Pay applicable fees and file the correct individual or business-qualifier application |
| Timing | Obtain the license within four years after receiving the examination score |
Applicants must select one qualifying method:
Military applicants may qualify through designated combinations of military service, worker experience, and foreman experience. A worker is a person who learned the trade through active experience and can command the rate of a mechanic in that trade. A foreman is in charge of a group of workers and usually reports to a superintendent, contractor, or equivalent.
The current CILB 5-N application identifies five areas: main sanitary sewer collection systems, excavation and earthwork, main water distribution systems, trenchless installations, and storm sewer collection systems.
Applicants who document three of these five through their combined employment history may have their experience approved administratively. Applicants with fewer than three may still be considered, but the Construction Industry Licensing Board must review whether the experience is satisfactory. That difference is worth planning around, since board review adds time.
Examination registration focuses on examination approval and does not guarantee licensing eligibility. You can pass both exams and still be denied a license for insufficient experience.
Professional Testing does not decide licensing eligibility, and passing does not cure an experience deficiency. Because all required parts must be completed within the examination period and the license must be obtained within the score-validity period, confirm that your experience timeline can support licensure before you invest in testing.
Active applicants must submit a credit report from a nationally recognized agency that includes a FICO-derived score, states that local, state, and federal public records were checked, and shows whether unsatisfied judgments or liens exist.
Financial stability is demonstrated by a FICO score of at least 660. Under the current CILB 5-N individual application, an applicant with a score below 660 must complete an approved 14-hour financial responsibility course. Proof of satisfaction or discharge is required for applicable liens, judgments, and bankruptcies.
The current individual application does not state that universal requirement. Older school copy commonly repeats a blanket bond or letter of credit claim for every sub-660 Division II applicant. Follow the current application and Rule 61G4-15.006 for the exact active-status pathway.
No. The board separately evaluates experience, education, financial responsibility, fingerprints, insurance, background, and application completeness.
Certified contractors generally complete board-approved continuing education each biennium. Verify current hours, mandatory topics, deadlines, and exemptions on the DBPR renewal page rather than relying on a fixed number.
Certification by endorsement may be available when statutory and board requirements are satisfied, but it is not automatic reciprocity. Review the current endorsement requirements for your state and credentials rather than assuming there is no pathway.
No course is legally required to sit for the examinations. Structured preparation improves reference routing, calculation speed, and pacing, which are the things a timed open-book exam actually measures.
Choose the option that matches your experience and the references you already own. Confirm current price, access period, included editions, shipping, and return terms on each product page.
This page sits inside a wider Florida licensing library. The hub above covers every classification, the pages beside this one cover related trades and the shared exam, and the pages below cover the specific tasks a CUC candidate has to complete.
If you are still deciding which Florida license fits your business, start here and work down.
Underground utility is a Division II trade. These pages cover the neighboring classifications and the Business and Finance exam every Division II contractor takes.
The task-level pages and products a CUC candidate uses week to week.
Trade Knowledge instruction, Business and Finance preparation, current reference books, permanent tab options, practice questions, timed simulations, and help with the DBPR application.