Washington DC First Class Stationary Boilers: Class 1 Steam Engineer Requirements, Exam 313, and Study Guide

The Washington, DC First Class Stationary Boilers examination is tied to the District's Steam Engineer, Class 1 credential. The 1ExamPrep collection uses the phrase "First Class Stationary Boilers Contractor," but the District credential associated with Exam 313 is an individual Class 1 Steam Engineer license.

Class 1 is the highest steam-engineer class identified in the District's current stationary-engineer application instructions. Current D.C. regulations state that a Class 1 applicant must have the experience and knowledge to take charge of and operate any plant.

Start with the Washington DC First Class Stationary Boilers Contractor collection from 1ExamPrep. This guide explains Class 1 scope, the Class 3 experience foundation, two additional years of higher-level experience, Exam 313, turbines, boilers, environmental controls, electrical and control systems, refrigeration, closed-book preparation, fees, renewal, and the technical reference library.

What Is the Washington DC Class 1 Steam Engineer License?

The Class 1 Steam Engineer credential is an individual occupational license regulated through the District of Columbia Board of Industrial Trades. It is not a separate boiler-contractor business license.

Class 1 is designed for plant operators with advanced stationary-engineering experience and the knowledge to supervise or operate complex plants containing boilers, turbines, engines, refrigeration equipment, pumps, controls, electrical systems, condensers, cooling towers, feedwater systems, water-treatment equipment, and related plant auxiliaries.

Important naming note: the 1ExamPrep product name includes "Contractor," but the District license tied to Exam 313 is Steam Engineer, Class 1.

Class 1 Scope: Experience and Knowledge to Operate Any Plant

Current D.C. regulations state that a Class 1 Steam Engineer applicant must have the experience and knowledge to take charge of and operate any plant.

Unlike Class 2, which has a stated 750-horsepower limit, the Class 1 regulation does not place a horsepower ceiling on the plant scope in the same provision.

Any Plant

Highest Listed Steam Class

Class 1 is the broadest steam-engineer operating scope in the current District application instructions.

Class 3 Foundation

Experience Base

The applicant must first satisfy the experience required for the Class 3 Steam Engineer license.

+2 Years

Additional Experience

Class 1 adds two years of experience beyond the Class 3 requirement.

1 Higher-Level Year

Specific Plant Responsibility

One of the two additional years must meet the District's specified higher-level plant requirement.

The Class 1 Experience Requirement

The current District rule requires two years of experience in addition to the experience required for the Class 3 Steam Engineer license.

Of those two additional years, at least one year must be one of the following:

  • Experience as an engineer in a second-class plant
  • Or experience as a Class 2 Steam Engineer and assistant engineer in a first-class plant while holding a Class 2 license

This makes Class 1 a progression license built around both time and level of plant responsibility. A strong application record should show the Class 3 foundation, the two additional years, and the specific higher-level year required by the regulation.

Understanding the Underlying Class 3 Foundation

Class 1 eligibility points back to the experience required for the Class 3 Steam Engineer license. Current District materials describe Class 3 experience using two main paths.

  • Two years of qualifying experience in a high-pressure steam plant while working as an assistant engineer, fireman, or oiler
  • Or four years of experience in a plant of at least 50 horsepower, with equivalent radiation thresholds also listed by the District

The Class 3 rules also provide a one-year experience reduction for a graduate mechanical engineer from a duly recognized school of technology or a graduate of an approved engineer apprentice training program.

Official-source conflict to verify before applying: the current DLCP Stationary Engineers application sheet says the two-year Class 3 route requires a high-pressure steam plant of more than 750 boiler horsepower. The currently posted D.C. regulation text says more than 75 boiler horsepower. Because Class 1 eligibility builds on Class 3 experience, applicants should confirm the threshold directly with the Board of Industrial Trades before relying on either number for an application.

No General Reciprocity for Stationary Engineers

The District's current Stationary Engineers application instructions state that there is no general waiver or reciprocity for stationary engineers.

An out-of-jurisdiction first-class, chief engineer, stationary-engineer, or boiler license should not be assumed to replace the District's experience review, examination, and licensing process.

The specific Class 3 education-based one-year experience reduction remains part of the underlying experience rules, but that is not the same thing as a general Class 1 reciprocity pathway.

What Documents Should a Class 1 Applicant Prepare?

Current District Stationary Engineers instructions identify an Employment Verification Letter as a required supporting document, along with standard applicant materials.

  • Employment Verification Letter or letters
  • One 2-inch by 2-inch passport-style photo in the required digital format
  • Government-issued identification
  • Payment method for applicable application, examination, and license charges
  • Records supporting the underlying Class 3 experience requirement
  • Records supporting the two additional Class 1 years
  • Records showing the required higher-level year in a second-class or first-class plant
  • Education or apprenticeship documentation if using the Class 3 experience reduction

For licensing paperwork support, review 1ExamPrep application services.

Exam 313 at a Glance

80 Questions

Multiple Choice

The current First Class Stationary Boilers exam contains 80 multiple-choice questions.

3 Hours

Testing Time

Candidates currently receive three hours to complete Exam 313.

Closed Book

No Reference Lookup

The current PSI bulletin identifies Exam 313 as closed book.

$52

Current CBT Fee

The current PSI bulletin lists a $52 computer-based testing fee.

Three hours for 80 questions gives an average of about 2.25 minutes per question. The exam is broad and closed book, so recall, calculation setup, and system understanding matter.

Current Exam 313 Blueprint

Content Area Published Weight Approximate Share of 80 Questions
Turbines, Design Auxiliaries, and Operations15%About 12
Boiler Operations, Maintenance, and Safety9%About 7
Waste to Energy Plants and Environmental/Pollution Control7%About 6
Water Treatment8%About 6
Boiler Combustion and Fuels7%About 6
Boiler Accessories and Auxiliary Equipment8%About 6
Engineering Calculations7%About 6
Electrical8%About 6
Controls, Pneumatic and Electronic7%About 6
Pumps, Feed, Hydronic, and Condensate Systems8%About 6
Refrigeration, Air Conditioning, and Cooling Towers8%About 6
Boiler Design and Principles8%About 6

Turbines, Design Auxiliaries, and Operations is the largest single category at 15 percent. The remaining 85 percent is spread across eleven additional stationary-plant subjects.

Turbines, Design Auxiliaries, and Operations Are 15 Percent

Turbines receive the largest individual share of Exam 313. First Class candidates should understand steam-turbine principles and the auxiliary systems that make turbine operation safe and reliable.

  • Impulse and reaction concepts
  • Steam flow through turbines
  • Governors
  • Lubrication systems
  • Bearings
  • Condensers
  • Vacuum
  • Turning gear where applicable
  • Startup and shutdown
  • Overspeed and protective systems
  • Abnormal operating conditions

Study the turbine as a system. Steam conditions, lubrication, condenser performance, controls, protection, and operating sequence all work together.

Boiler Operations, Maintenance, and Safety Are 9 Percent

First Class is not just a turbine exam. Boiler operation remains a major part of the job and the test.

  • Startup and shutdown
  • Water-level control
  • Pressure control
  • Safety valves
  • Burner operation
  • Blowdown
  • Routine inspection
  • Preventive maintenance
  • Safe isolation
  • Response to abnormal conditions

Practice operator scenarios. Know what you would check first when water level, pressure, flame conditions, feedwater supply, or auxiliary equipment moves outside normal limits.

Water Treatment Is 8 Percent

Water treatment affects heat transfer, corrosion, scale, steam purity, equipment life, and safe plant operation.

  • Hardness
  • Scale formation
  • Corrosion
  • Dissolved oxygen
  • pH
  • Dissolved solids
  • Blowdown
  • Deaeration
  • Condensate return
  • Chemical-treatment purposes

Boiler Accessories and Auxiliary Equipment Are 8 Percent

A large plant depends on auxiliary equipment to improve efficiency, support combustion, handle water and condensate, and keep the steam cycle stable.

  • Economizers
  • Air preheaters
  • Feedwater heaters
  • Deaerators
  • Soot blowers
  • Fans and draft equipment
  • Condensers
  • Condensate equipment
  • Blowdown systems
  • Fuel-handling equipment

Electrical Is 8 Percent

First Class plant responsibility reaches into the electrical systems that power motors, pumps, fans, compressors, burners, chillers, controls, and auxiliaries.

  • Voltage, current, resistance, and power
  • Ohm's law
  • Basic AC systems
  • Motors
  • Transformers
  • Motor starters
  • Overcurrent protection
  • Basic control circuits
  • Electrical safety

Pumps, Feed, Hydronic, and Condensate Systems Are 8 Percent

Pumps and fluid systems connect the boiler, condenser, heating loops, cooling equipment, feedwater system, and condensate return.

  • Centrifugal pumps
  • Suction and discharge conditions
  • Cavitation
  • Feedwater pumps
  • Condensate systems
  • Hydronic circulation
  • Valves
  • Pump controls
  • Troubleshooting flow problems

Refrigeration, Air Conditioning, and Cooling Towers Are 8 Percent

First Class authority is broad enough that HVACR systems belong in the exam. Candidates should understand the refrigeration cycle and the plant equipment that supports it.

  • Compressors
  • Condensers
  • Evaporators
  • Chillers
  • Cooling towers
  • Heat rejection
  • Refrigerant-system operation
  • Air-conditioning fundamentals
  • Associated pumps and controls

Boiler Design and Principles Are 8 Percent

Study how boiler construction affects circulation, heat transfer, pressure containment, combustion, steam generation, maintenance, and operating characteristics.

  • Firetube boilers
  • Watertube boilers
  • Pressure parts
  • Heating surfaces
  • Water circulation
  • Steam separation
  • Combustion chambers
  • Boiler fittings
  • Design differences and operating effects

Environmental and Waste-to-Energy Topics Are 7 Percent

Advanced plant operators need basic knowledge of environmental and pollution-control systems.

  • Waste-to-energy concepts
  • Combustion byproducts
  • Particulate control
  • Flue-gas treatment
  • Emission-control equipment
  • Environmental operating concerns

Learn what each environmental-control device is intended to control and where it fits in the process.

Boiler Combustion and Fuels Are 7 Percent

Combustion questions connect fuels, burners, draft, air-fuel relationships, emissions, efficiency, and safe firing.

  • Fuel characteristics
  • Burner fundamentals
  • Combustion air
  • Excess air
  • Complete and incomplete combustion
  • Flue gases
  • Draft
  • Combustion efficiency

Engineering Calculations Are 7 Percent

First Class candidates should be comfortable setting up common stationary-engineering calculations without a reference book.

  • Boiler horsepower
  • Heat relationships
  • Efficiency
  • Pressure
  • Temperature
  • Flow
  • Basic turbine relationships
  • Electrical calculations
  • Unit conversions

Practice under time pressure and track units carefully.

Pneumatic and Electronic Controls Are 7 Percent

Controls coordinate boilers, burners, turbines, pumps, chillers, cooling towers, fans, valves, and other plant equipment.

  • Sensors
  • Controllers
  • Actuators
  • Pneumatic signals
  • Electronic signals
  • Relays and contactors
  • Motor-control logic
  • Control loops
  • Operating sequences
  • Basic troubleshooting

Exam 313 Is Closed Book

The current PSI bulletin identifies Exam 313 as closed book. The District's Stationary Engineers instructions also state that stationary-engineer examinations are closed book.

Reference books are therefore preparation tools, not exam-room lookup tools. Study with the books first, then practice without them.

Useful closed-book study methods include:

  • Drawing steam-cycle and turbine systems from memory
  • Explaining boiler startup and shutdown sequences aloud
  • Practicing formulas repeatedly
  • Using flashcards for equipment and terminology
  • Working troubleshooting scenarios
  • Taking timed 80-question practice sets without references

Current PSI Study References

PSI currently lists ten reference families for Exam 313 preparation. With the exception of the specified 2014 Ugly's Electrical Reference, PSI states that any edition of the other listed references is acceptable.

  • Boiler Operator's Workbook, ATP
  • Stationary Engineering, ATP
  • High Pressure Boilers, Harold J. Frost and Daryl R. Walker
  • Steam Plant Operation, McGraw Hill
  • Boiler Operator's Guide, McGraw Hill
  • Refrigeration and Air Conditioning Technology
  • Low Pressure Boilers, ATP
  • 2014 Ugly's Electrical Reference
  • Electric Motor Control for Integrated Systems, ATP
  • HVAC Control Systems, ATP

This broad reference list matches the broad Class 1 responsibility. The exam tests more than boiler construction, so your study library has to reach beyond boilers too.

The 1ExamPrep First Class Book Package

The Washington DC First Class Stationary Boilers Contractor Book Package combines ten technical references covering the broad Exam 313 outline.

The current package includes study resources covering high-pressure and low-pressure boilers, stationary engineering, steam-plant operation, refrigeration and air conditioning, electrical fundamentals, motor controls, HVAC controls, turbines, water treatment, combustion, pumps, and auxiliary systems.

Because Exam 313 is closed book, use the package as a training library. The goal is to absorb the systems and calculations well enough that you can work without the books on test day.

Class 1 vs. Class 2

Credential Plant Scope Experience Structure Current Exam
Steam Engineer, Class 2 High-pressure steam plant up to 750 total HP of boilers and engines or refrigeration machinery Class 3 experience foundation plus 1 year as assistant engineer in charge of a third-class plant Exam 314, 80 questions, 3 hours, closed book
Steam Engineer, Class 1 Experience and knowledge to take charge of and operate any plant Class 3 experience foundation plus 2 additional years, including the specified higher-level plant year Exam 313, 80 questions, 3 hours, closed book

Interestingly, the current PSI blueprints for Exams 313 and 314 use the same published content percentages and the same 80-question, three-hour closed-book format. The licensing scope and experience progression, however, are not the same.

Current Fees and Renewal Calendar

The Board of Industrial Trades currently lists a $65 application fee for Steam and Other Operating Engineers.

The current license fee is $110 for up to two years. The current renewal fee is also $110, and the Board lists a $50 late-renewal fee.

Steam and Other Operating Engineer licenses currently expire on September 30 of even-numbered years.

PSI separately lists a current $52 CBT fee for Exam 313.

A Practical Exam 313 Study Plan

  1. Start with Turbines. It is the largest category at 15 percent.
  2. Review Boiler Operations, Maintenance, and Safety every week.
  3. Rotate Water Treatment, Auxiliaries, Electrical, Pumps, HVACR, and Boiler Design. Each is 8 percent.
  4. Keep Environmental Controls, Combustion, Engineering Calculations, and Controls in regular rotation. Each is 7 percent.
  5. Draw complete steam-cycle and turbine systems from memory.
  6. Practice engineering calculations without reference books.
  7. Use troubleshooting scenarios for boilers, turbines, pumps, controls, and refrigeration systems.
  8. Review environmental systems and waste-to-energy concepts.
  9. Practice 80-question closed-book sets.
  10. Take full practice exams at the 3-hour time limit.

Prepare for Plant-Level Responsibility

First Class preparation should feel like learning the whole plant. A Class 1 Steam Engineer may need to understand what happens when a turbine loses condenser vacuum, a feedwater pump cavitates, boiler-water chemistry goes out of range, a burner loses proper air-fuel ratio, a chiller loses heat rejection, a motor-control circuit fails, or an environmental-control system trips.

Connect the systems instead of memorizing isolated chapters. Follow energy, steam, water, condensate, fuel, electricity, refrigerant, control signals, and heat through the plant.

Review the Washington DC First Class Stationary Boilers Contractor collection at 1ExamPrep for exam-focused study materials.

For the technical library, review the First Class Stationary Boilers Contractor Book Package.

For licensing support, review 1ExamPrep application services. For books, exam preparation, licensing expenses, and related professional costs, review 1ExamPrep financing options.

Frequently Asked Questions

The District credential associated with Exam 313 is Steam Engineer, Class 1. The 1ExamPrep collection name includes "Contractor," but the license itself is an individual Steam Engineer credential.

Current District regulations say a Class 1 applicant must have the experience and knowledge to take charge of and operate any plant.

Class 1 requires the Class 3 experience foundation plus two additional years of experience. One of those two years must be as an engineer in a second-class plant, or as a Class 2 Steam Engineer and assistant engineer in a first-class plant while holding a Class 2 license.

The currently posted DLCP application sheet says the two-year Class 3 route uses a high-pressure steam plant above 750 boiler horsepower, while the currently posted D.C. regulation text says above 75 boiler horsepower. Because Class 1 builds on Class 3 experience, applicants should confirm the threshold with the Board before relying on either number.

The District's current Stationary Engineers instructions state that there is no general waiver or reciprocity for stationary engineers.

The current PSI examination is 313 Washington DC First Class Stationary Boilers.

The current exam contains 80 multiple-choice questions.

Candidates currently receive three hours.

No. The current First Class Stationary Boilers examination is closed book.

Turbines, Design Auxiliaries, and Operations is the largest published category at 15 percent.

Yes. Refrigeration, Air Conditioning, and Cooling Towers represent 8 percent of the current blueprint.

Yes. Electrical is 8 percent, while Pneumatic and Electronic Controls represent another 7 percent.

PSI lists ten reference families covering boilers, stationary engineering, steam-plant operation, refrigeration and air conditioning, electrical reference material, motor controls, and HVAC controls. The current bulletin specifically lists 2014 Ugly's Electrical Reference.

Steam and Other Operating Engineer licenses currently expire September 30 of even-numbered years.

Conclusion

The Washington, DC First Class Stationary Boilers examination is the testing path associated with the individual Steam Engineer, Class 1 credential. Although the 1ExamPrep collection title uses the word "Contractor," the District license tied to Exam 313 is an individual stationary-engineer license.

Class 1 is the broadest steam-engineer class identified in the District's current application instructions. Current D.C. regulations require the experience and knowledge to take charge of and operate any plant.

The experience pathway builds on Class 3. A Class 1 applicant needs two years of experience in addition to the experience required for the Class 3 Steam Engineer license. At least one of those two years must be as an engineer in a second-class plant, or as a Class 2 Steam Engineer and assistant engineer in a first-class plant while holding a Class 2 license.

Applicants should document the progression carefully. The Board should be able to see the underlying Class 3 qualification, the two additional Class 1 years, and the specific higher-level plant year required by the regulation.

There is also an official-source conflict worth resolving before application. The currently posted DLCP application sheet says the two-year Class 3 route requires experience in a high-pressure plant above 750 boiler horsepower. The currently posted D.C. regulation text says above 75 boiler horsepower. Because Class 1 depends on the Class 3 foundation, applicants should confirm the correct threshold with the Board of Industrial Trades.

The current licensing examination is Exam 313 Washington DC First Class Stationary Boilers. It contains 80 multiple-choice questions, allows three hours, is closed book, and currently carries a $52 computer-based testing fee.

Turbines, Design Auxiliaries, and Operations is the largest exam category at 15 percent. Boiler Operations, Maintenance, and Safety is 9 percent. Water Treatment, Boiler Accessories and Auxiliary Equipment, Electrical, Pumps and Condensate Systems, Refrigeration/Air Conditioning/ Cooling Towers, and Boiler Design and Principles are each 8 percent.

Waste-to-Energy and Environmental/Pollution Control is 7 percent. Boiler Combustion and Fuels is 7 percent. Engineering Calculations is 7 percent. Pneumatic and Electronic Controls are also 7 percent.

The blueprint is broad because Class 1 plant responsibility is broad. Candidates should not study as though boilers are the only thing in the building. Turbines, refrigeration equipment, cooling towers, pumps, motors, controls, environmental systems, water treatment, and engineering calculations all receive meaningful exam weight.

The closed-book format makes active recall essential. Use the books to learn the systems, then practice without them. Draw plant diagrams, explain operating sequences, work formulas, review safety scenarios, and solve troubleshooting problems without immediately checking the answer.

PSI currently lists ten reference families for Exam 313, including boiler, stationary-engineering, steam-plant, refrigeration, electrical, motor-control, and HVAC-control resources. The current PSI bulletin specifically identifies 2014 Ugly's Electrical Reference and states that any edition of the other listed references is acceptable.

The current 1ExamPrep First Class Stationary Boilers Contractor Book Package combines those ten technical areas into one study library. Since the exam is closed book, the package is most useful when it is used to build understanding, calculations, recall, and system-level thinking before test day.

The District's current application instructions also state that there is no general waiver or reciprocity for stationary engineers. Applicants with licenses from other jurisdictions should still plan to satisfy the District's own Class 1 licensing process.

Steam and Other Operating Engineer licenses currently expire September 30 of even-numbered years. The Board currently lists a $65 application fee, $110 license fee, $110 renewal fee, and $50 late-renewal fee.

Strong Class 1 preparation is plant-level preparation. Understand how steam, feedwater, turbines, condensate, pumps, motors, controls, refrigeration, cooling towers, fuel systems, environmental equipment, and water treatment connect. That systems-level understanding matches both the Class 1 responsibility and the current Exam 313 blueprint.

Key Takeaways

  • The District credential tied to Exam 313 is Steam Engineer, Class 1, while the 1ExamPrep collection name includes "Contractor."
  • Class 1 requires the experience and knowledge to operate any plant, plus two years beyond the Class 3 experience foundation, including a specified higher-level plant year.
  • The currently posted DLCP application sheet and D.C. regulation disagree on whether the two-year Class 3 route uses a plant above 750 BHP or above 75 BHP, so applicants should confirm the threshold with the Board.
  • Exam 313 currently has 80 multiple-choice questions, allows 3 hours, is closed book, and gives its largest weight, 15 percent, to turbines, design auxiliaries, and operations.
  • Steam Engineer licenses currently expire September 30 of even-numbered years, and current Board fees list $65 application, $110 license, and $110 renewal charges.

Plain-Language Summary

Washington, DC's First Class Stationary Boilers exam is connected to the Steam Engineer, Class 1 license. The 1ExamPrep product title includes the word "Contractor," but the District credential itself is an individual Class 1 Steam Engineer license.

Class 1 is the highest steam-engineer class identified in the District's current application instructions. The D.C. regulation says a Class 1 applicant must have the experience and knowledge to take charge of and operate any plant.

Class 1 builds on Class 3 experience. You need two additional years beyond the experience required for Class 3. One of those two years must be as an engineer in a second-class plant, or as a Class 2 Steam Engineer and assistant engineer in a first-class plant while holding a Class 2 license.

The underlying Class 3 requirement has its own experience rules. There is also a one-year Class 3 experience reduction for certain mechanical-engineering graduates and graduates of approved engineer apprentice training programs.

There is one important source conflict to resolve before you apply. The current DLCP application sheet says the two-year Class 3 route uses a high-pressure steam plant above 750 boiler horsepower. The current D.C. regulation text says above 75 boiler horsepower. Since Class 1 eligibility depends on Class 3 experience, ask the Board which threshold it is applying.

The District currently says there is no general waiver or reciprocity for stationary engineers. If you hold a first-class or chief engineer license somewhere else, do not assume it replaces the DC process.

The current exam is Exam 313 Washington DC First Class Stationary Boilers. It has 80 multiple-choice questions and gives you three hours. The exam is closed book, and PSI currently lists a $52 computer-based testing fee.

Turbines, Design Auxiliaries, and Operations is the largest section at 15 percent. Boiler Operations, Maintenance, and Safety is 9 percent. Water Treatment is 8 percent. Boiler Accessories and Auxiliary Equipment is 8 percent. Electrical is 8 percent. Pumps and Condensate Systems are 8 percent. Refrigeration, Air Conditioning, and Cooling Towers are 8 percent. Boiler Design and Principles are also 8 percent.

Waste-to-Energy and Environmental/Pollution Control is 7 percent. Boiler Combustion and Fuels is 7 percent. Engineering Calculations is 7 percent. Pneumatic and Electronic Controls are another 7 percent.

Because the exam is closed book, study for recall. Learn the systems, then close the book and explain them. Draw a turbine system, steam cycle, feedwater system, condensate loop, refrigeration cycle, control loop, and major plant auxiliaries from memory.

Practice calculations without a reference beside you. Exam 313 gives you about 2.25 minutes per question on average, so you should be able to recognize common formulas and set them up quickly.

PSI currently lists ten reference families for preparing for Exam 313. They cover boilers, stationary engineering, steam plants, refrigeration, electrical systems, motor controls, and HVAC controls. The bulletin specifically lists 2014 Ugly's Electrical Reference.

The 1ExamPrep First Class Stationary Boilers Contractor Book Package combines these topics into one broad study library. Because the test is closed book, use the books to build knowledge before test day rather than expecting to use them during the exam.

Steam Engineer applicants currently need an Employment Verification Letter plus the District's standard identification, photo, and payment materials. Keep experience records detailed enough to show plant class, plant size, job title, dates, and responsibility.

Steam and Other Operating Engineer licenses currently expire September 30 of even-numbered years. The Board currently lists a $65 application fee, $110 license fee, and $110 renewal fee.

Use the Washington DC First Class Stationary Boilers Contractor collection from 1ExamPrep to review study materials for Exam 313, turbines, boiler operation, water treatment, controls, pumps, refrigeration, electrical systems, environmental controls, calculations, and closed-book preparation.