Ahora eres elegible ENVÍO GRATIS
$0.00 USD
$0.00 USD
The ICC Class DF Fire Suppression Installation Contractor - G35-N examination is intended for fire protection professionals preparing to demonstrate their knowledge of water-based fire suppression systems, automatic sprinklers, standpipes, hose systems, fire pumps, water supplies, system components, acceptance testing, inspection, maintenance, building-code requirements, and fire-code responsibilities.
The ICC Class DF Fire Suppression Installation Contractor - G35-N Exam Book Package brings together fire protection codes and standards selected to support organized, book-based exam preparation.
The package is listed at a sale price of $1,495.00, reduced from the regular price of $1,595.00.
This guide explains the package contents, major G35-N study areas, fire suppression contractor responsibilities, sprinkler and standpipe concepts, fire pump requirements, system testing, reference-book navigation, and practical preparation strategies.
The ICC Class DF Fire Suppression Installation Contractor - G35-N Exam Book Package is designed for candidates who prefer preparing directly from printed fire protection codes and standards.
Fire suppression installation requires candidates to connect building and fire-code requirements with detailed standards for sprinklers, standpipes, fire pumps, water supplies, valves, alarms, acceptance testing, inspection, maintenance, and system impairments.
The package is listed at a sale price of $1,495.00, reduced from the regular price of $1,595.00.
This package may be appropriate for candidates who:
The current package listing identifies the following references:
These books support preparation involving automatic sprinkler systems, standpipes, hose connections, fire department connections, stationary fire pumps, system water supplies, valves, alarms, acceptance tests, system impairments, inspection, testing, maintenance, and fire protection requirements within buildings.
Candidates should verify the exact editions and approved book list before ordering or registering because examination requirements may vary by jurisdiction and code cycle.
The G35-N examination is associated with the ICC Contractor and Trades testing program and the Class DF Fire Suppression Installation Contractor classification.
Participating licensing authorities may use the examination to evaluate whether a contractor or qualifying individual understands the installation and code requirements associated with water-based fire protection systems.
Preparation may include questions involving:
Candidates should confirm the current examination format, approved references, testing time, passing requirement, and book-marking rules through ICC and the licensing authority requiring the examination.
Passing an ICC Contractor and Trades examination does not automatically issue a fire suppression contractor license in every jurisdiction.
Before purchasing books or scheduling the examination, candidates should verify:
Confirming these details helps candidates avoid studying for an incorrect exam or using materials from the wrong code cycle.
A fire suppression installation contractor installs, alters, repairs, and services fire protection systems within the scope allowed by the applicable license or registration.
Common responsibilities may include:
The exact work permitted depends on the contractor classification and the requirements of the licensing jurisdiction.
Water-based fire protection systems are designed to control or suppress fires, protect building occupants and property, and support fire department operations.
Common system categories include:
Candidates should understand the purpose, operating sequence, components, installation limitations, and testing requirements associated with each applicable system.
A major part of G35-N preparation is learning which reference applies to each question.
Before searching a book, candidates should identify whether the question concerns a building requirement, fire-code responsibility, sprinkler installation, standpipe system, fire pump, or ongoing system maintenance.
The International Building Code establishes requirements for building construction and identifies situations in which fire protection systems may be required.
Important preparation areas may include:
Candidates should understand that the IBC often determines when a system is required, while the referenced NFPA standard explains how that system must be installed.
The International Fire Code addresses fire prevention, operational permits, fire protection systems, emergency access, hazardous conditions, system impairments, inspections, and ongoing maintenance responsibilities.
Important study areas may include:
Candidates should learn when the IFC provides the controlling requirement and when it sends the user to an NFPA installation or maintenance standard.
NFPA 13 is the primary installation standard in the package for automatic sprinkler systems.
Important study subjects may include:
Candidates should become familiar with NFPA 13 definitions, tables, figures, occupancy classifications, installation chapters, and system-specific requirements.
A wet-pipe system contains water under pressure throughout the sprinkler piping during normal service.
Important study areas may include:
Wet-pipe systems are generally straightforward, but candidates must still understand valve arrangements, alarms, drainage, testing, and protection from freezing.
A dry-pipe system contains pressurized air or nitrogen in the piping. Water enters the system after a sprinkler operates and the dry-pipe valve opens.
Study subjects may include:
Candidates should understand how dry-pipe systems differ from wet-pipe systems and why drainage and air-pressure control are especially important.
A preaction system generally requires a separate detection event before water enters the sprinkler piping.
Important preparation areas may include:
Candidates should identify the operating sequence described in the question before selecting the applicable requirement.
A deluge system uses open sprinklers or nozzles connected to piping controlled by a deluge valve. When the detection system operates, water is admitted to all discharge devices.
Study areas may include:
Deluge questions may require candidates to distinguish the open-discharge arrangement from systems that use individually heat-operated sprinklers.
Sprinkler system requirements are influenced by the occupancy hazard classification and the expected quantity, arrangement, and combustibility of materials.
Common classification areas may include:
Candidates should avoid classifying a space by its building name alone. The actual use, fuel load, operations, and storage arrangement may control the classification.
Sprinklers are selected according to their listing, orientation, response characteristics, temperature rating, discharge pattern, and intended application.
Study subjects may include:
The contractor should verify that the installed sprinkler matches the approved plan, listing, orientation, and environmental conditions.
Sprinkler position affects the ability of the discharge pattern to reach and control a fire.
Inspection and exam subjects may include:
Candidates should read the entire installation condition because spacing and obstruction rules can depend on sprinkler type and ceiling construction.
Structural members, ducts, lights, pipes, cable trays, shelving, equipment, and architectural features may obstruct sprinkler discharge.
Study areas may include:
Candidates should learn how to identify the obstruction type before applying the applicable positioning rule.
Sprinkler piping and fittings must be listed or approved for the system and installed according to the applicable standard and manufacturer requirements.
Study subjects may include:
Candidates should identify the material and joining method described before selecting the applicable installation requirement.
Sprinkler and standpipe piping must be supported to carry system weight, resist movement, and maintain alignment during normal service and expected building conditions.
Study areas may include:
Candidates should distinguish ordinary pipe support requirements from seismic bracing and restraint requirements.
Fire suppression systems use control, alarm, check, pressure-regulating, and test valves to manage water flow and system operation.
Important study areas may include:
The contractor should confirm that valves are installed in the correct orientation, accessible for operation, properly supervised, and identified.
A fire suppression system must have a water supply capable of supporting the required system demand for the required duration.
Possible water supplies may include:
Study subjects may include available pressure, available flow, system demand, duration, elevation, friction loss, supply reliability, and the effect of valves or backflow assemblies.
Waterflow testing helps establish the pressure and flow available from a water supply.
Study considerations may include:
Candidates should understand the difference between static and residual pressure and how water supply test information supports system evaluation.
A fire department connection allows responding fire personnel to supplement the water supply serving a sprinkler or standpipe system.
Study areas may include:
The fire department connection should be installed where responding personnel can identify and use it effectively.
Water-based fire suppression systems often include devices that indicate waterflow, valve position, pressure conditions, or system trouble.
Study subjects may include:
Candidates should understand the difference between an alarm signal, supervisory signal, and trouble signal.
NFPA 14 provides installation requirements for standpipe and hose systems used to support manual firefighting operations.
Important study areas may include:
Candidates should identify the standpipe class and system type before applying the installation requirement.
Standpipe classes are based on the type of hose connection and intended users.
Preparation should include:
Candidates should not confuse the standpipe class with whether the system is automatic, manual, wet, or dry.
Standpipe systems may be classified according to whether water is present in the piping and how the water supply is delivered.
Possible system types include:
Each type has different water-supply, valve, operational, testing, and fire department connection considerations.
Standpipe hose connections must be located so firefighters can reach required areas while operating from protected or accessible positions.
Study areas may include:
Candidates should compare the building configuration with the applicable placement requirement.
Standpipe systems must provide the required flow and pressure at the hydraulically remote hose connections.
Preparation may include:
Candidates should identify the system class, building conditions, and number of standpipes before applying flow and pressure requirements.
Pressure-regulating devices may be required where static or residual pressure exceeds permitted limits.
Study subjects may include:
Improper adjustment can leave hose connections with either excessive pressure or insufficient firefighting performance.
NFPA 20 addresses stationary pumps used when the available water supply cannot provide the required pressure or flow without mechanical assistance.
Important study areas may include:
Candidates should become familiar with the relationship between the pump, driver, controller, water supply, and connected fire protection systems.
Fire pumps are selected to meet the required system flow and pressure based on the available water supply and calculated fire protection demand.
Study areas may include:
Candidates should understand how pump performance is evaluated at no flow, rated flow, and higher-flow test points.
Suction piping must provide a reliable, unobstructed water path to the fire pump.
Study subjects may include:
Improper suction arrangements can reduce pump performance and create unstable operating conditions.
Discharge piping carries water from the fire pump to the fire protection system.
Study areas may include:
Candidates should understand the purpose and required sequence of major components in the pump discharge arrangement.
A fire pump may be driven by an electric motor, diesel engine, or another approved driver.
Study subjects may include:
Candidates should identify the driver type before applying electrical, fuel, ventilation, or testing requirements.
The fire pump controller starts, monitors, and controls the fire pump driver.
Study areas may include:
The controller should be located and installed so it remains accessible and protected while supporting reliable pump operation.
A pressure-maintenance pump, commonly called a jockey pump, helps maintain system pressure and reduce unnecessary fire pump starts caused by minor leakage or pressure changes.
Study subjects may include:
The pressure-maintenance pump should not be sized or adjusted in a way that prevents the fire pump from starting when a significant system demand occurs.
Fire pump rooms must provide suitable access, protection, temperature control, lighting, drainage, and working space.
Study areas may include:
Candidates should review both NFPA 20 and applicable building or fire-code requirements when a question concerns the pump room.
Acceptance testing verifies that the installed fire pump system performs according to the approved design and applicable standard.
Testing may include:
Test results should be compared with the approved pump data and required performance characteristics.
Flushing removes debris from underground and aboveground piping before the system is placed into service.
Study areas may include:
Debris left in the piping can obstruct sprinklers, valves, check valves, fire pump components, and test connections.
Hydrostatic testing verifies the integrity of installed piping, joints, fittings, and system components.
Preparation may include:
Candidates should use the standard that applies to the specific sprinkler, standpipe, underground, or fire pump piping being tested.
Acceptance testing demonstrates that the completed system operates according to approved plans and applicable standards.
Testing and documentation may include:
Candidates should understand which tests apply to each system and what records must be completed before final acceptance.
NFPA 25 addresses the ongoing inspection, testing, and maintenance of water-based fire protection systems after installation.
Important study areas may include:
Candidates should understand that NFPA 25 focuses on maintaining existing systems rather than establishing the original installation design.
NFPA 25 distinguishes between inspection, testing, and maintenance activities.
Candidates should identify which type of activity the question describes before locating the frequency or procedure.
An impairment exists when a fire protection system or part of a system is out of service or unable to perform as intended.
Preparation may include:
Contractors should understand both the technical repair work and the communication procedures needed to manage an impairment safely.
Existing sprinklers should be inspected for conditions that may interfere with operation or discharge.
Possible conditions include:
Replacement sprinklers should match the required characteristics and be installed using approved tools and procedures.
Control valves must remain open, accessible, properly identified, and supervised where required.
Inspection may include:
A closed or improperly positioned valve can disable a major portion of a fire protection system.
Main drain testing helps identify significant changes in the condition of the water supply.
The procedure generally involves:
A substantial change may indicate a partially closed valve, supply restriction, backflow assembly issue, or another water-supply problem.
Waterflow alarm testing verifies that system operation produces the required local and transmitted alarm signals.
Study subjects may include:
Candidates should understand how the test connection simulates the flow from an operating sprinkler.
Existing standpipe systems require inspection and testing to verify that valves, hose connections, pressure-regulating devices, piping, and water supplies remain serviceable.
Study areas may include:
Candidates should identify whether the question concerns an installation requirement under NFPA 14 or an ongoing maintenance requirement under NFPA 25.
Existing fire pumps require recurring inspection and testing to confirm reliable operation.
Preparation may include:
Candidates should distinguish the original acceptance test under NFPA 20 from recurring inspection and testing under NFPA 25.
Fire suppression system documentation provides evidence of approved installation, testing, maintenance, and repairs.
Important records may include:
Complete records support system acceptance, future inspections, repairs, alterations, and investigation of performance problems.
Installation work should be compared with the approved plans, calculations, specifications, and product information.
Important plan information may include:
Field changes should be documented and approved through the required process rather than made without authorization.
Fire suppression piping must be coordinated with structural, mechanical, electrical, plumbing, architectural, and ceiling systems.
Coordination subjects may include:
Poor coordination can create sprinkler obstructions, inadequate access, incorrect elevations, damaged piping, and unapproved field changes.
Fire suppression piping may pass through fire-resistance-rated walls, floors, shafts, and assemblies.
Inspection and coordination considerations may include:
The fire suppression contractor should coordinate penetrations so the required fire-resistance rating is maintained.
Fire suppression installation involves overhead work, heavy pipe, pressurized systems, power tools, lifts, ladders, testing equipment, and active construction sites.
Important safety considerations may include:
Candidates should connect code compliance with the responsibility to protect workers, building occupants, inspectors, and property.
An open-book examination still requires fast and accurate navigation. A candidate may lose valuable time by searching NFPA 13 for a fire pump question or NFPA 25 for an original installation requirement.
A practical lookup method includes:
Candidates should practice selecting the correct book before searching for the exact answer.
Tabs, highlighting, bookmarks, and permitted notes may improve navigation when they comply with current testing rules.
A practical tab system may include:
Candidates should verify current ICC rules before adding tabs, notes, highlighting, or other modifications.
A reference map is a short study sheet that identifies the major purpose and high-value chapters of each book.
A useful reference map may include:
The purpose is not to replace the books. It is to help candidates select the correct book quickly when reading a question.
G35-N preparation may involve interpreting pressure, flow, pipe size, elevation, duration, test data, and system demand.
Useful calculation and interpretation skills may include:
Candidates should confirm the units used in every question before completing a calculation or selecting an answer.
Begin preparing several weeks before the examination and divide the references into manageable subjects.
A practical study schedule may include:
Use the same book editions throughout preparation that you expect to use during the examination.
Scenario-based study helps candidates connect technical requirements with realistic installation and service conditions.
Useful practice questions may include:
After answering each question, candidates should locate the supporting section and review why the selected requirement applies.
Effective time management helps candidates avoid becoming stuck on one complex code lookup or technical scenario.
Helpful strategies include:
Timed practice can reveal whether a candidate needs to improve terminology, book selection, calculation accuracy, or navigation speed.
Reviewing mistakes is one of the most useful parts of exam preparation.
For each missed question, identify:
A mistake log can help candidates identify repeated weak areas and direct their study time more effectively.
Printed codes and standards allow candidates to study the same terminology, system requirements, tables, figures, testing procedures, and documentation provisions used in fire suppression work.
Book-based preparation may help candidates:
The package is most effective when candidates actively locate and apply requirements rather than relying only on memorization.
The ICC Class DF Fire Suppression Installation Contractor - G35-N Exam Book Package may be useful for:
Candidates should confirm that G35-N and the listed editions are accepted by the jurisdiction where they plan to become licensed.
Q. What is the ICC Class DF Fire Suppression Installation Contractor - G35-N exam?
A. It is an ICC Contractor and Trades examination path used by participating licensing authorities to evaluate knowledge of water-based fire suppression installation, sprinkler systems, standpipes, fire pumps, building codes, fire codes, testing, and contractor responsibilities.
Q. How much does the G35-N Exam Book Package cost?
A. The package is listed at a sale price of $1,495.00, reduced from the regular price of $1,595.00.
Q. What books are included in the package?
A. The current listing identifies the 2018 International Building Code, 2018 International Fire Code, 2016 NFPA 13, 2016 NFPA 14, 2016 NFPA 20, and 2017 NFPA 25.
Q. Does the package include an online course?
A. No. This product is listed as an exam book package containing the specified printed codes and standards.
Q. What does NFPA 13 cover?
A. NFPA 13 covers the design and installation of automatic sprinkler systems, including system types, sprinkler selection, spacing, obstructions, piping, hangers, valves, water supplies, and acceptance testing.
Q. What does NFPA 14 cover?
A. NFPA 14 covers standpipe and hose systems, including system classes, system types, hose connections, water supplies, pressure, flow, fire department connections, and acceptance testing.
Q. What does NFPA 20 cover?
A. NFPA 20 covers stationary fire pumps, including pumps, drivers, controllers, suction piping, discharge piping, pump rooms, power supplies, and acceptance testing.
Q. What does NFPA 25 cover?
A. NFPA 25 covers inspection, testing, maintenance, and impairment procedures for existing water-based fire protection systems.
Q. Why are the IBC and IFC included?
A. The IBC helps candidates study when fire protection systems are required in buildings. The IFC supports preparation involving permits, acceptance, operations, system impairments, maintenance, and ongoing fire-safety responsibilities.
Q. What sprinkler systems should I study?
A. Candidates should review wet-pipe, dry-pipe, preaction, deluge, and other system types included in the approved examination outline and references.
Q. Should I study sprinkler spacing and obstructions?
A. Yes. Sprinkler position, spacing, ceiling configuration, structural members, ducts, lights, storage, and other obstructions are important installation subjects.
Q. Should I study standpipe classes?
A. Yes. Candidates should understand Class I, Class II, and Class III systems and distinguish the system class from whether the standpipe is automatic, manual, wet, or dry.
Q. Should I study fire pump curves?
A. Yes. Candidates should understand rated flow, rated pressure, churn conditions, higher-flow performance, suction pressure, discharge pressure, and acceptance-test results.
Q. What is the difference between NFPA 13 and NFPA 25?
A. NFPA 13 primarily addresses sprinkler system installation, while NFPA 25 primarily addresses inspection, testing, and maintenance after a system is in service.
Q. What is a fire protection system impairment?
A. An impairment is a condition in which a system or part of a system is out of service or unable to perform as intended. Impairment procedures may include notifications, temporary precautions, repairs, restoration testing, and final documentation.
Q. Is the G35-N exam open book?
A. Current product information describes the examination path as open book. Candidates should verify the latest ICC and jurisdictional rules before registering.
Q. Does open book mean the exam is easy?
A. No. Candidates must select the correct reference, find the applicable requirement, interpret the technical language, and answer within the permitted testing time.
Q. Can I highlight and tab the books?
A. Book-marking rules may change. Candidates should confirm current requirements for tabs, highlighting, handwritten notes, and loose materials before exam day.
Q. How should I organize the six books?
A. Organize them by subject and learn which book covers building requirements, fire-code duties, sprinklers, standpipes, fire pumps, and ongoing inspection or maintenance.
Q. Should I practice technical calculations?
A. Yes. Candidates should be comfortable interpreting pressure, flow, elevation, pump performance, water-supply test data, and other system information identified in the current examination outline.
Q. Does passing G35-N automatically issue a contractor license?
A. No. Passing the exam may satisfy a testing requirement, but the applicable licensing authority controls experience, applications, insurance, financial requirements, and final license approval.
Q. Can field experience replace exam preparation?
A. Field experience is valuable, but candidates should also practice book navigation, technical interpretation, system scenarios, and exam-style questions.
Q. Can the approved code editions change?
A. Yes. Candidates should verify the latest approved references through ICC and the applicable licensing authority before purchasing books or registering.
Q. Does the package guarantee that I will pass?
A. No. The package supports organized study and reference familiarity, but exam results depend on the candidate’s experience, preparation, study consistency, and test-day performance.
Q. Where can I purchase the G35-N Exam Book Package?
A. The package is available through the ICC Class DF Fire Suppression Installation Contractor - G35-N collection.
The ICC Class DF Fire Suppression Installation Contractor - G35-N examination requires candidates to connect practical fire protection experience with building-code requirements, fire-code responsibilities, sprinkler installation standards, standpipe requirements, fire pump systems, acceptance testing, and ongoing system maintenance.
The ICC Class DF Fire Suppression Installation Contractor - G35-N Exam Book Package brings together the 2018 International Building Code, 2018 International Fire Code, NFPA 13, NFPA 14, NFPA 20, and NFPA 25 for focused, book-based preparation.
The package is listed at a sale price of $1,495.00, reduced from the regular price of $1,595.00.
Successful candidates should verify current examination requirements, study the purpose and organization of every book, practice selecting the correct reference, review realistic installation scenarios, and complete timed lookup exercises before exam day.
Shop the ICC Class DF Fire Suppression Installation Contractor - G35-N Exam Book Package